12.06.22 FIN Poplar GMP1-2 rev 1 2022Dec06 — File 22-2017
Poplar Street Pump Station
construction appropriation request
City Council Finance Committee
Mayor Katjana Ballantyne
Richard E. Raiche, Director of IAM
Demetrios Vidalis, Director of Water & Sewer
Stephen Haynes, W&S Finance Director
Ed Bean, Finance Director
6 December 2022
Outline
• Project goals
• Historical context
• Problems created
• Solutions offered
• Project details
• Infrastructure included
• Schedule
• Relation to ArtFarm
• Financing
• Rate impacts
2
Project goals
Poplar Street Pump Station enables flood mitigation in
Wards 2&3, supports CSO reduction, and unlocks
development potential in 60% of the City
3
Historical background
Poplar Street Pump Station solves a problem created in
1873
4
Millers River 1852
5
10
Poplar
Street
Somerville
Combined
Sewer &
Drain
Millers River 1873 - 1879
6
10
Poplar
Street
Somerville
Combined
Sewer &
Drain
Metropolitan
Sewer to
Boston
Harbor
Rail Road
Drainage to
Charles
Somerville &
Cambridge
Overflow to
Charles
96-inch brick arch sewer
7
Somerville combined sewer & drain
8
Combined sewer subsystems
9
A: Alewife
Western Ward 7
Clarendon Hill
S: Somerville Marginal
ASQ
Gilman Square
Winter Hill
Lower Broadway
C: Cambridge Branch
USQ, Boynton
InnerBelt, BrickBottom
Eastern DSQ
CA: Dry to C with Overflow to A
Western DSQ, Teele, Tufts
Ball/Magoun
Nexus of flows in low-lying, landlocked USQ
10
• Upstream flows create 3 problems
Problem 1: Flooding
System capacity limitations cause surcharges
11
Legacy flooding problems
12
Problem 2: Combined
Sewer Overflows
System capacity limitations cause discharge of sewage
to Alewife Brook, Mystic River and Charles River
13
CSO’s provide system relief
14
SOM-
007A
SOM-
001A
MWRA
Problem 3: Prohibitions on
development
MWRA and DEP require 4:1 stormwater offsets for new
sanitary connections
15
USQ, Boynton, DSQ, InnerBelt & other building
permits reliant on stormwater offsets
16
• 314 CMR 12: Requires 4 gallons of
stormwater be removed from sewers
for every 1 gallon of new sanitary flow
• For developers: MEPA permit requirements
for large developments (FRIT, US2, DLJ,
etc.)
• For Somerville: Annual reporting to MWRA
of new connections and I/I removed
• Must be by system
• Without stormwater discharge, impossible
to offset flows in Cambridge Branch system
MBTA drainage system
provides new capacity
A new solution to a 150-year old challenge
17
GLX MBTA drainage improvements
• Designed to keep
high-intensity flood
elevations below
top of rail
• Opportunity!
• Value in excess
capacity during
smaller storms
18
Railway unwilling 1873 - 2016
19
10
Poplar
Street
Rail Road
Drainage to
Charles
GLX in peril!
• Delays
• Cost increases
• $600M - $934M - $1.3B -
$2.3B - $4.3B!
