FINAL FY18 CPA Annual Report — File 206100
City of Somerville
Community Preservation Act
FY18 Annual Report
2
Table of Contents
IntroducƟon
3
CPA Background
3
The Community PreservaƟon CommiƩee
3
The Community PreservaƟon Plan
3
FY18 Funding
4
FY18 Funding Requests
7
FY18 ApplicaƟon Process– Historic
Resources and Open Space/RecreaƟon
9
FY18 Affordable Housing Funding
9
Ongoing Project Update
10
CPA Results
26
Program Improvements
26
Looking Ahead to FY19
27
Unless otherwise noted, all images are provided by Somerville CPA grantees.
Cover photo credits:
MysƟc Water Works Building: Magicpiano ‐ Own work, GFDL, hƩps://commons.wikimedia.org/w/index.php?curid=8947932
3
Introduction
Since the first Community PreservaƟon Act (CPA) fund‐
ing round in FY15, more than $21.4 million has been
awarded to 55 affordable housing, historic preservaƟon,
and open space and recreaƟon land projects. 2017
marked the fiŌh anniversary of Somerville’s adopƟon of
the Community PreservaƟon Act. The Community
PreservaƟon CommiƩee (CPC) celebrated with the city
through a walking tour of CPA sites and a party at Pro‐
spect Hill Park.
Two other milestones for CPA in Somerville were the
acquisiƟon of the first open space/recreaƟonal land
parcel– the 0.04 acre 5 Palmer parcel, which will add to
the Capuano Schoolyard/Glen Park– and the approval of
a $6 million bond for the 100 Homes project by the
Board of Aldermen.
Of the 55 projects being implemented, 53% are commu‐
nity led and 11% are joint projects between a commu‐
nity organizaƟon and the City of Somerville.
The CPC organized the first state‐wide forum for CPA
ciƟes, bringing together 37 CPC members and their staff
from 15 communiƟes. This effort led to the Community
PreservaƟon CoaliƟon commiƫng to hold its first CPA
conference since 2012 and including a track for CPA
ciƟes, in recogniƟon of the unique challenges ciƟes face
in implemenƟng the Community PreservaƟon Act.
CPA Background
With the adopƟon of the Community PreservaƟon Act
in November 2012, the City of Somerville joined now
172 other communiƟes in the Commonwealth of Mas‐
sachuseƩs that have a steady funding source dedicated
to preserving and improving their character and quality
of life. The CPA is a MassachuseƩs state law (M.G.L. c.
44B) that enables adopƟng communiƟes to create a
dedicated fund for preserving open space and historic
resources and expanding community housing and out‐
door recreaƟon opportuniƟes.1 Somerville voters
passed the Act by 76%, the second highest passage rate
in CPA history.2 This achievement made is possible for
Somerville to have addiƟonal resources to make Somer‐
ville an even more excepƟonal place to live, work, play,
and raise a family.
The Community Preservation Committee
The Community PreservaƟon CommiƩee (CPC) oversees
the implementaƟon of the CPA in Somerville. The Com‐
miƩee, formed in January 2014, is responsible for es‐
tablishing prioriƟes for how CPA funding should be
spent and, based on those prioriƟes, making recom‐
mendaƟons to the Board of Aldermen (BOA) on projects
to receive funds. As established in Somerville’s Commu‐
nity PreservaƟon CommiƩee Ordinance, the CPC has
nine members, including five ex‐officio members and
four members of the general public, who may serve two
consecuƟve three‐year terms. This year general public
member Ezra Glenn and Arn Franzen stepped down
from the CPC when they reached their term limits. Mr.
Glenn was replaced by Jane Carbone through a com‐
peƟƟve applicaƟon process as laid out in the CPC ordi‐
nance. Her appointment is pending confirmaƟon. Mr.
