December 7, 2017
REPORT OF THE PUBLIC UTILITIES AND PUBLIC WORKS COMMITTEE
Attendee Name
Title
Status
Arrived
Robert J. McWatters
Chair
Present
Tony Lafuente
Vice Chair
Absent
Lance L. Davis
Ward Six Alderman
Present
Others present: Alderman Matt McLaughlin, Stanley Koty - DPW, Tim Snyder - Mayor’s Office,
Charles Sillari - Clerk of Committees.
The meeting took place in the Committee Room and was called to order at 6:00 PM by Chairman
McWatters and adjourned at 7:29 PM.
Chairman McWatters stated that aldermen may amend this report if they would like to keep any
item before the committee.
Approval of the October 24, 2017 Minutes
RESULT:
ACCEPTED
195521: That the Commissioner of Public Works and the Director of SPCD (ISD)
implement a plan to address trash and code violations each May and September, when
student moves have the greatest impact on the City.
RESULT:
WORK COMPLETED
195528: That this Board’s Committee on Public Utilities and Works explore Boston’s Code
Ordinance CBC 9-1.3, which requires private rental units to be registered on an annual
basis and inspections to be conducted for non-exempt units on a 5-year cycle.
RESULT:
WORK COMPLETED
196186: That the Commissioner of Public Works report to this Board whether it is possible
to have the Public Schools open when there is a declared snow emergency, and, if it is
possible, to also report the plan for teacher and staff parking, since school parking lots are
used then for resident parking.
Public Utilities and Public Works Committee
Page 2 of 17
Printed 12/12/2017
Alderman Davis said that he was expecting to see a written policy. He would like to know what
would happen if parking was not allowed in school yards. Members discussed the distinction
between school yards and school parking lots as well as the reasons for school closures during snow
events.
RESULT:
WORK COMPLETED
196302: That the Commissioner of Public Works report to this Board on the performance
of the contractor who maintains the street lights, the terms of the contract and deliverables,
and the process to ensure that street lights are maintained and operable.
RESULT:
WORK COMPLETED
196378: That the Director of SPCD and/or the Commissioner of Public Works notify
property owners along lower Broadway of the five year moratorium on renovations to
private sewer systems and encourage them to make appropriate plans.
RESULT:
WORK COMPLETED
196983: That the Administration dedicate certain public buildings for community use.
RESULT:
WORK COMPLETED
197238: That the City Engineer review drainage on Shore Drive, especially with storm
water runoff during heavy rains, particularly at the corner of Shore Drive and Putnam
Street, as well as the impact of development at Assembly Square on the sewer outflow line.
RESULT:
WORK COMPLETED
197277: That the Commissioner of Public Works notify the appropriate utility companies
to remove the double pole on Cambria Street.
RESULT:
WORK COMPLETED
197428: That the Commissioner of Public Works repair the depression in the roadway in
the east bound lane on Broadway just past its intersection with School Street.
RESULT:
WORK COMPLETED
197489: That the Commissioner of Public Works report to this Board about how utilities
inform residents about work on their streets, utility poles or power lines.
RESULT:
WORK COMPLETED
197625: That NStar Electric report to this Board on its preparations to insure sufficient
Public Utilities and Public Works Committee
Page 3 of 17
Printed 12/12/2017
power for the redevelopment of Union Square.
RESULT:
WORK COMPLETED
197724: That the Director of SPCD and the Commissioner of Public Works report to this
Board on the development, staffing and cost of a program to maintain street trees and keep
tree wells clean and weed-free, and/or a program to assist and inspire residents to do so.
RESULT:
WORK COMPLETED
197756: That the Administration report to this Board on its plan to implement the Tree
Advisory Committee that is required by Ordinance 12-100, the Tree Preservation
Ordinance.
RESULT:
WORK COMPLETED
198088: That the Commissioner of Public Works investigate and report back on installing
solar powered kiosks in our parks and playgrounds to communicate youth and family
activities in our city.
RESULT:
WORK COMPLETED
198386: That the Commissioner of Public Works update the Ward 5 Alderman on repairs
to prevent pedestrians from tripping in the crosswalks at Linden Avenue on the south side
of Summer Street, Aberdeen Road by Highland Avenue, and Hall Street by Cherry Street.
RESULT:
WORK COMPLETED
198444: That the Director of SPCD (ISD) report to this Board on the process for issuing
citations during snowstorms to private plowing and shoveling contractors who are plowing
snow into the street or onto neighbors' sidewalks.