• 2015 – 2017 redesign
Somerville helped save GLX
• Somerville
negotiated drainage
connection
Conditional export of stormwater
• 50 million gallons per day
maximum rate
• Zero discharge when
tracks flood
• Poplar Street Pump
Station design includes a
storage tank to
accommodate that
condition and maximize
benefit
22
Solution 1: Flooding
Solves the root cause downstream constraint and
facilitates all future flood mitigation projects
23
USQ projects in design and construction
24
Somerville Ave Utility &
Streetscape
Improvements (SAUSI)
Nunziato Stormwater
Storage
Poplar Street Pump
Station (Stormwater)
Spring Hill Sewer
Separation Union
Square Streetscape &
Plaza
Pump
Station
Site
Importance of Poplar Street Pump Station
and the new drainage connection
25
• Flooding in orange
areas dependent
upon new
connection
Citywide Drainage & Water Quality Master Plan
• Project summary
• Presentation materials
• Contact info
• Detailed technical reports
• Summary report
26
https://voice.somervillema.gov/citywide-drainage-and-water-quality-master-plan
27
Sewershed C2 - Existing Conditions Flooding
10-year, 24-hour
storm event
(total rainfall =
5.16 inches)
28
10-year, 24-hour
storm event
(total rainfall =
5.16 inches)
Sewershed C2 - Flooding After Project Implementation
Solution 2: Combined Sewer
Overflows
Relieves capacity limitations that cause discharge of
sewage to Alewife Brook, Mystic River and Charles
River
29
Long Term Control Plan
• Somerville, Cambridge & MWRA
developing plan
• DEP & EPA reviewing and
approving plan
• https://voice.somervillema.gov/cso-plan
• https://www.somervillema.gov/cso
• 2nd community meeting: Dec 15th
• https://tinyurl.com/CSOmeeting2
30
Solution 3: Offsets for new
development
MWRA and DEP require 4:1 stormwater offsets for new
sanitary connections
31
Hydraulic modeling results
• Diverts 2.2 Billion
gallons of stormwater
from MWRA system to
MBTA system in a
typical year
• 6 mgd average day
• Provides offsets for
development
scenarios
32
Infrastructure enables development - tax
base enables debt service & future budgets
Somerville
MWRA
MBTA
US2
MassDEP, EPA
Tax Revenue
Debt
Service
Transit-Oriented
Development
50 MGD
Capacity
Flow Reduction
Environmental
Compliance
Infrastructure
Transformation of USQ vital
component of SomerVision
A quick aside on the benefits of development
34
SomerVision & USQ Plan
35
Add public
open space
Increase
commercial
tax base
Create jobs in
Somerville
Increase
housing
stock for all
income levels
Create multi-
modal
transportation
network
Improve
stormwater &
wastewater
management
• Advance sustainable mobility goals
• Address legacy flooding issues
• Add new public open space
• Address housing crisis
• Create local jobs
• Reduce commutes out of and through
Somerville
• Expand commercial tax base to
fund community priorities and
create financial stability
Community-driven Development
36
Community
Visioning &
Planning
Community-
driven
Development
Structures and
Spaces
Housing,
Parks, Public
Spaces, Jobs
Streetscapes,
Mobility
structure
Tax Revenues
Community
Priorities
Community
Services
Outline
• Project goals
• Historical context
• Problems created
• Solutions offered
• Project details
• Infrastructure included
• Schedule
• Relation to ArtFarm
• Financing
• Rate impacts
37
Project details
38
Infrastructure at Poplar
Street
39
Objective: Move stormwater from MWRA to MBTA
40
Existing connection to MWRA Cambridge Branch Sewer
Proposed connection to MBTA track drainage system
41
Gravity connection to SAUSI culvert
42
Lift from MWRA to MBTA elevation ~17 feet
43
Force main connection to MBTA
44
Store stormwater when tracks flood
MBTA condition
for connection:
stop pumping
when tracks flood
45
Typical year and up to 10-year storm
Stormwater from sewer
separation areas exported
to MBTA track drainage
system
46
Extreme events
Overflow to MWRA Cambridge Branch Sewer
When MBTA tracks are
flooded, pumping stops,
and tank is full…
Schedule
Construction Manager recommendation for precast
concrete tank shortens schedule by 18 months and
reduces costs by $8M
47
48
O N D J
F
M A M J
J
A S
O N D J
F
M A M J
J
A S
O N D J
F
M A M J
J
A S
O N D
Sewer Enterprise, Current Funding Authorization Request
Stormwater Storage Tank
Start-up, punch list, and closeout
Stormwater Pump Station
Start-up, punch list, and closeout
Pipelines and Utilities
Start-up, punch list, and closeout
General Fund, Future Funding Authorization Request
Streetscapes
Start-up, punch list, and closeout
ArtFarm
Start-up, punch list, and closeout
On-site construction
2022
2023
2024
2025
Pre-construction
Pre-construction, fabrication
Pre-construction, fabrication
On-site construction
Pre-construction
On-site construction
Final design
Right-of-Way construction
Final design
Pre-con.
