Matters ▸ Attachment
01.26.23 CC Specialized Energy Code — File 23-0084
somervillema.gov/ose
Specialized Energy
Code
Presentation to City Council
Mayor Katjana Ballantyne
Office of Sustainability & Environment
January 26, 2023
somervillema.gov/ose
Agenda
•
Summary of Somerville building energy decisions
•
Comparing Massachusetts energy codes
•
Existing building exemptions from updated Stretch
and new Specialized Energy Codes
•
Stretch Energy Code Update: Changes going into
effect July 1, regardless of Specialized Code adoption
•
What’s in the Specialized Energy Code?
•
Specialized Energy Code benefits
•
Sample of incentives and financing options
•
How will this work for Somerville?
somervillema.gov/ose
Summary of Somerville building
energy decisions
June 2011:
Adopted the
Stretch Energy
Code
December 2019:
Adopted updated
Zoning Ordinance
2022: Approved a
Home Rule Petition
to participate in the
Fossil Fuel Free
Building Pilot
Program
somervillema.gov/ose
Comparing Massachusetts Energy
Codes
Residential/Commercial
Proposed effective
date for Residential/
Commercial: July 1,
2023
Watertown, Brookline,
and Cambridge have
opted in
New construction,
additions, alteration
300 communities
somervillema.gov/ose
Existing building exemptions from the updated
Stretch Energy Code and new Specialized Energy
Code
•
Historic buildings with approval
•
Level 1 Alterations(removal/replacement/covering of existing
materials/equipment/elements/fixtures)
•
Level 2 Alterations (<=50% renovated/reconfigured)
•
Residential Additions <1,000 square feet (sf)
•
Commercial Additions <20,000 sf
somervillema.gov/ose
Stretch Energy Code Updates: Changes going into effect
July 1, regardless of Specialized Code adoption
somervillema.gov/ose
Stretch Energy Code Updates: Changes going into effect
July 1, regardless of Specialized Code adoption
•
Enhanced for energy efficiency standards
•
Electric Vehicle Supply Equipment requirements (1 space/home,
multifamily parking lots prewire 20% spaces)
•
Requires solar readiness 5+ stories
•
Requirements for new construction residential*
•
Requirements for new construction commercial*
•
Residential: Level 3 Alterations (50%+ renovated and reconfigured;
Additions 2x the size of the conditioned floor area or >1,000 sf
•
Commercial: Additions > 20,000 sf; Alterations (including walls)
•
Change of use/occupancy
*Exceptions: Specialized code has additional requirements for certain building types
somervillema.gov/ose
Comparing Massachusetts Energy
Codes
Residential/Commercial
Residential/
Commercial
Proposed effective
date: July 1, 2023
Watertown, Brookline,
and Cambridge have
opted in
New construction,
additions, alterations
300 communities
somervillema.gov/ose
What’s in the Specialized Energy
Code?
•
Builds on Stretch Energy Code with limited
exceptions
•
Applies to new construction for low-rise residential
and commercial
•
Choose 1 of 3 pathways to compliance:
1.
Zero Energy pathway
2.
All-Electric pathway
3.
Mixed-fuel pathway
•
New 1-2 unit homes >4,000
sf must use Zero Energy or All-
Electric pathways
•
Multifamily buildings <12,000
sf total conditioned floor area
may follow commercial or
residential code
•
Multifamily >12,000 sf follows
commercial code
somervillema.gov/ose
What’s in the Specialized Energy
Code?
•
Definition of net zero building
•
Definition of zero energy building
•
Enhanced for energy efficiency standards
•
All buildings required to equip 20% of spaces with wiring for
electric vehicle charging or one space per home in 1-2 unit home
•
Pre-wiring for electrification required in Mixed-Fuel pathway
•
Solar PV required for Mixed-Fuel pathway
•
High ventilation buildings (labs):
•
Must install wiring sufficient for all-electric
•
Have a path to meet All-Electric requirements
somervillema.gov/ose
Specialized Energy Code benefits
Support citywide goals and planning towards net zero, all-electric buildings by
2050.
•
A necessary and important step to reduce greenhouse gas emissions from
the #1 emissions-producing sector in Somerville.
•
Adopt now and impact new construction through 2050.
•
More rigorous than current local standards.
•
Will put Somerville in a better position to electrify by
•
disincentivizing the installation of new fossil-fueled systems,
•
facilitating installation of electrification infrastructure, and
•
encouraging all-electric builds and projects.
•
Support construction of cleaner, more energy efficient, resilient buildings.
•
Important step towards Fossil Fuel Free Pilot Program.
•
May create access to more funding opportunities.
somervillema.gov/ose
Sample of incentives and
financing resources
•
Alternative Energy Credits
•
Business tax credits
•
Energy efficiency tax
credits/rebates
•
Eversource electric vehicle
supply equipment incentives
•
Federal Inflation Reduction Act
45L and 179D tax credits
•
Fuel Assistance
•
Housing Rehab Program
•
Heating System Replacement
Program
•
Mass Housing Loans
•
Mass Save
•
Massachusetts Clean Energy
Center
•
SMART program
•
Solar tax credits
•
And more…
somervillema.gov/ose
How will this work for Somerville?
•
Cross-departmental effort
•
Managing consultant services
•
Evaluate development trends, policy and staff impact
•
Analysis will help determine how to effectively implement and
streamline the program
•
Creation of easy-to-use public outreach tools
•
Promote financial assistance tools
•
Outreach planned Spring/Summer 2023 and beyond
somervillema.gov/ose
Thank you
Christine Blais
Director
Mayor’s Office of Sustainability and Environment
City of Somerville
[phone removed]
cblais@somervillema.gov
somervillema.gov/ose
Discussion
Christine Blais
Director
Mayor’s Office of Sustainability and Environment
City of Somerville
[phone removed]
cblais@somervillema.gov