RESULT:
WORK COMPLETED
199295: That the Director of SPCD discuss capitalizing on street repaving to bury utilities,
beautify the city, and reduce the threat of power outages due to rain/snow/ice storms.
RESULT:
WORK COMPLETED
199547: That the Commissioner of Public Works and the Director of SPCD work with
Eversource to remove the unsafe telephone poles secured to rotting trees on Woods Street
at North Street, and on Barton Street at Broadway.
RESULT:
WORK COMPLETED
199869: That the Administration inform the Clark Street neighbors about the TV pipe
Public Utilities and Public Works Committee
Page 4 of 17
Printed 12/12/2017
testing which should have been performed in 2014.
RESULT:
WORK COMPLETED
199955: That the Director of SPCD (Transportation) consider installing a bollard at the top
of the stairs at the Community Path Extension by Lowell Street, to prevent people from
accidentally tumbling down the stairs.
RESULT:
WORK COMPLETED
199956: That the Commissioner of Public Works determine if the lighting at the
Community Path Extension ramp and stairs by the Lowell Street bridge is sufficient, and if
not, install more.
RESULT:
WORK COMPLETED
200223: That the Commissioner of Public Works create clearly defined lines along Walnut
Street, by Pearl Street and Broadway, to eliminate two lane traffic problems.
Alderman Davis' motion to refer this item to the Traffic and Parking Committee was approved.
RESULT:
REFERRED FOR DISCUSSION
200440: That the Director of Constituent Services appear before this Board’s Committee
on Public Utilities and Works with a written report on streetlamp repairs citywide.
RESULT:
WORK COMPLETED
200637: That the Director of SPCD provide all Ward Aldermen with the 2016 street paving
plan for all Wards.
RESULT:
WORK COMPLETED
200645: That the Commissioner of Public Works explain to this Board how to find out
when a particular street is scheduled to be re-paved.
RESULT:
WORK COMPLETED
200680: That the Commissioner of Public Works appear before the Committee on Public
Utilities and Works to address the assistance the City can provide for a city tree root that is
growing into the basement of the home at 25 Meacham Street.
RESULT:
WORK COMPLETED
200773: That the Commissioner of Public Works describe to this Board, the rationale for
treating multi-unit residences the same as single family residences for purposes of volume-
Public Utilities and Public Works Committee
Page 5 of 17
Printed 12/12/2017
based escalation of water rates.
Alderman Davis spoke about separate meters for units in multi-family buildings and Mr. Snyder said
that he will look into the matter.
RESULT:
KEPT IN COMMITTEE
200874: That the Director of Capital Projects advise the Ward 7 Alderman of the start date
and schedule for sewer/relining on Powderhouse Blvd.
RESULT:
WORK COMPLETED
200882: That the Commissioner of Public Works and the Supervisor of Inspectional
Services report to this Board on the repair of the sidewalk that is collapsing on Vernon
Street, and what precautions are being taken for public safety.
RESULT:
WORK COMPLETED
201007: That the Commissioner of Public Works and the Director of SPCD consider
replacing the unused concrete bus shelter at Broadway and Cedar Street with a garden,
small park or sitting area, and report back by 5/12/16.
RESULT:
WORK COMPLETED
201010: That the Commissioner of Public Works replace the decorative lamppost that is
missing from the stump at Old Magoun’s Saloon in Magoun Square. (2nd request)
RESULT:
WORK COMPLETED
201012: That the Director of SPCD install pigeon spikes underneath the Lowell Street
bridge, above the Community Path Extension. (4th request)
RESULT:
WORK COMPLETED
201144: That the Commissioner of Public Works repair the disintegrating sidewalk at the
entrance to the parking lot on Central Street used by the Cambridge Health Alliance, or
require them to fix it if it is their responsibility.
RESULT:
WORK COMPLETED
201270: That the Commissioner of Public Works inform this Board of the options to adjust
new LED street lighting, and the process to request such adjustments.
RESULT:
WORK COMPLETED
201303: That the Director of Engineering and/or the Supervisor of Inspectional Services
Public Utilities and Public Works Committee
Page 6 of 17
Printed 12/12/2017
provide address numbers to the properties on Chestnut Street and notify the property
owners to display them on their buildings to facilitate identifying them.
RESULT:
WORK COMPLETED
201319: That the Commissioner of Public Works remove trash from the north side of the
Cambridge Health Alliance parking lot off Central Street and behind Junction Park, and
post NO DUMPING signs there.