Frazen was replaced by Luisa Oliveira. Jim McCallum
stepped down as the Somerville Housing Authority and
his replacement in pending. The current members are:
Michael Fager (Chair), ConservaƟon Commission
representaƟve
Uma Murugan, (Vice‐chair), general public repre‐
sentaƟve
Dick Bauer, (Historic PreservaƟon Commission rep‐
resentaƟve
Michael A. Capuano, Planning Board representaƟve
Jane Carbone, general public representaƟve
(confirmaƟon pending)
Elizabeth Duclos‐Orsello, general public representa‐
Ɵve
Luisa Oliveira, Parks and Open Space Department
representaƟve
Jessica Palacios Yamakawa, general public repre‐
sentaƟve
The Community Preservation Plan
The Community PreservaƟon Plan provides an overview
of the CPA in Somerville and establishes the Com‐
miƩee’s prioriƟes for funding projects. The FY18 Plan
was based on the City’s exisƟng planning documents
and resident input and includes the CPA monitoring and
evaluaƟon plan. The CPC invited feedback on the FY18
Plan update at a public hearing on June 28, 2017 and
through a six‐week wriƩen comment period. Comments
received from residents during the FY18 public com‐
ment period are available on the CPA website.
1 The CPA legislaƟon uses the term community housing to refer to housing for individuals and families with incomes below 100% of area median
income (AMI). This report uses the terms community housing and affordable housing interchangeably.
2 Excludes Cape Cod communiƟes that passed the predecessor to the CPA.
4
FY18 Funding
Key sources of CPA funding include a 1.5% surcharge
on net property taxes, an opƟonal city appropriaƟon,
and a match from the Commonwealth of Massachu‐
seƩs. Figure 1 shows how this money flows into the
CPA Fund over the course of the fiscal year. Since CPA
adopƟon in 2012, over $21.4 million has been appro‐
priated for 55 projects across the three CPA eligible
categories: open space/recreaƟonal land, historic
preservaƟon, and affordable housing, including over
$2.5 million dollars in matching funds from the state
(Table 3).
In FY17, the City had $2.5 million available to spend on
projects (Table 1). Up to 5% of new annual CPA reve‐
nue can be used each year to administer the CPA pro‐
gram. In FY18, $99,224 was available in administraƟve
funds.
As part of the Community PreservaƟon Plan, the CPC
dedicated a minimum of 45% of FY18 revenue for
affordable housing, to be administered by Somerville’s
Affordable Housing Trust Fund (Table 2).3 In FY18,
$1,200,402 was appropriated to the Trust. $304,634
was available for historic resources and open
space/recreaƟonal land projects. The Henry Hansen
Park design contract came in under budget, so the pro‐
ject returned $14,200 to the CPA open
space/recreaƟonal land reserve, increasing the amount
available for open space projects to $318,834 with an
addiƟonal $210,000 available for acquisiƟon. In addi‐
Ɵon, $1,082,303 was available in flexible funds, includ‐
ing $673,805 in unspent project funds that rolled over
from FY17. These funds are available for worthy pro‐
jects in any CPA category that cannot be funded from
the designated funds in the category specific reserves.
