Cedar Street Sewer Repairs — File 200062
CAMBRIDGE
ELM ST
SUMMER ST
HIGHLAND AVE
LOWELL ST
ALBION ST
CEDAR ST
HUDSON ST
SOMERVILLE AVE
BEACON ST
CENTRAL ST
PORTER ST
BELMONT ST
WILLOW AVE
CHERRY ST
HANCOCK ST
ALPINE ST
LINDEN AVE
CRAIGIE ST
BENTON RD
LEXINGTON AVE
PITMAN ST
SPRING ST
BANKS ST
CROWN ST
HALL ST
HARVARD ST
ATHERTON ST
TOWER ST
GIBBENS ST
SPENCER AVE
IBBETSON ST
BURNSIDE AVE
BRASTOW AVE
HARRISON ST
ST JAMES AVE
WINDSOR RD
CROCKER ST
CAMBRIA ST
HARRIS ST
PRINCETON ST
ASHLAND ST
CHARNWOOD RD
BEECH ST
KENT ST
MILLER ST
SPRING HILL TER
SILVEY PL
KENT CT
WESTWOOD RD
WOODBINE ST
WHITE ST
MONMOUTH ST
CLEVELAND ST
LESLEY AVE
WALDO ST
SARTWELL AVE
MOSSLAND ST
GARDEN CT
HENRY AVE
CONWELL ST
KIMBALL ST
CEDAR AVE
WHIPPLE ST
CENTRE ST
EASTMAN RD
HOLYOKE RD
WHITE ST PL
MOUNTAIN AVE
ACADIA PARK
SACRAMENTO ST
PORTER AVE
LINDEN PL
OLIVE AVE
ALBION PL
OXFORD ST
PARKER PL
GOULD AVE
WADE CT
STANFORD TER
CARVER ST
FAIRLEE ST
PRENTISS ST
BELMONT PL
WILLIAMS CT
PRIVATE DRIVE
FOREST ST
DANTE TER
HILLSIDE CIR
LOWELL CIR
MARDELL CIR
GOVE CT
ALBION CT
ADELAIDE RD
CRAIGIE TER
BEACON TER
PIPER AVE
ALBION TER
²
0
500
250
Feet
WATER, SEWER
& DRAINAGE
IMPROVEMENT PROJECT
CEDAR ST & ELM ST
Parcels
Hospital
Open Space
Public Building
Project Area
WSE Job No. 2130636
6/12/2015
ENGINEER'S COST ESTIMATE
DONE BY: Paul Greco
CHECKED BY: David Elmer
CITY OF SOMERVILLE, MASSACHUSETTS
CEDAR STREET SEWER SEPARATION PROJECT
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
ROADWAY RECONSTRUCTION ITEMS
Individual tree protection
102.51
EA
13
$220.00
$2,860.00
Remove & reset tree
102.52
EA
2
$500.00
$1,000.00
Tree removed - diameter under 24 inches
103.
EA
12
$850.00
$10,200.00
Tree removed - diameter 24 inches and over
104.
EA
4
$2,000.00
$8,000.00
Unclassified excavation
120.1
CY
2610
$30.00
$78,300.00
Pavement milling
129.
SY
1250
$50.00
$62,500.00
Gravel borrow
151.
CY
2320
$32.00
$74,240.00
Controlled density fill - Excavatable
153.
CY
190
$130.00
$24,700.00
Fine grading and compacting
170.
SY
8350
$2.00
$16,700.00
Dense graded crushed stone for sub-base
402.
CY
310
$54.00
$16,740.00
Reclaimed pavement for base course and/or
sub-base
403.
SY
5600
$7.00
$39,200.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
Crushed stone for blending
403.1
TON
420
$19.00
$7,980.00
HMA base course
420.
TON
1250
$70.00
$87,500.00
Calcium chloride for roadway dust control
440.
LBS
5600
$0.40
$2,240.00
Water for roadway dust control
443.
MGL
20
$50.00
$1,000.00
HMA surface course - modified top
450.21
TON
970
$115.00
$111,550.00
HMA for patching
451.
TON
1150
$175.00
$201,250.00
Asphalt emulsion for tack coat
452.
GAL
610
$8.00
$4,880.00
Hot poured rubberized asphalt sealer
464.5
FT
3800
$4.00
$15,200.00
Hot mix asphalt for miscellaneous work
472.