RESULT:
WORK COMPLETED
201423: That the Commissioner of Public Works address the leaning utility pole at the East
Somerville Community School on Glen Street.
RESULT:
WORK COMPLETED
201473: That the Commissioner of Public Works and/or the City Solicitor report to this
Board on efforts to make the Albion Street sidewalk contractor repair the sidewalks or
refund the City, and that the Commissioner of Public Works have the sidewalks repaired
and report to this Board on when that will happen.
RESULT:
WORK COMPLETED
201499: That the Commissioner of Public Works clean the Community Path between
Cedar and Lowell Streets, and consider erecting a barrier to prevent erosion from the hill
alongside the path.
RESULT:
WORK COMPLETED
201504: That the Commissioner of Public Works consider installing an additional street
lamp near 27, 31 and 33 Winslow Avenue.
RESULT:
WORK COMPLETED
201586: That the Director of SPCD and the Commissioner of Public Works consider
creating shade at Grimmons Park and designing future parks with appropriate shade as
well.
RESULT:
WORK COMPLETED
201618: That the Director of Engineering explain to this Board how to find out when a
particular street is scheduled to be re-paved, or provide the city’s street paving list. (3rd
request)
RESULT:
WORK COMPLETED
Public Utilities and Public Works Committee
Page 7 of 17
Printed 12/12/2017
201712: That the Commissioner of Public Works repair the brick walkway between
Holland Street and College Avenue in Davis Square Plaza.
RESULT:
WORK COMPLETED
201713: That the Commissioner of Public Works inspect the damaged wall at 93 Pearson
Road and take action to remedy the situation.
RESULT:
WORK COMPLETED
201701: That the Commissioner of Public Works replace the 3 raised sidewalk panels at 61
Dartmouth Street. (2nd request)
RESULT:
WORK COMPLETED
201767: That the Superintendent of Inspectional Services direct Healey School staff to keep
the grounds clean and properly dispose of trash, due to increased rodent activity around
the school.
RESULT:
WORK COMPLETED
201771: That the Commissioner of Public Works remove all brush from the Mystic River
along Shore Drive.
RESULT:
WORK COMPLETED
201778: That the Commissioner of Public Works direct Eversource to immediately remove
the heavy plant overgrowth at the transfer station at Willow Avenue and Whipple Street.
RESULT:
WORK COMPLETED
201795: That the Commissioner of Public Works clean the Sacramento Street ramp that
runs beneath the railroad tracks and confirm the regular maintenance schedule previously
agreed to.
RESULT:
WORK COMPLETED
201797: That the Director of Engineering add Porter Street, between Summer and Elm
Streets, to the 5-year paving plan, and include the streets off the west side of Porter Street,
especially Carver Street.
RESULT:
WORK COMPLETED
201826: That the Commissioner of Public Works replace the black hot topped sidewalk at
985-987 Broadway with concrete and explain why Eversource claims they are not allowed
Public Utilities and Public Works Committee
Page 8 of 17
Printed 12/12/2017
to use concrete when replacing an opened sidewalk.
RESULT:
WORK COMPLETED
201906: That the Commissioner of Public Works direct the contractor who recently did
work on Porter Street to repair and resurface the sink hole that is beginning to develop on
Summer and Porter Streets.
RESULT:
WORK COMPLETED
202029: That the Director of SPCD, the Director of Capital Planning, and the City
Engineer create a timeline from September 2016 to September 2019 for streetscape
reconstruction projects in Ward 2 and post the timeline on the city’s website with continual
updates as changes occur.
RESULT:
WORK COMPLETED
202032: That the City Engineer and the Director of SPCD report back to the Ward 2
Alderman on repairing the sidewalk on the Dane Street bridge and the wooden slats on the
Webster Avenue/Newton Street Bridge, and on communications with the responsible State
agencies.
RESULT:
WORK COMPLETED
202034: That the Director of SPCD add Avon Street to the paving list.
RESULT:
WORK COMPLETED
202082: That the Commissioner of Public Works, the Superintendent of Inspectional
Services and the City Engineer report to this Board, the process for obtaining permission
for a curb cut, including provisions made to ensure that the city’s ordinances are followed.
RESULT:
WORK COMPLETED
202254: That the Commissioner of Public Works provide a disposition for the replacement
of a tree that was removed at 27 Dane Avenue, and explain why repeated requests for tree
replacements through 311 have not been answered.
RESULT:
WORK COMPLETED
202266: That the Commissioner of Public Works provide an explanation for recycled trash
being collected by non-recycling trash companies.