Right-of-Way construction
Schedule commentary – Precast tank
• Overall project critical path (illustrated in red):
• Tank excavation & concrete surface restoration, ArtFarm activation
• Schedule: Earliest start for ArtFarm construction winter 2024/25
• Plan: Initiate ArtFarm final design winter 2024/25
• Alignment of non-critical path components
• Pump station duration similar to tank, with long lead times for equipment
• Complete pipeline work early (eliminate unknowns, avoid escalation)
• Schedule: Earliest start for streetscape construction summer 2024
• Plan: Initiate streetscapes final design winter 2024/25
• Funding requests
• All sewer infrastructure – Fall 2022
• Streetscapes & ArtFarm – Winter 2023/24
49
Relation to ArtFarm
The final phase of the project
50
Infrastructure designed to accommodate
ArtFarm vision
• Finalize ArtFarm design and integrate infrastructure access
51
Outline
• Project goals
• Historical context
• Problems created
• Solutions offered
• Project details
• Infrastructure included
• Schedule
• Relation to ArtFarm
• Financing
• Rate impacts
52
Financing
Construction cost escalation and interest rate increases
necessitate changes to rate increase forecasts
presented for FY2023
53
Poplar Street financing strategy
• Total project cost: $102 Million
• Apply $10M from ARPA
• Accept up to $2.5M federal earmark
• Borrow remainder in tranches through bonding
• Current request:
• $89.333 Million bond authorization
54
Core financial model assumptions
• Utility Funds receive $2M annually in stabilization contributions
• MWRA cost will escalate at an average rate of 3-4% per annum
• Capital investment plan utilizes debt financing
•
Future project costs escalated to reflect market factors
•
Interest rates on future borrowing are higher than prior year analysis given
rising interest rate environment
•
Eligible future projects will leverage SRF program
• Assuming 100% spending of operating and capital expenses
55
Prior Model: No ARPA Funds
Sewer Fund Prior Modeling
Prior Model: No ARPA Funds
Sewer Fund Revised Modeling
Prior Model: No ARPA Funds
Water Fund Prior Modeling
Prior Model: No ARPA Funds
Water Fund Revised Modeling
Prior Model: No ARPA Funds
Kitchen Table Impact Preview *
Total Change in Annual Costs for Various Billing Units (including base & volumetric charges, amended)
Total Units per Bill (in CCF)
FY 2023
FY 2024
$ Change
Annual Total
Annual Total
(FY 2024 - FY 2023)
% Change
15 (average condo unit)
$919
$1,029
$110
12%
18 (average single family home)
$1,118
$1,258
$140
12%
30 (average two-family home)
$1,912
$2,170
$258
13%
42 (average three-family home)
$2,707
$3,080
$373
14%
110 (average 8-unit apartment
building)
$6,583
$8,409
$1,826
28%
*Note: Subject to change as team evaluates rate structure changes and FY24 budget
Assistance
Programs
• Low Income Housing Energy Assistance Program
• Administered by the City of Cambridge
• Federal Program to assist families up to 150% of the
Federal Poverty Limit
• 134+ Families have submitted for the assistance
Program
• 41C & 17D (Elderly) Exemptions
• Administered by the City of Somerville’s Assessing
Office
• 25% off Water & Sewer Bills for all those who qualify
• 64 of 17D applicants and 37 of 41C applicants (101
total) have qualified for FY22
• We are exploring additional options for targeted financial
assistance and expanding our community outreach teams
Conclusion
62
In 2016, we
started
developing
strategies to
be proactive
and achieve
infrastructure-
dependent
goals
63
64
Challenge: Construction cost escalation and
interest rate increases
65
Call to action:
Continue strategic
investment aligned
with financial
metrics that
preserves capacity
for other needs and
priorities
Poplar Street Pump Station
construction appropriation request