TON
83
$175.00
$14,525.00
Sawing asphalt pavement
482.3
FT
650
$2.50
$1,625.00
Sawing concrete pavement
482.4
FT
110
$3.00
$330.00
Granite curbType VA3 - straight
504.
FT
100
$45.00
$4,500.00
Granite curb Type VA3 - curved
504.1
FT
3
$50.00
$150.00
Granite transition curb for wheelchair ramps -
straight
509.
FT
830
$40.00
$33,200.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
Granite transition curb fror wheelchair
ramps - curved
509.1
FT
230
$45.00
$10,350.00
Granite curb inlet - straight
514.
EA
14
$300.00
$4,200.00
Curb removed and reset
580.
FT
2010
$20.00
$40,200.00
Fence removed and reset
670.
FT
49
$42.00
$2,058.00
Silt sack
697.1
EA
64
$140.00
$8,960.00
Cement concrete sidewalk
701.
SY
1310
$53.00
$69,430.00
Cement concrete sidewalk wheelchair ramps
701.2
SY
240
$75.00
$18,000.00
Hot mix asphalt driveway
703.
TON
70
$175.00
$12,250.00
Mailbox removed and reset
715.1
EA
1
$200.00
$200.00
Loam borrow
751.
CY
2
$40.00
$80.00
Seeding
765.
SY
15
$1.50
$22.50
Karpick Red Maple
776.
EA
5
$675.00
$3,375.00
3-inch electrical conduit Type NM - Plastic
(UL)
804.3
FT
250
$32.52
$8,130.00
Service connection (underground)
813.81
EA
1
$3,000.00
$3,000.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
Traffic control signal - Summer Street
815.1
LS
1
$150,000.00
$150,000.00
Traffic control signal removed & stacked
816.80
LS
1
$6,000.00
$6,000.00
Warning-regulatory and route marker - alum.
Panel (Type A)
832.
SF
35
$10.00
$350.00
Sign support and route marker w/breakaway
post assembly - steel
847.1
EA
5
$100.00
$500.00
Traffic cones for traffic management
851.1
DAY
340
$140.00
$47,600.00
Safety signing for traffic management
852.
SF
150
$20.00
$3,000.00
Portable breakaway barricade - Type III
853.1
EA
2
$130.00
$260.00
Temporary paving markings - 6-inch (painted)
854.016
FT
2000
$0.25
$500.00
Arrow board
856.
DAY
340
$11.00
$3,740.00
Portable changeable message sign
856.12
DAY
140
$22.00
$3,080.00
Reflectorized drum
859.
DRUM-
DAYS
3400
$0.25
$850.00
Pavement arrows and legends reflectorized
white (epoxy)
864.041
SF
120
$4.00
$480.00
4 inch reflectorized white line (epoxy)
868.04
FT
1950
$1.00
$1,950.00
6 inch reflectorized white line (epoxy)
868.06
FT
3170
$4.00
$12,680.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
12 inch reflectorized white line (epoxy)
868.12
FT
710
$2.50
$1,775.00
Bicycle symbol white (epoxy)
868.3
SF
55
$4.00
$220.00
6 inch reflectorixed yellow line (epoxy)
869.06
FT
100
$1.50
$150.00
Green paint for bike lanes (epoxy)
869.1
SF
9000
$3.00
$27,000.00
Traffic sign removed and reset
874.2
EA
28
$91.00
$2,548.00
Miscellaneous sign removed and reset
874.21
EA
1
$150.00
$150.00
SUBTOTAL
$1,263,458.50
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
DRAINS COMPLETE IN PLACE
1
15-inch Class IV RCP drains
1a
LF
200
$200.00
$40,000.00
18-inch Class IV RCP drains
1b
LF
87
$250.00
$21,750.00
21-inch Class IV RCP drains
1c
LF
30
$300.00
$9,000.00
36-inch Class IV RCP drains, 5' to 10' deep
1d
LF
32
$325.00
$10,400.00
36-inch Class IV RCP drains, 10' to 15' deep
1e
LF
254
$475.00
$120,650.00
42-inch DI drains
1f
LF
244
$300.00
$73,200.00
48-inch Class IV RCP drains, 5' to 10' deep
1g
LF
805
$350.00
$281,750.00
48-inch Class IV RCP drains, 10' to 15' deep
1h
