Matters ▸ Attachment
Committee Report - T&P - 4-19-18 — File 205720
Traffic and Parking Committee
Page 1 of 9
Printed 4/25/2018
April 19, 2018
REPORT OF THE TRAFFIC AND PARKING COMMITTEE
Attendee Name
Title
Status
Arrived
Mark Niedergang
Chair
Present
Ben Ewen-Campen
Vice Chair
Present
Wilfred N. Mbah
Alderman at Large
Present
Others present: Brad Rawson - OSPCD, Mike Tremblay - OSPCD, Adam Polinski - OSPCD,
Suzanne Rinfret - T&P, Terry Smith - T&P, Sgt. John Gobiel - SPD, Charles Sillari - Clerk of
Committees.
The meeting took place in the Committee Room and was called to order at 6:30 PM by Chairman
Niedergang and adjourned at 8:21 PM.
Approval of the April 2, 2018 Minutes
RESULT:
ACCEPTED
Approval of the November 30, 2017 Minutes
RESULT:
ACCEPTED
203945: That the City Solicitor appear before the Committee on Traffic and Parking to
describe how the Traffic Commission agenda is prepared, and whether this Board can
place items on that agenda.
Ms. Rinfret explained to the committee how items get placed on the Traffic Commission agenda
and how notification gets sent out and said that she is always available by telephone or email if
an Alderman has an issue. Chairman Niedergang stated that it would be helpful if there was a
contact person in the administration to deal with items that Aldermen want placed on the Traffic
Commission agenda, and Ms. Rinfret responded that she can be the contact person for Aldermen
to discuss agenda items for the Traffic Commission.
RESULT:
WORK COMPLETED
205092: That the Traffic Commission consider creating a process for residents to comment
Traffic and Parking Committee
Page 2 of 9
Printed 4/25/2018
on parking changes that affect their streets.
RESULT:
KEPT IN COMMITTEE
204127: That the Traffic Commission create a requirement to notify abutters of pending
agenda items which may impact their streets.
Ms. Rinfret said an agenda is advertised 48 hours in advance of a meeting and that there are also
public notices published in the newspaper. Chairman Niedergang would like to see someone on
the city staff notify abutters of an item that impacts their neighborhood. He doesn’t feel the
newspaper is a reasonable way to notify people and would rather see flyers distributed in the
neighborhood. Ald. Ewen-Campen suggested developing a policy that would trigger the
notification of neighbors based on the size of the project and the impact to the neighborhood.
Ms. Conner will report back with possible solutions.
RESULT:
KEPT IN COMMITTEE
200994: That the Traffic Commission consider amending Article 14 to provide a separate
and simplified means for requesting speed bumps where needed.
Chairman Niedergang stated that there are only two speed bumps in the entire City of Somerville
while many cities, ranging from Boston, to Ankorage to Austin, use speed bumps a primary tool
for traffic calming. Mr. Rawson discussed data collection and told the committee that his
department will start conversations about speed bumps with the appropriate departments. There
are budgetary restraints and maintenance issues that have to be considered, as well as the effects
to the neighborhoods. Chairman Niedergang would like to see a small pilot program to test
speed bumps.
RESULT:
WORK COMPLETED
202787: That the Traffic Commission consider amending Article 14 of the City Traffic
Regulations to provide a simplified means for residents and Aldermen to request, and for
the Commission to approve, the placement of speed bumps on residential streets.
RESULT:
WORK COMPLETED
202103: That the Traffic Commission consider increasing the fine for blocking a driveway
from $30 to $100.
RESULT:
WORK COMPLETED
204874: That the Director of Traffic and Parking publish de-identified parking permit data
in the city’s open data portal so as to permit community analysis and discussion of issues
related to the supply and demand of parking.
RESULT:
KEPT IN COMMITTEE
Traffic and Parking Committee
Page 3 of 9
Printed 4/25/2018
202984: That the Director of Traffic and Parking report the number of guest passes and
resident parking stickers issued for FY15, FY16 and FY17 to date.
RESULT:
KEPT IN COMMITTEE
204169: That the Commissioner of Public Works re-evaluate the rush hour traffic light
timing at Magoun Square, and whether the Broadway green light for Medford Street is too
short, backing up traffic on Medford Street through the Square.