The new recycling trucks are packers.
Public Utilities and Public Works Committee
Page 9 of 17
Printed 12/12/2017
RESULT:
WORK COMPLETED
202305: That the Commissioner of Public Works remove the tree at 151 Pearl Street.
RESULT:
WORK COMPLETED
202307: That the Commissioner of Public Works take the actions described within
regarding the West Somerville Neighborhood School playground.
RESULT:
WORK COMPLETED
202330: That the City Engineer install the curb cut at the Warwick Street elbow, by the
Community Path Extension ramp, that was promised many years ago as part of the
Maxwell’s Green development.
RESULT:
KEPT IN COMMITTEE
202331: That the City Engineer install curb cuts and sidewalk ramps at the two curbs by
Maxwell’s Green at the intersection of Clyde and Warwick Streets.
RESULT:
KEPT IN COMMITTEE
202332: That the City Engineer repair the curb cut and sidewalk ramp at the intersection
of Murdock and Clyde Streets.
RESULT:
KEPT IN COMMITTEE
202333: That the City Engineer repair the concrete on the pedestrian and bicycle ramp
under the railroad bridge on Sacramento Street between Somerville Avenue and Miller
Street. (3rd request)
RESULT:
WORK COMPLETED
202334: That the Commissioner of Public Works address the ongoing graffiti on the
Sacramento Street underpass and use a product to cover graffiti more permanently, and
improve the lighting there as well.
RESULT:
WORK COMPLETED
202724: That the Superintendent of Schools look into how trash is kept at the Healy School,
to prevent rodent activity.
RESULT:
WORK COMPLETED
202727: That the Commissioner of Public Works work with the Mayor, Representative
Public Utilities and Public Works Committee
Page 10 of 17
Printed 12/12/2017
Provost and Senator Jehlen to get the appropriate state agency to clean state-owned trash-
filled land on the east and west sides of the Central Street Bridge.
RESULT:
WORK COMPLETED
202731: That the Administration consider providing a sprinkler and irrigation system for
Prospect Hill Park.
RESULT:
WORK COMPLETED
202765: That the City Engineer and the Commissioner of Public Works implement an
accessible pedestrian walkway on Poplar Street, surrounding ARTFARM, in anticipation
of its future development.
RESULT:
WORK COMPLETED
202773: That the Director of SPCD update this Board on the Beacon Street reconstruction
project with a timeline and significant design changes.
RESULT:
WORK COMPLETED
202774: That the Director of SPCD request information from MA DOT about the jersey
barriers and asphalt triangle at McGrath Highway, approaching the overpass, and request
that the space be converted to permeable green space if there are no further changes
planned for the intersection.
RESULT:
WORK COMPLETED
202784: That the Administration develop a policy for temporary crosswalk painting or
other measures to protect pedestrians when road work or other conditions prevent the
immediate re-striping of road markings.
Mr. Koty said that the program was funded through the Engineering Department. He explained the
timing process for putting down thermoplastic paint.
RESULT:
WORK COMPLETED
202873: That the Commissioner of Public Works replace the sidewalk panels on Highland
Avenue, from the Veteran's Honor Roll to Putnam Avenue.
RESULT:
WORK COMPLETED
202934: That the Director of SPCD consider placing Pitman Street on the 2017 street
resurfacing list.
Public Utilities and Public Works Committee
Page 11 of 17
Printed 12/12/2017
RESULT:
WORK COMPLETED
203270: That the Administration inform this Board of an action plan for the parking lot at
the Cummings School, as parked vehicles obstruct the basketball court.
RESULT:
WORK COMPLETED
203282: That the Commissioner of Public Works repair the Union Square businesses sign
behind the SCAT building and install a "Welcome to Union Square" sign there as well.
RESULT:
WORK COMPLETED
203361: That the Administration, the City Solicitor and the Superintendent of Water and
Sewer respond to a letter dated November 16, 2016 disputing St. James’s Episcopal
Church's water and sewer bills.
RESULT:
WORK COMPLETED
203370: That the Commissioner of Public Works replace the burnt out light bulbs in the
decorative street lights in Teele Square.
RESULT:
WORK COMPLETED
203450: That the City Engineer inspect the intersection of Ware Street and Russell Road,
and Russell Road from #s 7 to 35, for the potential of more sink holes.
RESULT:
WORK COMPLETED
203496: That the Director of Engineering determine why the repaving job on Pitman Street
between Belmont and Spring Streets is in its present condition, and why sink holes are now
causing issues on the street.