LF
1459
$500.00
$729,500.00
12-inch catch basin lateral
1i
LF
575
$100.00
$57,500.00
SUBTOTAL
$1,343,750.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
SEWERS COMPLETE IN PLACE
2
8-inch PVC pipe
2a
LF
153
$200.00
$30,600.00
8-inch DI pipe
2b
LF
35
$250.00
$8,750.00
12-inch PVC pipe, 5' to 10' deep
2c
LF
273
$200.00
$54,600.00
12-inch PVC pipe, 10' to 15' deep
2d
LF
503
$250.00
$125,750.00
12-inch PVC pipe, 15' to 20' deep
2e
LF
948
$350.00
$331,800.00
SUBTOTAL
$551,500.00
BUILDING CONNECTION SYSTEMS
3
12X6 wye or tee branches
3a
EA
62
$500.00
$31,000.00
8X6 wye or tee branches
3b
EA
1
$500.00
$500.00
Chimney
3c
VF
165
$100.00
$16,500.00
6-inch building connections
3d
LF
1380
$100.00
$138,000.00
Push camera inspection of existing building
connection
3e
EA
84
$500.00
$42,000.00
Dye testing of existing building connection
3f
EA
46
$500.00
$23,000.00
Relocate Elm Street sewer service to separate
sewer
3g
EA
19
$5,000.00
$95,000.00
SUBTOTAL
$346,000.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
MANHOLES AND CATCH BASINS
4
4' diameter precast concrete manhole base
4a
EA
14
$2,500.00
$35,000.00
4' diameter precast concrete manhole walls &
cones
4b
VF
183
$550.00
$100,650.00
6' diameter precast concrete manhole base
4c
EA
3
$3,000.00
$9,000.00
6' diameter precast concrete manhole walls &
cones
4d
VF
34
$795.00
$27,030.00
8' diameter precast concrete manhole base
4e
EA
2
$5,000.00
$10,000.00
8' diameter precast concrete manhole walls &
cones
4f
VF
17
$1,335.00
$22,695.00
10' diameter precast concrete manhole base
4g
EA
1
$7,500.00
$7,500.00
10' diameter precast concrete manhole walls
& cones
4h
VF
13
$961.00
$12,493.00
4' tee precast concrete manhole base
4i
EA
2
$890.00
$1,780.00
4' tee precast concrete manhole walls & cones
4j
VF
27
$890.00
$24,030.00
7' x 7' precast box manhole base
4k
VF
3
$10,000.00
$30,000.00
7' x 7' precast box manhole walls and top slab
4l
VF
25
$1,000.00
$25,000.00
Furnish & install 14' x 8' precast concrete
vault complete
4m
LS
1
$100,000.00
$100,000.00
Precast concrete catch basin (TYPE A) with
single frame & cascade grate
4n
EA
5
$5,000.00
$25,000.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
Precast concrete catch basin (TYPE A) with
double frame & cascade grate
4o
EA
15
$5,000.00
$75,000.00
Precast concrete catch basin (TYPE B) with
single frame & cascade grate
4p
EA
4
$7,500.00
$30,000.00
Precast concrete catch basin (TYPE B) with
double frame & cascade grate
4q
EA
7
$7,500.00
$52,500.00
Furnish & install manhole frame and cover
4r
EA
21
$1,200.00
$25,200.00
Furnish & install bolted & gasketed
watertight frame and cover
4s
EA
4
$2,000.00
$8,000.00
Abandon manhole or catch basin
4t
EA
3
$1,000.00
$3,000.00
Cementitious lining of manholes
4u
VF
42
$150.00
$6,300.00
SUBTOTAL
$630,178.00
CLEANING AND INSPECTION OF
SEWERS
5
Cleaning and inspection of 8-inch to 12-inch
sewers
5a
LF
910
$4.00
$3,640.00
SUBTOTAL
$3,640.00
CURED-IN-PLACE PIPE
6
8-inch cured-in-place pipe
6a
LF
213
$60.00
$12,780.00
12-inch cured-in-place pipe
6b
LF
838
$80.00
$67,040.00
Grout reinstated service connections
6c
EA
10
$600.00
$6,000.00
SUBTOTAL
$85,820.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
WATER MAINS AND FITTINGS
7
6-inch ductile iron pipe & fittings