Mr. Smith said that a good study had been done five or six years ago, but given changes in the
area, he recommended that a consultant be hired to perform a comprehensive review and that the
cost should be paid by a developer. Chairman Niedergang would like to get a study done quickly
and said that the developer of the 55-unit complex to go in at 519 Broadway/87 Medford Street
on the Somerville/Medofrd line pledged to contribute $32,500 towards traffic studies once he
receives his building permit. Chairman Niedergang would like the city to front the cost and be
reimbursed at a later date by the developer. The committee discussed the possible impacts of the
Green Line Extension in Magoun Square.
RESULT:
WORK COMPLETED
204735: That the Director of Traffic and Parking paint the intersection of Broadway at
Hinckley Street with a “Don’t block the box” symbol so motorists on Broadway don't
prevent cars from exiting Hinckley Street.
RESULT:
WORK COMPLETED
204734: That the Chief of Police conduct traffic enforcement during the afternoon rush
hour at the intersection of Hinckley Street and Broadway so motorists on Broadway don't
prevent cars from exiting Hinckley Street.
RESULT:
WORK COMPLETED
200263: That the Director of Traffic and Parking consider the attached suggestions from
Ward 5 residents to improve traffic flow during rush hours in Magoun Square and report
back to this Board.
RESULT:
WORK COMPLETED
203274: That the Director of Traffic and Parking consider placing a raised crosswalk at the
intersection of Summer and Lowell Streets.
Alderman Ewen-Campen would like traffic calming measures in Ward 3 and asked how the
process works so that an alderman can get traffic calming measures implemented. Mr. Smith
discussed the history and the petition process that resulted in a raised crosswalk being installed at
the corner of Elm Street and Willow Avenue. The committee discussed the lack of funding
which is a challenge to getting traffic calming projects accomplished. Mr. Rawson said his
department intends to bring an implementation budget request to the BOA during the budget
Traffic and Parking Committee
Page 4 of 9
Printed 4/25/2018
process in June. There are many ways to accomplish the traffic calming goals, e.g., roadway
painting, signs, raised crosswalks and sidewalk bumpouts. Alderman Ewen-Campen asked if the
city knows which locations are getting fixed first and if there is a process to determine the order
in which the work is done. Mr. Rawson discussed the ways in which the city looks at return on
investment when it comes to the projects and locations and the order in which the work is started.
The committee also discussed analyzing crash data to assist in prioritizing problem areas.
RESULT:
KEPT IN COMMITTEE
205448: That the Director of SPCD provide recommendations on making the intersection
of Summer and Central Streets safer for pedestrians, bicyclists and drivers.
RESULT:
KEPT IN COMMITTEE
205449: That the Director of SPCD provide traffic calming recommendations for School
Street, from Highland Avenue to Summer Street.
RESULT:
KEPT IN COMMITTEE
205450: That the Director of SPCD provide traffic calming recommendations for Vinal
Avenue.
RESULT:
KEPT IN COMMITTEE
201006: That the Director of Engineering, the Director of Capital Projects and the Director
of SPCD report to this Board by 5/12/16 on adding a crosswalk on Cedar Street at Albion
Street and Lexington Avenue.
RESULT:
WORK COMPLETED
204883: That the Director of Traffic and Parking add a second crosswalk on Summer
Street at Hancock Street and on Lexington Avenue at Hancock Street.
Mr. Smith explained that the locations are not ADA compliant and therefore cannot have
crosswalks installed. Mr. Rawson discussed the possible costs involved in creating an ADA ramp
including engineering and construction, but said it depends upon how much grading work needs
to be done. Chairman Niedergang stated this item is not high priority and does not want to take
funds away from another location that may need it more.
RESULT:
WORK COMPLETED
202104: That the Director of Traffic and Parking and the Director of Engineering report to
this Board on the timeframe for re-striping crosswalks that are erased due to repaving or
construction.
Traffic and Parking Committee
Page 5 of 9
Printed 4/25/2018
RESULT:
KEPT IN COMMITTEE
202105: That the Administration develop a process for interim crosswalk painting and/or
other measures to protect pedestrians when road work or other conditions prevent the
immediate re-striping of road markings.