5 The Community PreservaƟon Act allows communiƟes to allocate funding to the community’s Affordable Housing Trust Fund.
Total FY18 new revenue available in FY18
$1,924,661
Surcharge (esƟmate)
$1,660,425
State match
$324,064
Total FY17 unexpended revenue (rollover)
$1,883,805
FY17 City appropriaƟon (available for FY18)
$500,000
Unallocated project funds
$1,383,805
Total Funding Available in FY18
$3,808,466
(CPC admin funds)
($99,224)
Total Project Funding Available in FY18
$3,709,242
FY18 City appropriaƟon (available to spend in FY19)
TBD
Table 1. FY18 CPA Budget
Unexpended FY17
EsƟmated FY18
Total FY18 CPA
Funds Available
Open Space & RecreaƟon (15%)
$710,000
$304,634
$1,028,834
Historic Resources (15%)
$0
$304,634
$304,634
Community Housing (45%)
(appropriated to AHTF)
$0
$1,200,402
$1,200,402
Undesignated (25%)
$673,805
$408,498
$1,082,303
Total
$1,383,805
$2,218,168
$3,616,173
Returned Funds
$14,200
$0
$0
$0
$14,200
Table 2. Minimum AllocaƟon of CPA Funding Available in FY18
5
Community PreservaƟon Act Fund
FY14 Actual FY15 Actual FY16 Actual
FY17
Actual
Total
Total Funding Available
2,681,180
6,223,963
4,868,257
2,776,974
n/a
Current Fiscal Year Revenue
2,681,180
3,542,783
2,889,136
2,588,146
15,710,167
Surcharge Revenue
1,323,320
1,430,721
1,546,198
1,664,815
9,402,549
City AppropriaƟon**
1,355,671
1,200,000
510,844
500,000
3,566,515
State Match of Previous Year's Local Revenue
0
904,917
829,456
420,681
2,723,175
Interest
2,189
7,145
2,638
2,650
17,929
Rollover from Previous Fiscal Year
0
2,681,180
1,979,121
188,828
n/a
AppropriaƟons and Encumbrances
56,769
4,188,072
3,941,950
2,329,797
13,515,752
CommiƩee admin expenses
(up to 5% of annual revenue)
56,769
93,585
61,827
86,675
486,510
Open Space and RecreaƟon Projects
0
227,463
695,160
777,239
3,902,870
Historic Resources Projects
0
1,660,996
600,288
585,467
3,004,851
Community Housing Projects
0
2,206,028
1,834,675
880,416
6,121,521
Funding Available for Projects in Next Fiscal
Year (Rollover)
2,681,180
1,979,121
188,828
1,883,805
n/a
Open Space and RecreaƟon Reserve*
402,177
706,131
0
710,000
n/a
Historic Resources Reserve*
402,177
0
0
0
n/a
Community Housing Reserve*
1,206,531
594,755
0
0
n/a
Undesignated Project Funding*
670,295
678,234
188,828
673,805
n/a
Current Year’s Unallocated City AppropriaƟon
—
—
—
—
n/a
*FY18 funding available for FY18 projects; ** FY18 City appropriaƟon not final when report finalized; FY19 City appropriaƟon determined in
Spring 2019.
FY18
Thru 5/10
3,976,324
2,092,519
1,718,747
0
370,465
3,307
1,883,805
3,653,344
91,834
2,203,008
158,100
1,200,402
210,000
210,000
0
FY19 Est.
2,126,403
1,916,403
1,718,747
0
197,656
0
210,000
95,820
95,820
Table 3. CPA Funding Since AdopƟon
6
Figure 1. CPA Fiscal Year Funding Flows*
*Annual cycle will change in FY19 based on applicant feedback.
7
Open Space/
RecreaƟon (8)
Project
Applicant
Request
Funded
Project Summary
5 Palmer AcquisiƟon
City of Somerville
Economic
Development
$500,000
$500,000
The City of Somerville will acquire the 0.04 acre parcel that will add to the recre‐
aƟonal land at the Capuano School/Glen Park.
ArtFarm
City of Somerville
Parks and Open
Space
$1,000,000
$0
The City of Somerville will create a space for arts, culture, recreaƟon, and urban
agriculture. The project was invited to re‐apply in FY19, closer to the Ɵme when
construcƟon is expected to begin.
Blessing of the Bay Park
Design– Phase II
MysƟc River
Watershed
AssociaƟon
$174,305
$155,339
MyRWA will lead a robust community engagement process and conƟnue the
design process through construcƟon documents for the Blessing of the Bay Boat‐
house Park.
Community Growing
Center ConstrucƟon
Friends of the
Community
Growing Center
$456,932
$350,000
The Friends of the Community Growing Center will implement the CPA funded
design to improve the funcƟonality and accessibility of the Growing Center.