RESULT:
WORK COMPLETED
203507: That the Commissioner of Public Works provide shaded areas for public pools
including Foss Park and Dilboy.
Alderman McLaughlin would like some trees next season. Mr. Snyder explained that Foss Park is
out of the city's control, but perhaps something could be worked out at Dilboy Field, but the life
guard sight line is an issue, there. Alderman McLaughlin would like umbrellas.
RESULT:
KEPT IN COMMITTEE
203491: That the Administration facilitate the replacement of the wooden slats that provide
the pedestrian foundation on the Webster Avenue Bridge.
Public Utilities and Public Works Committee
Page 12 of 17
Printed 12/12/2017
RESULT:
WORK COMPLETED
203510: That the Director of Engineering install the four curb cuts near Maxwell’s Green
that the city has committed to installing, and notify the Ward 5 Alderman of the timeline
for their installation.
RESULT:
WORK COMPLETED
203514: That the Commissioner of Public Works remove the overgrowth from the rock
outcrop behind the field house at Powderhouse Park, extending to the pedestrian walkway.
RESULT:
WORK COMPLETED
203724: That the Director of SPCD consider placing a bump-out at the corner of Lowell
and Summer Streets.
RESULT:
WORK COMPLETED
203803: That the Director of SPCD coordinate with the Director of Traffic and Parking on
all parking restrictions related to park and other construction projects, to ensure ample
notice of parking restrictions to neighbors.
RESULT:
WORK COMPLETED
203797: That the Director of Water and Sewers repair the storm drain/catch basin that is
sinking below the street surface on the south side of Kidder Avenue, by the Brown School
near Willow Avenue.
RESULT:
WORK COMPLETED
203794: That the Director of Water and Sewers repair the depression around the sewer at
the corner of Porter and Summer Streets.
RESULT:
WORK COMPLETED
203862: That the Commissioner of Public Works and Arborist implement an inspection
and maintenance schedule to prevent the accumulation of trash, invasive plants, trees and
weeds along the entire Community Path.
RESULT:
WORK COMPLETED
203833: That the Commissioner of Public Works direct the appropriate utility to remove
the suspended double pole at 4 Howard Street.
Public Utilities and Public Works Committee
Page 13 of 17
Printed 12/12/2017
RESULT:
WORK COMPLETED
203835: That the Director of SPCD prioritize Cameron Avenue for repaving.
RESULT:
WORK COMPLETED
203867: That the Mayor’s Office, working with the Director of Engineering, report to this
Board on improving Eversource's communications with, and responsiveness to, this city's
residents, concerning gas meter replacement, street construction and utility work.
RESULT:
KEPT IN COMMITTEE
203872: That the Building Department not issue any demolition permits until a rodent
elimination program has been completed by the applicant, and provide an explanation to
this Board whenever a permit is issued without a completed program.
RESULT:
WORK COMPLETED
203873: That the Director of SPCD repave Otis Street.
Mr, Snyder will review the 5-year plan. He discussed the rates of road deterioration and private
ways.
RESULT:
WORK COMPLETED
203947: That the Director of Engineering inspect the 41 Elmwood Street area for continual
water and sewage flooding when severe rain storms occur.
RESULT:
WORK COMPLETED
203964: That all future Eversource requests be tabled by this Board until a signed
commitment for better communication by Eversource is enacted.
RESULT:
WORK COMPLETED
203970: That the Commissioner of Public Works inform this Board of the city's new
policies for utility companies to remove double poles and address low hanging wires.
RESULT:
WORK COMPLETED
203983: That the Mayor report to this Board by August 31, 2017 on ways to improve the
poor communications from Eversource to residents around gas meter replacement, street
construction, and other utility work. (2nd request)
RESULT:
WORK COMPLETED
Public Utilities and Public Works Committee
Page 14 of 17
Printed 12/12/2017
204219: That the Administration submit a funding proposal for a Priority Streets contract
to address sidewalk panels that need replacement.
RESULT:
WORK COMPLETED
204220: That the Water Director clean all of the catch basins on Somerville Avenue.
RESULT:
WORK COMPLETED
204240: That the Administration update this Board on a process to notify utilities in
advance when streets will be opened, so gas leaks can be addressed, including the date and
location of notifications that have been provided in the past year.
RESULT:
WORK COMPLETED
204263: That the Commissioner of Public Works request that the appropriate utility
company address the low hanging wires on Mt. Vernon and Washington Streets.
