Lincoln Park Estimated Costs-PDF — File 200539
Weston Sampson
3/2/2016
Page 1
11-Jan-16
City of Somerville, Massachusetts
Lincoln Park Improvements
Overall Project Budget - Opinion of Probable Cost
Total Cost for Site Improvements
SUBTOTAL
7,464,285
$
Mobilization, Overhead & Profit (10%)
746,428
$
Contingency (10%)
746,428
$
TOTAL CONSTRUCTION BUDGET
8,957,142
$
OPM Services for Construction (Clerk of the Works)
assumes 60 week construction schedule @ 30 hrs / week
Resident LA / Engineer
1800
HRS
125
$
225,000
$
Subtotal
225,000
$
Design Services Amendment and Contingency
based on amendment request dated 1.11.16
Additional Design Services
1
LS
196,250
$
196,250
$
20% Design Contingency during construction
1
LS
39,250
$
39,250
$
Subtotal
235,500
$
OVERALL PROJECT OPINION OF PROBABLE COSTS
9,417,642
$
Weston Sampson
3/2/2016
Page 2
11-Jan-16
City of Somerville, Massachusetts
Lincoln Park Improvements
Overall Project Budget - Opinion of Probable Cost
Unit
Unit Cost
Ext Cost
Notes
SITE PREPARATION/ DEMOLITION
Temporary construction fence
1,200
LF
8
$
9,600
$
Assumes a two "work zone" approach.
Construction entrance traction pad
2
LS
5,000
$
10,000
$
Constrction trailer with electricity and internet
1
LS
20,000
$
20,000
$
assumes 60 weeks
Erosion control device - straw wattles
1,000
LF
5
$
5,000
$
Tree Removal and Pruning
1
LS
30,000
$
30,000
$
56 Trees and/or Large Shrubs
R&D Paving
7,670
SY
10
$
76,700
$
R&D Fence
2,000
LF
7
$
14,000
$
Strip & Dispose existing turf @ 2"d
875
CY
60
$
52,500
$
Strip & Stockpile loam @ 6"d
3,536
CY
8
$
28,288
$
R&D Existing Lighting
1
LS
25,000
$
25,000
$
R&D Existing Utilities and Structures
1
LS
20,000
$
20,000
$
Misc. Demolition
1
LS`
25,000
$
25,000
$
15% contingency
1
LS
47,413
$
47,413
$
Subtotal
363,501
$
EARTHWORK
Rough Grading
29,480
SY
1
$
29,480
$
Fine Grading
29,480
SY
2
$
58,960
$
15% contingency
1
LS
13,266
$
13,266
$
Subtotal
101,706
$
SUBSURFACE STORMWATER SYSTEM
Stormwater Chambers
3,160
EA
280
$
884,800
$
25 year event storage
Excavation
11,967
CY
15
$
179,505
$
Reuse on-site
Drain Stone
6,967
CY
35
$
243,845
$
12" Drain Pipe
1,000
LF
35
$
35,000
$
6" Perforated Underdrain Pipe
980
LF
25
$
24,500
$
At playground areas
Drain Inlets
20
EA
2,500
$
50,000
$
Drainage Structures
5
EA
6,000
$
30,000
$
Manholes
12" Collector Drains at Fields
1975
LF
35
$
69,125
$
2" Lateral Drains at Fields
10150
LF
9
$
91,350
$
15% contingency
1
LS
241,219
$
241,219
$
Subtotal
1,849,344
$
SITE IMPROVEMENTS
Cast-In-Place Walls (30" ht.)
260
CY
700
$
182,000
$
Deck Facade at Walls
935
SF
25
$
23,375
$
Granite Landscape Boulders (Natural)
300
TON
400
$
120,000
$
Assumed 50 blocks at 3' x 6' x 2'
Granite Landscape Blocks (Cut Stone)
115
TON
450
$
51,750
$
Seawall Stone or similar
Concrete Mow Curb
1400
LF
25
$
35,000
$
Concrete Paving
2,715
SY
75
$
203,625
$
Colored Concrete Paving
460
SY
95
$
43,700
$
Bituminous Concrete Paving - Vehicular
555
TON
160
$
88,800
$
4" full depth pavement located at schoolyard and fire lane.