Community Path– Inva‐
sive Species and Tree
Canopy
City of Somerville
Parks and Open
Space
$15,000
$15,000
The City of Somerville will expand the planned redesign for the Community Path
to include developing a plan to manage invasive species and the tree canopy
along the Path.
Dilboy Auxiliary Design
City of Somerville
Parks and Rec
$140,000
$90,000
The City of Somerville will procure design services to renovate the Dilboy Auxilia‐
ry grass playing fields.
East Somerville Commu‐
nity Schoolyard Enhance‐
ment
City of Somerville
Department of
Public Works
$286,000
$0
The City of Somerville will add irrigaƟon, a retaining wall, and planƟngs to reha‐
bilitate the schoolyard. The project was invited to reapply in FY19 with a more
defined scope if funds are sƟll needed.
Schoolyard Design–
Brown and West Somer‐
ville
City of Somerville
Parks and Open
Space
$160,000
$140,000
The City of Somerville will hire a firm to develop new designs for the schoolyards
at the Brown and West Somerville Schoolyards.
Total Open Space & RecreaƟonal Land
$2,728,416
$1,250,339
Table 4. FY18 Open Space/RecreaƟon ApplicaƟons
FY18 Funding Requests– Historic Resources and Open Space/Recreational Land
The CPC received 12 full applicaƟons for historic resources and open space/recreaƟon land funding totaling $3,712,016 in FY18.
8
Table 5. FY18 Historic Resources ApplicaƟons
Project
Applicant
Request
Funded
Project Summary
Blended Historic
Resources & Open
Space/ RecreaƟon
(1)
Prospect Hill Park
ConstrucƟon
(Blended)
City of Somerville
Parks and Open
Space
$800,000
$797,330
The City of Somerville will implement the new design for the park, which was
funded by CPA.
Total Blended
$800,000
$797,300
Historic Resources
(2)
PreservaƟon and
Access of ElecƟons
Records
City of Somerville
ElecƟons
$85,100
$85,100
The City of Somerville will remediate mold on the historic elecƟons records and
digiƟze them so they are accessible to all.
Elizabeth Peabody
House Roof Replace‐
ment
Elizabeth Peabody
House AssociaƟon
$73,000
$73,000
The Elizabeth Peabody House AssociaƟon will replace the roof on their build‐
ing, which has been determined to be historically significant by the Somerville
Historic PreservaƟon Commission.
Total Historic Resources
$158,100
$158,100
Total FY18
$3,712,016
$2,205,769
9
FY18 Application Process– Historic
Resources & Open Space/Recreation
The Community PreservaƟon CommiƩee manages an
annual applicaƟon process for historic and open
space/recreaƟonal land projects. As the housing arm of
the CPC, the Somerville Affordable Housing Trust Fund
manages the applicaƟon process for affordable housing
funds. FY18 was the first year the CPC insƟtuted a pre‐
applicaƟon process for individuals and organizaƟons
interested in submiƫng a project for CPA funding on
City land. The purpose of this process is to idenƟfy
these projects early in the applicaƟon process so that
the relevant City department can determine if they will
sign on as a co‐applicant with sufficient Ɵme to be able
to develop the project idea and full applicaƟon in part‐
nership with the community applicant. The CPC re‐
ceived one pre‐applicaƟon for design services at the
West Somerville Neighborhood Schoolyard. The Parks
and Open Space Division agreed to take on the applica‐
Ɵon as a submission from the division. Seventeen insƟ‐
tuƟons submiƩed eligibility determinaƟon forms in
September 2017 and were determined eligible. Ten
submiƩed full proposals and the ArtFarm project sub‐
miƩed an update to their FY17 submission. The Somer‐
ville community commented on the applicaƟons
through two public meeƟngs, where 23 individuals
spoke about their support for projects, and a wriƩen
comment period, where 123 people submiƩed com‐
ments. The comments from both the public meeƟngs
and the wriƩen comments are available on the CPA
website.