Mr. Koty stated that Eversource has been notified about the situation and will be notified again.
Chairman McWatters suggested having Mr. Zamparelli visit the site.
RESULT:
KEPT IN COMMITTEE
204354: That the Commissioner of Public Works replace the removed tree stump at 6
Barton Street with a tree.
RESULT:
WORK COMPLETED
204361: That MA DOT, Newport Construction and all other parties with knowledge of the
cutting down of trees on Beacon Street on October 6, without any public notice, appear
before this Board at its next regular meeting to respond to concerns about the surprise tree
removal.
RESULT:
WORK COMPLETED
204363: The Administration assign or hire city staff to oversee the daily operations of
contractor and utility company activity for the Beacon Street reconstruction project, and
adopt a policy of such oversight for every state funded street reconstruction project going
forward.
Mr. Snyder stated that new staff will be requested.
RESULT:
WORK COMPLETED
204365: That the Director of SPCD estimate for this Board the cost to move overhead wires
underground on Beacon Street from Washington to Hampshire Streets, identify potential
funding sources, and discuss the feasibility and impact of such an endeavor on the current
Public Utilities and Public Works Committee
Page 15 of 17
Printed 12/12/2017
Beacon Street project.
RESULT:
WORK COMPLETED
204362: That the Director of SPCD work with Mass DOT to cease all work on the Beacon
Street reconstruction project until a full report on the removal of trees from the street is
received and presented to this Board and until city staff is assigned day to day
responsibility for oversight.
RESULT:
WORK COMPLETED
204366: That the Director of Parks and Recreation instruct the contractor for the Lincoln
Park reconstruction to put up tarps or mesh shields to protect residents of Fremont and
Parker Streets from dirt blowing into their houses during construction.
RESULT:
WORK COMPLETED
204367: That the Director of Parks and Recreation report back to this Board whether
chain link fencing was represented in the original plans for Lincoln Park.
RESULT:
WORK COMPLETED
204368: That the Director of Parks and Recreation report back to this Board on whether
the intensity of the excavation at Lincoln Park was factored into construction plans, and
what steps will be taken to evaluate its impact on properties abutting the park.
RESULT:
WORK COMPLETED
204370: That the Director of Water and Sewer inform this Board whether it is protocol to
notify residents of excessive water usage on their property, the means by which that is
done, and the recourse residents have if they were not notified.
RESULT:
WORK COMPLETED
204371: That the Director of Water and Sewer explain to this Board any customer service
offered to residents who question their water bills.
RESULT:
WORK COMPLETED
204528: Requesting the Administration to compile contact information for all utilities, for
reporting such issues as low hanging wires and gas leaks, and make it easily accessible on
the city’s website.
Mr. Koty said that the Fire Department should be called. Alderman Davis would like the information
to be put in one place and to be indexed for logical searches.
Public Utilities and Public Works Committee
Page 16 of 17
Printed 12/12/2017
RESULT:
WORK COMPLETED
204546: That the Commissioner of Public Works post “NO DUMPING” signs, with the
amount of the fine, on the north edge of the Cambridge Health Alliance parking lot on
Central Street. (2nd request)
RESULT:
WORK COMPLETED
204549: That the City Engineer, the Commissioner of Public Works, and the Water
Director repair the pavement on Carver Street.
RESULT:
WORK COMPLETED
204551: That the Director of Capital Projects or the Director of Communications share
with this Board the plan for keeping community members informed on a regular basis
about the High School building project.
RESULT:
KEPT IN COMMITTEE
204552: That the Director of Capital Projects or the Director of SPCD update this Board
about the transportation management and parking plans for both the construction and the
post-construction phases of the new High School.
RESULT:
KEPT IN COMMITTEE
204446: City Engineer responding to #203947 re: recurring flooding on Elmwood Street.
RESULT:
WORK COMPLETED
204506: DPW Commissioner responding to various Board Orders submitted 10/12/17.
RESULT:
WORK COMPLETED
204583: Director of Water and Sewer responding to #204370 re: residential notifications
for excessive water use.
RESULT:
WORK COMPLETED
204584: Director of Water and Sewer responding to #204371 re: customer service for
questioned water bills.
RESULT:
WORK COMPLETED
204665: DPW Commissioner responding to various Board Orders submitted 11/9/17.
Public Utilities and Public Works Committee
Page 17 of 17
Printed 12/12/2017
RESULT:
WORK COMPLETED
Handouts:
•
DPW Responses