RESULT:
KEPT IN COMMITTEE
200266: That the Commissioner of Public Works repaint the faded NO CYCLING markers
on sidewalks and install NO BIKE RIDING – PLEASE WALK YOUR BIKE signs in
central business districts.
Ms. Rinfret said the signs are repainted every year.
RESULT:
WORK COMPLETED
202099: That the Director of Traffic and Parking install signage at all traffic light
intersections for enforcement of bicycling regulations.
Mr. Rawson explained that bicycle riders are expected to follow the rules of the road and the city
works to educate people on that. The committee acknowledged that there are other states where
different rules may apply to bicycles at STOP signs and YIELD signs and discussed exploring
new techniques that are being used in other municipalities. Chairman Niedergang feels that this
requires serious further discussion.
RESULT:
WORK COMPLETED
202110: That the Director of Traffic and Parking repaint the NO SIDEWALK CYCLING
decals on the sidewalks in the business districts and post larger signage in both English and
Spanish.
Ms. Rinfret explained that there is already quite a bit of signage on the streets so there could be
an issue of sign pollution if signs were put up on poles in business districts. She said that the
City repaints all the decals on sidewalks and on ADA ramps in every business district every
spring. Among the suggestions made during the discussion of this item were, having a police
officer present at certain times in lieu of signs, refreshing the signs with paint more regularly
than once a year, stenciling signs on the pavement in multiple languages and sending a flyer to
all homes with the rules where people can ride bicycles. Mr. Rawson said that riding on
sidewalks is a sign that the streets are not bicycle friendly and more protected bike lanes are
needed as they encourage more people to ride bicycles.
RESULT:
WORK COMPLETED
204252: That the Chief of Police assign officers to conduct traffic enforcement of bicyclists
during the morning rush hour at the Cedar Street Community Path crossing, and include
the Bicycle Advisory Committee in any discussions.
Traffic and Parking Committee
Page 6 of 9
Printed 4/25/2018
Sgt. Gobiel discussed the ways that community police officers are dealing with this issue and
said that more officers would be needed for more enforcement to be done. He said that the
Traffic Dept. in SPD is down three people, and that there is also a shortage of other officers with
10 new officers in training in the Police Academy for the next five months. There are simply not
enough officers to do additional enforcement on bicyclists. This particular intersection is busy
and there are some challenges that will be discussed with the Police Chief. The committee
discussed data that has been collected by the city at that location and what it might indicate in
terms of changes to that intersection.
RESULT:
WORK COMPLETED
204253: That the Director of SPCD consider adding some sort of signal or barrier to cause
bicyclists to slow or stop at the Community Path intersections with Cedar Street and
Willow Avenue, and include the Bicycle Advisory Committee in any discussions.
The committee discussed various ways to accomplish the goal of this item including paint strips
that are raised so bicyclists will feel it on the road. The committee agreed that this would be a
good first step and perhaps a good solution to the problem at these locations and urged Mr.
Rawson to implement this as soon as possible. The speed of bicycles will be monitored to
determine what is working.
RESULT:
WORK COMPLETED
204254: That the Chief of Police increase traffic enforcement of bicyclists in the fall and
mid- to late-spring, when bicycle traffic is at its peak.
See discussion in 204252 above. The committee discussed how the city is analyzing data so that
it can be used as part of a strategy and also discussed a new system of electronic citations and
crash reporting that the city will start using soon. The committee discussed how the city collects
crash data and uses that to update hot spots and heat maps on a monthly basis. Sgt. Gobiel
explained to the committee how the city determines where police officers will be assigned to do
traffic enforcement using this data.
RESULT:
WORK COMPLETED
200017: Traffic and Parking Director submitting responses to various Board Orders
submitted 8/27/15.
RESULT:
WORK COMPLETED
200088: Traffic and Parking Director submitting responses to various Board Orders
submitted 9/24/15.
RESULT:
WORK COMPLETED
200354: DPW Commissioner responding to various Board Orders submitted 10/22/15.
Traffic and Parking Committee
Page 7 of 9
Printed 4/25/2018
RESULT:
WORK COMPLETED
202825: Director of Traffic and Parking responding to items approved at the 1/26/17
meeting.
