Matters ▸ Attachment
Committee Report - T&P - 9-9-15 — File 199885
Traffic and Parking Committee
Page 1 of 6
Printed 9/10/2015
September 9, 2015
REPORT OF THE TRAFFIC AND PARKING COMMITTEE
Attendee Name
Title
Status
Arrived
Robert J. McWatters
Chair
Present
Rebekah L. Gewirtz
Vice Chair
Absent
Tony Lafuente
Ward Four Alderman
Present
Others present: Suzanne Rinfret - T&P, Terry Smith - T&P, Brad Rosen - OSPCD
1.
Approval of the May 13, 2015 Minutes
RESULT:
ACCEPTED
196185: That the Commissioner of Public Works provide a timeline to replace the traffic
signal at the intersection of Washington and Beacon Streets.
RESULT:
WORK COMPLETED
196311: That the Administration report to this Board the timetable for using the $220,000
in traffic mitigation funds paid by Maxwell's Green in 2011 for traffic-slowing measures on
both sides of the Lowell Street bridge.
RESULT:
KEPT IN COMMITTEE
196436: That the Administration report to this Board on plans to slow traffic on Lowell
Street, make its intersections safer, and use the $220,000 contributed by Maxwell's Green
for traffic calming.
RESULT:
KEPT IN COMMITTEE
197023: That the Director of SPCD (T&I) develop a plan for a pedestrian crosswalk at
Vernon Street and Lowell Street and report to this Board and the Ward 5 Alderman on
how that would be incorporated into the Lowell Street bridge traffic calming project.
Traffic and Parking Committee
Page 2 of 6
Printed 9/10/2015
RESULT:
KEPT IN COMMITTEE
197707: That the Traffic Commission consider eliminating the requirement that before a
temporary speed bump can be installed, 66% of residents on the street must formally agree
to request it.
RESULT:
WORK COMPLETED
197890: That the Director of Traffic and Parking and the Superintendent of Inspectional
Services update this Board on safety measures undertaken at the Elm Street bus stop
located in front of Dunkin Donuts.
The issue was addressed by Mr. Smith.
RESULT:
WORK COMPLETED
197981: That the Commissioner of Public Works determine if it is feasible to place a bump
out at the corner of Bonner and Columbus Avenues.
RESULT:
KEPT IN COMMITTEE
198570: That the Director of Traffic and Parking inform this Board and the School
Committee about enforcing parking regulations during street cleaning near schools in the
morning between 8 and 8:30 AM.
Ms. Rinfret stated that ticketing doesn't begin until 8:45 AM
RESULT:
WORK COMPLETED
198725: That the Director of SPCD update this Board on the status of Mass DOT work on
McGrath Highway.
Mr. Rosen spoke about the need to replace signal work and also discussed the elimination of parking
on Medford Street. Chairman McWatters requested that the residents on Medford Street be kept
apprised on the matter.
RESULT:
WORK COMPLETED
199058: That the Director of Traffic and Parking appear before this Board to discuss the
on-street parking permits given to Tufts University employees.
RESULT:
WORK COMPLETED
199135: That the Director of Traffic and Parking repair the damaged NO LEFT TURN
Traffic and Parking Committee
Page 3 of 6
Printed 9/10/2015
sign at Cameron Avenue and Mead Street.
RESULT:
WORK COMPLETED
199137: That the Director of Traffic and Parking confirm whether parking is allowed in
the middle of the end of Fairmount Street abutting Russell Road, and address installing a
NO PARKING sign there.
According to Mr. Smith, parking is not allowed in that area.
RESULT:
WORK COMPLETED
199244: That the Commissioner of Public Works or the Director of Traffic and Parking
install traffic calming measures on Cameron Avenue and Clarendon Avenue.
Mr. Smith prepared a matrix and has submitted it to the Administration. It will be provided to the BOA.
RESULT:
KEPT IN COMMITTEE
199269: That the Director of Traffic and Parking replace the missing Hanson street sign at
Village and Hanson Streets and install a ONE WAY sign for Hanson Street.
RESULT:
WORK COMPLETED
199271: That the Director of Traffic and Parking re-paint crosswalk striping on Somerville
Avenue to distinguish the brick paved pedestrian crosswalks.
RESULT:
WORK COMPLETED
199278: That the Mayor’s Office provide to this Board by June 11, the consultant's study
on the Traffic Commission's regulations for the public process to request traffic calming
measures.
RESULT:
WORK COMPLETED
199280: That the Director of Traffic and Parking and the Commissioner of Public Works
report to this Board on the placement of NO IDLING signs at all public schools.
RESULT:
KEPT IN COMMITTEE
199281: That the Director of Traffic and Parking or the Commissioner of Public Works
prevent vehicles from parking on the east side of Cedar Street at the Community Path
Extension, as automotive fluids are staining the Path Extension.