During their March 28, 2018 meeƟng, the CPC voted to
recommend fully funding three applicaƟons and par‐
Ɵally funding five. Three projects were not recom‐
mended for funding, including ArtFarm which was in‐
vited to resubmit in FY19 with the final design. See ta‐
bles 4 and 5 on the previous pages for details. The
Board of Alderman approved the CPC’s eight funding
recommendaƟons at their April 26, 2018 meeƟng.
In FY18, in total, the CPC recommended and the Board
of Aldermen approved 2,047,669 for Open Space and
RecreaƟonal Land projects, $158,100 for Historic Re‐
sources projects, and $7,201,640 in Community Hous‐
ing projects through the Affordable Housing Trust
Fund. This includes five City proposed projects, four
community organizaƟon proposed projects and one
joint City‐community projects. Since the start of the
CPA in Somerville, over to $21.4 million has been
awarded to projects across the three CPA categories:
$3.7 million for Open Space and RecreaƟonal Land pro‐
jects, $5.5 million on Historic Resources projects
(including the $2.5 million bond for the West Branch
Library restoraƟon) and $12.1 million on Community
Housing projects (Table 3).
FY18 Affordable Housing Funding
In FY18, upon the recommendaƟon of the CPC, the
Board of Aldermen approved allocaƟng $1,200,402 in
CPA funds to the Somerville Affordable Housing Trust
Fund (AHTF or Trust; see Table 2 above).5 The CPC em‐
powered the Trust to serve as the housing arm of the
CPC in FY15 given the Trust’s 25 years of experience
preserving and creaƟng affordable housing units and
supporƟng programs to assist homeowners and
renters.
The Trust has prioriƟzed preserving or increasing the
supply of affordable housing in Somerville and helping
low‐to‐moderate income households gain access to or
retain housing. Projects and programs serving individu‐
als and families at or below 100% of the area median
income (AMI) are eligible for CPA‐funded Trust pro‐
jects.
In FY18, the Trust requested the CPC recommend
bonding up to $10 million for the 100 Homes project
implemented by the Somerville Community Corpora‐
Ɵon (SCC). and the Clarendon Hill Apartments develop‐
ment implemented by PreservaƟon of Affordable Hous‐
ing (POAH), SCC, and the Somerville Housing Authority.
These projects applied for funding from the Trust in
FY17. The CPC recommended, and the BOA approved,
a $6 million for the 100 Homes project. The CPC will
consider recommending bonding for the Clarendon Hill
project when plans are finalized.
In FY18, as in previous years, the Trust released a Re‐
quest for InformaƟon and then a subsequent applica‐
Ɵon for proposals for CPA funds.
10
Ongoing Project Update
FY15 was the first year for CPA grantmaking in Somer‐
ville, since then nine projects have been completed.
Two projects funded in FY15 returned funding– First
Church Somerville Window RestoraƟon and American
Tube Works naƟonal register nominaƟon (City of Som‐
erville, Planning and Zoning). Both projects are conƟnu‐
ing with other sources of funding.
In FY15‐FY18, the CPC has determined that a minimum
of 45% of funding will go to community housing and
15% each to historic resources and open
space/recreaƟon; 20% of funds are flexible and can be
spent on projects in the three CPA categories based on
demand. The remaining 5% goes to support the admin‐
istraƟon of the program. Of the program funds, to
date, not considering bonding, 48% has gone to afford‐
able housing, 23% to historic resources, and 29% to
open space/recreaƟonal land. When the West Branch
Library and 100 Homes bonds are included, the per‐
centage awarded to historic resources increases to 26%
and affordable housing increases to 57%; open
space/recreaƟonal land decreases to 17% (see Figure
2).
Of the 55 projects that have received funding FY15‐
FY18:
53% are implemented by community organizaƟons
(29)
36% are implemented by City departments (20)
11% are jointly implemented by community organi‐
zaƟons and City departments (6)
Non‐City grantees receive their project funding in
tranches established at the beginning of the project.