RESULT:
WORK COMPLETED
202961: Traffic and Parking Director responding to items approved 2/23/17.
RESULT:
WORK COMPLETED
202962: Traffic and Parking Director responding to items approved 2/14/17.
RESULT:
WORK COMPLETED
203106: Director of Traffic and Parking responding to Board Orders approved at the
3/23/17 meeting.
RESULT:
WORK COMPLETED
203107: Director of Traffic and Parking responding to Board Orders approved at the
3/9/17 meeting.
RESULT:
WORK COMPLETED
203628: Director of Traffic and Parking responding to items approved at the 04/27/17
meeting.
RESULT:
WORK COMPLETED
203629: Director of Traffic and Parking responding to items approved at the 05/11/17
meeting.
RESULT:
WORK COMPLETED
204333: Director of Traffic and Parking responding to Board Orders approved at the
7/13/17 meeting.
RESULT:
WORK COMPLETED
204334: Director of Traffic and Parking responding to Board Orders approved at the
8/24/17 meeting.
RESULT:
WORK COMPLETED
Traffic and Parking Committee
Page 8 of 9
Printed 4/25/2018
199958: That the Director of Traffic and Parking place a DEAD END sign at the
intersection of Roberts and Hinckley Streets.
RESULT:
WORK COMPLETED
200250: That the Director of Traffic and Parking install a crosswalk at Central and Forster
Streets.
RESULT:
WORK COMPLETED
200262: That the Director of Traffic and Parking report to this Board on whether the use
of mirrors to provide improved sight lines for exiting driveways or narrow streets has been
considered here.
RESULT:
WORK COMPLETED
201148: That the Director of Traffic and Parking replace the unreadable PRIVATE WAY
and TOW ZONE signs at Olive Avenue and Linden Avenue, and repair the NOT A
THROUGH STREET sign at 10 Olive Avenue.
RESULT:
WORK COMPLETED
200524: That the Director of Traffic and Parking install “Slow–Children Crossing” or
“Caution–Children at Play” signage to slow traffic at the intersection of Central and
Forster Streets.
RESULT:
WORK COMPLETED
204733: That the Director of Traffic and Parking post a NO U-TURN sign on Porter Street
at Highland Avenue.
RESULT:
WORK COMPLETED
200525: That the Commissioner of Public Works direct MA DOT to repair the sidewalks
on the Central Street bridge near Hoyt-Sullivan Park, and report to this Board on
progress.
RESULT:
WORK COMPLETED
200774: That the Director of Traffic and Parking consider installing designated metered
motorcyle/moped parking spots near Davis Square.
RESULT:
WORK COMPLETED
201798: That the Director of Traffic and Parking install a SLOW – CHILDREN
CROSSING or CAUTION – CHILDREN AT PLAY sign on Central Street south of
Traffic and Parking Committee
Page 9 of 9
Printed 4/25/2018
Forster Street, on the east side of the street. (2nd request)
RESULT:
WORK COMPLETED
204336: That the Traffic Commission discuss, at its October meeting, revising the rules for
the renewal of residential parking permits and consider fee proration for periods less than
a full year.
RESULT:
WORK COMPLETED
204450: Ben Morelli submitting comments re: #204336, prorating residential parking
permits.
RESULT:
WORK COMPLETED
202926: That the Director of Traffic and Parking erect signs at the city borders
encouraging motorists to drive safely and informing them of the 25 mph speed limit and 20
mph safety zones.
RESULT:
WORK COMPLETED
203073: That the Director of Traffic and Parking discuss with the Ward 5 Alderman, the
request for four no parking spots at the intersection of Murdock and Cedar Streets.
RESULT:
WORK COMPLETED
203511: That the Director of Traffic and Parking report to the Ward 5 Alderman on the
Murdock Street neighbors’ request for four no parking spots on Murdock Street at Cedar
Street.
RESULT:
WORK COMPLETED
203509: That the Director of Traffic and Parking replace the missing Pedestrian Impact
Recovery System in the crosswalk at Morrison Avenue and Highland Road.
RESULT:
WORK COMPLETED