Gravel Subbase
1,835
CY
35
$
64,225
$
8" depth assumed
Color Sealcoat
24,095
SF
1
$
24,095
$
Poured-In-Place Playground Surface
10,165
SF
16
$
162,640
$
Steel Edger
405
LF
15
$
6,075
$
Recycled Plastic Timber Edger
300
LF
9
$
2,700
$
Wood Mulch Fiber Surfacing
186
CY
50
$
9,300
$
Crushed Stone Under Mulch and Decks
130
CY
35
$
4,550
$
Granite Curbing
405
LF
35
$
14,175
$
Play Equipment
1
LS
785,000
$
785,000
$
Decking and Bridges
1,790
SF
45
$
80,550
$
Accessible Aggregate Surfacing
340
SY
30
$
10,200
$
Drinking Fountain
3
EA
5,000
$
15,000
$
Seating (Benches, Lounges, Hammocks)
1
LS
200,000
$
200,000
$
OLRA
1
LS
45,000
$
45,000
$
fencing, furshings, etc.
Misc. Furniture / Amenities
1
LS
75,000
$
75,000
$
Trash Receptacles, Bike Racks, Bollards etc.
15% contingency
1
LS
326,514
$
326,514
$
Subtotal
2,573,274
$
Weston Sampson
3/2/2016
Page 3
Unit
Unit Cost
Ext Cost
Notes
PLANTING
Tree Planting (4"-4.5" cal.)
150
EA
1,200
$
180,000
$
Shrub / Groundcover Planting
7,250
SF
28
$
203,000
$
Rootzone Mix
2,120
CY
36
$
76,320
$
Loam and Seed
17,670
SY
4
$
70,680
$
Loam and Sod
14220
SY
10
$
142,200
$
High Use Mix
Garden Planters
25
EA
1,500
$
37,500
$
Storage Shed
1
EA
8,000
$
8,000
$
for gardens
15% contingency
1
LS
107,655
$
107,655
$
Subtotal
825,355
$
FIELD AND COURT AMENITIES
Softball Field- Infield Mix
140
CY
60
$
8,400
$
Foul Poles
2
EA
3,000
$
6,000
$
Skate Amenities
1
LS
200,000
$
200,000
$
Soccer Goals
2
EA
5,500
$
11,000
$
Portable
Backstop
1
LS
25,000
$
25,000
$
BVCL Fencing - 8' Ht.
1040
LF
65
$
67,600
$
Ornamental Fencing- 4' Ht
360
LF
120
$
43,200
$
Basketball Goals
3
EA
5,500
$
16,500
$
Multi-Sport Goal
1
EA
10,000
$
10,000
$
Player Benches
6
EA
1,500
$
9,000
$
Splash Pad Equipment
1
LS
40,000
$
40,000
$
Turf Protection Fencing
1
LS
30,000
$
30,000
$
Storage Shed for DPW / Rec
1
LS
8,000
$
8,000
$
divided with two locking doors
Irrigation System
1
LS
100,000
$
100,000
$
All lawn and planting areas, softball field and soccer field
Backflow Preventer and Cabinet
1
LS
8,000
$
8,000
$
Water Service
1
LS
15,000
$
15,000
$
15% contingency
1
LS
89,655
$
89,655
$
Subtotal
687,355
$
ELECTRICAL
Sports Lighting
8
EA
60,000
$
480,000
$
Pedestrian Lighting
40
EA
10,000
$
400,000
$
Cabinet
1
EA
10,000
$
10,000
$
Upgrade Electrical Service
1
LS
35,000
$
35,000
$
15% contingency
1
LS
138,750
$
138,750
$
Subtotal
1,063,750
$
TOTAL CONSTRUCTION COSTS
SUBTOTAL
7,464,285
$
Mobilization, Overhead & Profit (10%)
746,428
$
Construction Contingency (10%)
746,428
$
TOTAL CONSTRUCTION
8,957,142
$
OPM Services for Construction (Clerk of the Works)
assumes 60 week construction schedule @ 30 hrs / week
Resident LA / Engineer
1800
HRS
125
$
225,000
$
Subtotal
225,000
$
Design Services Amendment and Contingency
based on amendment request dated 1.11.16
Additional Design Services
1
LS
196,250
$
196,250
$
20% Design Contingency during construction
1
LS
39,250
$
39,250
$
Subtotal
235,500
$
OVERALL PROJECT - OPINION OF PROBABLE COSTS
9,417,642
$