The final 10% of the budget is released upon the com‐
pleƟon of the project and submission of a final report.
Figure 2. Total CPA Funding AllocaƟons
57%
26%
17%
Allocation of CPA Funds by Category
with bonding
Affordable Housing
Historic Resources
Open Space/Recreation Land
48%
23%
29%
Allocation of CPA Funds by Category
without bonding
Affordable Housing
Historic Resources
Open Space/Recreation Land
11
Completed Projects
Prospect Hill Tower Renovation
City of Somerville, Planning & Zoning Division
Amount Funded
Percent Disbursed
$500,000
85% ($427,425)
$72,575 returned
Year Awarded
FY15
The Prospect Hill Tower RenovaƟon is the Somerville CPA’s first completed project. The Tower was officially
reopened during the First Flag ceremony on January 1, 2016 and the CPA celebraƟon was held on September
20, 2016. To ensure that all Somerville residents can experience the Tower, CPA supported the creaƟon of a
virtual tour video, George Washington … on Prospect Hill? which is available on the City’s website with subƟtles
in English, Spanish and Portuguese (HaiƟan Kreyol is coming soon). The Tower is now open in warm weather
for docent tours.
Photo source: Graham Baker
Milk Row Cemetery Rehabilitation and Restoration– FY15
City of Somerville, Planning & Zoning Division
Amount Funded
Percent Disbursed
$48,360
100%
Year Awarded
FY15
The City of Somerville contracted a firm to complete the rehabilitaƟon and restoraƟon work of the tombs in
Milk Row Cemetery. They completed their work summer 2016. Following receiving CPA funding, the project
received matching funds from the MassachuseƩs Historical Commission and the City of Somerville Planning
and Zoning Department.
City of Somerville Archives Processing Contractor
City of Somerville Archives
Amount Funded
Percent Disbursed
$43,000
100%
Year Awarded
FY15
The Somerville Archives contracted a consultant to process permanent collecƟons and create record guides.
These documents are available on the Archives website.
12
Mystic Water Works Historic Windows
Somerville Housing Authority
Amount Funded
Percent Disbursed
$243,000– historic
$507,000– housing
100%
Year Awarded
FY15
FY16
The MysƟc Water Works project provides affordable housing for 25 seniors and persons living with disabiliƟes.
The Community PreservaƟon CommiƩee provided funding to preserve the historic windows; the Affordable
Housing Trust Fund provided funding for the housing component in FY16. Residents moved into the building in
February 2018.
Amount Funded
Percent Disbursed
$450,945
100%
Year Awarded
FY15
Temple B’Nai Brith installed a fire safety sprinkler system and an elevator in their historic building.
Temple B’nai Brith Fire Safety and Accessibility Project
Temple B’nai Brith
83 Belmont St. Window Restoration
Laura de la Torre Bueno
Amount Funded
Percent Disbursed
$4,510
100%
Year Awarded
FY17
This project provided resources for the property owners at 83 Belmont St. to replace the original stained glass
window in their home which was damaged in a fire. The home is on the naƟonal register of historic places. The
restoraƟon of the home was featured in the Boston Globe and received a Director’s PreservaƟon Award from
the Somerville Historic PreservaƟon Commission.
100 Homes Initiative Pilot
Somerville Community Corporation
Amount Funded
Percent Disbursed
$1,200,000
(loan)
100%
Year Awarded
FY15
This Somerville Community CorporaƟon program was established with the goal of creaƟng 100 new units of
affordable housing. To date, SCC has acquired has acquired 20 units. The CPA funds are a subsidy that will be
released when the SCC secures permanent financing to make the units affordable.