7a
LF
35
$100.00
$3,500.00
8-inch ductile iron pipe & fittings
7b
LF
482
$140.00
$67,480.00
12-inch ductile iron pipe & fittings
7c
LF
2493
$140.00
$349,020.00
Additional fittings
7d
LBS
2000
$10.00
$20,000.00
SUBTOTAL
$440,000.00
POLYETHYLENE ENCASEMENT
8
Polyethylene encasement
8a
LF
3010
$2.00
$6,020.00
SUBTOTAL
$6,020.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
HYDRANTS AND VALVES
9
Hydrant assembly
9a
EA
6
$5,000.00
$30,000.00
Remove existing hydrant
9b
EA
6
$500.00
$3,000.00
6-inch gate valve
9c
EA
1
$2,500.00
$2,500.00
8-inch gate valve
9d
EA
7
$2,500.00
$17,500.00
12-inch gate valve
9e
EA
11
$3,500.00
$38,500.00
Furnish & Install Check Valve Manhole
9f
LS
1
$25,000.00
$25,000.00
SUBTOTAL
$116,500.00
WATER SERVICE CONNECTIONS
10
3/4" corporation stops
10a
EA
77
$1,000.00
$77,000.00
3/4" curb stops
10b
EA
77
$300.00
$23,100.00
3/4" copper piping and fittings
10c
LF
1482
$35.00
$51,870.00
SUBTOTAL
$151,970.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
TEMPORARY SERVICE PIPING
11
2-inch temporary service main
11a
LF
2382
$15.00
$35,730.00
4-inch temporary service main
11b
LF
1742
$15.00
$26,130.00
SUBTOTAL
$61,860.00
MISCELLANEOUS EARTHWORK
12
Excavation and backfill of unsuitable material
above normal grade
12a
CY
12900
$12.00
$154,800.00
Excavation and backfill of unsuitable material
below normal grade
12b
CY
600
$18.00
$10,800.00
Removal and disposal of Group A
contaminated Material
12c
TON
490
$45.00
$22,050.00
Removal and off-site treatment/recycling of
Group B contaminated material
12d
TON
120
$60.00
$7,200.00
Test pits
12e
CY
500
$100.00
$50,000.00
Bentonite clay dams
12f
CY
50
$500.00
$25,000.00
Additional crushed stone
12g
CY
100
$10.00
$1,000.00
Additional concrete encasement
12h
CY
100
$30.00
$3,000.00
SUBTOTAL
$273,850.00
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
ROCK EXCAVATION AND DISPOSAL
13
Rock excavation and disposal (min)
13a
CY
575
$100.00
$57,500.00
Rock excavation and disposal (add'l)
13b
CY
575
$50.00
$28,750.00
SUBTOTAL
$86,250.00
SEWER, WATER, AND DRAIN
RECONSTRUCTION
14
Sewer, water, and drain reconstruction within
trench limits
14a
EA
18
$1,200.00
$21,600.00
SUBTOTAL
$21,600.00
TEMPORARY BYPASS PUMPING
SYSTEM
15
Temporary bypass pumping system
15a
LS
1
$25,000.00
$25,000.00
SUBTOTAL
$25,000.00
RODENT CONTROL
16
Rodent control, lump sum
16a
LS
1
$5,000.00
$5,000.00
SUBTOTAL
$5,000.00
MOBILIZATION
17
Mobilization
17a
LS
1
$268,984.38
$284,069.04
SUBTOTAL
$284,069.04
UNIT COST TOTAL AMOUNT
UNIT
QUANTITY
DESCRIPTION
ITEM #
PRICE ADJUSTMENTS
18
Price Adjustment for Diesel fuel used in
excavation and borrow work, where price
variance is five (5) percent or greater
18a
GALLONS
3702
$0.23
$851.46
Price Adjustment for Gasoline used in
excavation and borrow work, where price
variance is five (5) percent or greater
18b
GALLONS
2931
$0.21
$615.51
Price Adjustment for Diesel fuel used in
surfacing work (paving), where price variance
is five (5) percent or greater
18c
GALLONS
9019
$0.23
$2,074.37
Price Adjustment for Liquid Asphalt used in
hot mix asphalt mixtures, where price
variance is five (5) percent or greater
18d
TONS
171
$54.25
$9,276.75
SUBTOTAL
$12,818.09
CONTINGENCY:
$285,464.18
TOTAL
$5,994,747.82
5%
SUBTOTAL
$5,709,283.63