Traffic and Parking Committee
Page 4 of 6
Printed 9/10/2015
RESULT:
WORK COMPLETED
199282: That the Director of Traffic and Parking suggest traffic calming measures on
Pembroke Street to slow traffic that cuts through to avoid the traffic light at Central and
Medford Streets.
RESULT:
KEPT IN COMMITTEE
199283: That the Director of Traffic and Parking consider installing a NO PARKING spot
on the south side of Vernon Street at Trull Street to allow fire engines to turn onto Trull
Street, and report back to the Ward 5 Alderman.
RESULT:
WORK COMPLETED
199343: That the Administration arrange for members of the Boxing Club to park in the
East Somerville Community School parking lot weekdays 4-9PM.
RESULT:
WORK COMPLETED
199360: DPW Commissioner responding to various Board Orders submitted 4/23/15.
RESULT:
WORK COMPLETED
199362: Traffic and Parking Director submitting responses to various Board Orders
submitted 4/23/15.
RESULT:
WORK COMPLETED
199415: That the Director of Traffic and Parking consider changing the signage on side
streets that only allow access to abutters at certain times of the day, by changing the word
abutters to residents.
Mr. Smith explained why the term "abutters" is the correct language.
RESULT:
WORK COMPLETED
199456: That the Director of Traffic and Parking conduct a traffic study on Lincoln and
Perkins Streets and propose traffic calming measures.
RESULT:
KEPT IN COMMITTEE
199462: That the Director of Traffic and Parking install solar blinking lights at the
pedestrian crossing at 270 Washington Street.
Traffic and Parking Committee
Page 5 of 6
Printed 9/10/2015
RESULT:
WORK COMPLETED
199463: That the Director of Traffic and Parking consider traffic calming measures to
reduce the speed of vehicles around Hoyt-Sullivan Park, including applying to reduce the
speed limit on the entirety of Central Street to 20 or 25 mph.
Mr. Smith explained the prioritization process and said that the Administration would come up with an
overall plan.
RESULT:
WORK COMPLETED
199563: Traffic and Parking Director submitting responses to various Board Orders
submitted 5/14/15.
RESULT:
WORK COMPLETED
199564: DPW Commissioner responding to various Board Orders submitted 5/28/15.
RESULT:
WORK COMPLETED
199571: That the Committee on Traffic and Parking investigate why the directive in
#198726, regarding notification to residents, property owners, and businesses of changes to
parking regulations along Medford Street with respect to the McGrath Highway project,
was not complied with.
Mr. Rosen reported that the city has increased its outreach and Mr. Smith added that proper notice was
provided.
RESULT:
WORK COMPLETED
199586: That the Director of Traffic and Parking and the Director of the Office of
Sustainability and the Environment report to this Board on the design, placement,
effectiveness and enforcement of “NO IDLING” signs by all schools.
RESULT:
WORK COMPLETED
199662: That the Director of Traffic and Parking consider installing a crosswalk at 64
College Avenue.
Mr. Smith explained that there is no sight distance for a crosswalk.
RESULT:
WORK COMPLETED
199690: That the Director of Traffic and Parking and the Chief of Police inspect, monitor
and develop a plan to control the speed of traffic on Medford Street, between Central and
Traffic and Parking Committee
Page 6 of 6
Printed 9/10/2015
School Streets.
RESULT:
WORK COMPLETED
199691: That the Director of Traffic and Parking inspect the corners of James and
Marshall Streets, at their intersection with Pearl Street, and suggest a plan to increase
visibility for motorists who are turning onto Pearl Street.
RESULT:
WORK COMPLETED
199693: That the Director of Traffic and Parking install a crosswalk at the intersection of
Thurston and Fenwick Streets and Broadway.
Mr. Smith stated that this site would be a dangerous location for a crosswalk and added that there is not
enough pedestrian traffic at this location. Alderman Lafuente would like the area re-worked. Mr. Rosen
said that the city has been working on this.
RESULT:
WORK COMPLETED
199697: That the Chief of Police order directed patrols on Greenville Street from 7 to 9 AM
and 4 to 6 PM, to ensure that motorists aren't illegally cutting through Prospect Hill.
RESULT:
WORK COMPLETED
199700: That the Traffic Commission consider installing a temporary speed bump on
Governor Winthrop Road near Grimmons Park to protect children from speeding vehicles.
RESULT:
KEPT IN COMMITTEE
199707: That the Director of Traffic and Parking report to the Ward 7 Alderman on a plan
to clear up the confusing signage at Capen Street, 405 Alewife Brook Parkway and Capen
Court.
RESULT:
WORK COMPLETED
199752: Traffic and Parking Director responding to #199586 re: "No Idling" signage at
schools.
RESULT:
KEPT IN COMMITTEE