Matters ▸ Attachment
Public Safety Building Memo FINAL — File 206005
CITY OF SOMERVILLE, MASSACHUSETTS
JOSEPH A. CURTATONE
MAYOR
CITY HALL ● 93 HIGHLAND AVENUE ● SOMERVILLE, MASSACHUSETTS 02143
[phone removed], EXT. 2100 ● TTY: [phone removed]● FAX: (617) 625- 3434● www.somervillema.gov
E-MAIL: mayor@somervillema.gov
To:
Board of Alderman
Re:
Future Public Safety Building
Date: May 22, 2018
This memo explains the Administration’s rationale for building a new public safety building, the process
we used to select a location for the building, the potential building program, and how the new facility
fits into the City’s capital and long-range financial planning.
The need for a new public safety building
The Somerville Police Department (SPD) adopted 220 Washington St. in Union Square as its
headquarters in 1985. Engine 3 and other Somerville Fire Department (SFD) staff and apparatus moved
into the building at the same time.
The current facility does not adequately serve the needs of the SPD and the SFD. The building was never
designed to function as a police headquarters or to house a fire department company, having served as
a car barn for the MBTA prior to 1985. The building has also experienced several serious floods, one of
which led to the relocation of Engine 3 staff out of the building into temporary trailers and later modular
units on site.
Recognizing that a longer-term solution is needed to appropriately serve our public safety departments
and our residents, the City began planning for the relocation of public safety into a new facility in 2016.
The Capital Projects and Planning Department (CPPD) hired a consulting team (Weston & Sampson) to
conduct a space needs assessment to compile quantitative and qualitative data about the existing
facility and to understand administrative and operational goals and how those goals relate to spatial
requirements. Based on this information, a space needs summary was developed indicating specific
interior and exterior requirements. Individual sketches of key administrative, operational, and support
spaces were developed including specific layout information for required furniture and equipment as
well as technology, communications, audio/visual, lighting, HVAC, finishes, and privacy requirements.
This information provides critical detail in identifying the program for a new SPD headquarters. Similar
2
information for Engine 3 of the SFD was collected during the process of designing and constructing the
company’s new modular units in 2015-2016.
Selecting a location for a new public safety building
The space needs assessment indicates that a new SPD headquarters will require at least 77,000 square
feet of space and a floorplate of at least 30,000 square feet. To identify potential locations that could
accommodate this program, CPPD and the Planning and Zoning Division identified all parcels in
Somerville that are at least 30,000 square feet.1 They then selected from this list the most underutilized
parcels. Weston & Sampson evaluated each of the resulting six sites against a uniform set of criteria to
determine the best location for the new public safety building. These criteria include, but are not limited
to, site access, whether the site can accommodate Engine 3 (in terms of size and location), estimated
response times for Engine 3, the size of the site and the extent to which its shape accommodates public
safety uses, environmental factors, and the estimated cost of development.
This site scoring matrix identified 90 Washington St., the current site of the vacant Cobble Hill shopping
center, as the preferred location for a new SPD headquarters and Engine 3. In keeping with the
recommendations from the 2016 Carlson Group Fire Study, the proposed new site for Engine 3 is to the
east of Union Square, which will allow it to serve East Somerville, Union Square, and anticipated new
development in Brickbottom, Boynton Yards, and Inner Belt. The median estimated response time for
critical calls from this location is 3.98 minutes, well below the National Fire Protection Association
(NFPA) standard of 5 minutes, and Engine 3 will be able to respond to an estimated 92% of critical calls
within 5 minutes. Additional key benefits of the site include its size (3.98 acres) and access and the fact
that there are no existing tenants on the site.
Program for a new public safety building at 90 Washington St.
At a minimum, the new facility at 90 Washington St. will house the SPD headquarters (including the e-
911 call center) and Engine 3. As part of the design process, the City will investigate locating other uses
at the building. For example, the City could consolidate all of our dispatch and call service operations in
one location, which would include Fire Alarm and Constituent Services in addition to e-911. The City will
also consider relocating Traffic & Parking to the new facility. These decisions will be made during the
design process, and the rationale for these potential relocations will be discussed with the Board of
Aldermen when we report on the recommendations from the Building Master Planning Committee in
the fall. We will also examine whether the site can accommodate the spare fire apparatus and other fire
uses currently located in Union Square.
In keeping with Somerville’s goal to be carbon neutral by 2050, the City is proposing to build a net-zero-
ready facility, which means, at a minimum, that the building will be ultra-efficient and only use
electricity as its energy source.
1 While the City’s preference is to locate the new SPD headquarters and Engine 3 on the same site, it did not
restrict its search to sites located in the Engine 3 response area.
3
Financial implications of a new public safety building
The City is requesting an authorization to borrow and appropriate $8.745 million to acquire the 90
Washington St. site based on the appraisal ordered by the City and conducted by Mark Reenstierna of T.
H. Reenstierna, LLC, which the City received on March 21, 2018. The City has included this amount in its
revised Capital Investment Plan (CIP) project list in the critical category.2 The construction of the new
public safety building has been included as a critical project since November 2016. The associated debt
service of these two expenses has been factored into the City’s long-range financial model for the
General Fund, and the City is exploring using the proceeds from the anticipated sale of D1 (where the
police headquarters is currently located) to net down this debt service. We are available to brief the
BOA on our projected long-term financial health at their convenience.
Items before the Board of Aldermen
We are submitting three requests to the Board of Aldermen:
1. An order of taking for the acquisition of 90 Washington St.
2. Borrowing authorization and appropriation request for the acquisition of 90 Washington St.
3. Borrowing authorization and appropriation request for owner’s project manager (OPM) and
contractual project management services for the construction of a new public safety building.
Massachusetts procurement law requires municipalities to hire an OPM for building projects
estimated to cost $1.5 million or more.
2 Critical projects are defined as those required to fulfill SomerVision and the USQ Neighborhood Plan. The current
public safety building must be relocated to allow the development on D1 called for in the USQ Neighborhood Plan.