13
Healey School to Mystic
Friends of the Healey
Amount Funded
Percent Disbursed
$45,000
100%
Year Awarded
FY15
The Friends of the Healey hired a firm to develop a master plan for the open and recreaƟon space around the
Healey School, MysƟc Housing Authority and Blessing of the Bay Boat House. The goal was to beƩer connect
the three places, which are geographically very close but difficult to access from each locaƟon. The City of Som‐
erville supported the Friends in implemenƟng a compeƟƟve selecƟon process for the design firm. The design
team developed two opƟons for the Healey+MysƟc Master Plan, which can be seen at: hƩp://healeymysƟc.org.
In FY17, design funds were awarded for the design of the Healey Schoolyard (City of Somerville) and the Bless‐
ing of the Bay Boathouse Park (MysƟc River Watershed AssociaƟon). Both will build on the Healey+MysƟc Mas‐
ter Plan.
School Garden Classrooms
Groundwork Somerville
Amount Funded
Percent Disbursed
$45,373
100%
Year Awarded
FY15
This Groundwork Somerville improved eight school yard garden classrooms in Somerville. The project has re‐
ceived in‐kind materials from the Somerville School District, which allowed the full vision of the project to be
completed. Over 1,000 Somerville students have benefited from the project. Students at the East Somerville
Community School held the ribbon cuƫng for the project in October 2016 with Mayor Curtatone and Superin‐
tendent Skipper.
Community Growing Center Design
Friends of the Community Growing Center
Amount Funded
Percent Disbursed
$52,090
100%
Year Awarded
FY15
The Friends of the Community Growing Center hired a firm to create a new design for the Community Growing
Center. More informaƟon about the project is available at: hƩp://www.thegrowingcenter.org/#!redesign/tof3d
14
Ongoing Historic Projects
Somerville City Hall Renovation, Design, and Construction Management
City of Somerville, Capital Projects Department
Amount Funded
Percent Disbursed
$200,000
0%
Year Awarded
FY15
Photo source: Eric Kilby
This project will contract a design firm to develop a design to restore the exterior of Somerville City Hall, up‐
grade mechanical and life safety systems, and ensure accessibility. This project will begin once the owner’s pro‐
ject manager is hired.
West Branch Library Restoration
City of Somerville, Capital Projects Department
Amount Funded
Percent Disbursed
0%
Year Awarded
FY16
The City of Somerville will restore and preserve the exisƟng library interior and exterior and ensure ADA
compliance. The design has been finalized and construcƟon will begin in late 2018.
$2,500,000
(bonded)
Local Historic District Property Owner Preservation Fund
City of Somerville, Planning & Zoning Division
Amount Funded
Percent Disbursed
$150,000
0%
Year Awarded
FY16
This project will provide resources for the City of Somerville to create a dedicated fund that will provide small
grants to owners of local historic district designated properƟes for the restoraƟon and preservaƟon of their
structures. The City plans for the fund to be mulƟ‐year and renewable. The fund will be managed by the Office
of Strategic Planning and Community Development’s PreservaƟon Staff along with the Historic PreservaƟon
CommiƩee.
15
Milk Row Cemetery Rehabilitation and Restoration– FY16
City of Somerville, Planning & Zoning Division
Amount Funded
Percent Disbursed
$48,360
94%
($31,367)
Year Awarded
FY16
FY17
The City of Somerville is working with a consultant to complete the restoraƟon work of an anƟcipated 48 grave
markers and the Civil War Monument in Milk Row Cemetery. $6,300 from the FY16 project was spent to com‐
plete the FY15 tomb restoraƟon project when the contractors uncovered more extensive damage than ex‐
pected. The FY17 CPA award for the project will replace these funds, allowing the full project to be completed
summer 2016.
Somerville Museum Capital Improvements– FY15
Somerville Historical Society
Amount Funded
Percent Disbursed
$168,191
90%
($150,181)
Year Awarded
FY15
The Somerville Historical Society is making improvements to the Somerville Museum to beƩer preserve its col‐
lecƟons and make the building ADA accessible. The project originally planned to construct an elevator liŌ. The
MassachuseƩs Architectural Access Board determined this was not sufficient as it would not reach all Museum
floors. The CPC and Board of Aldermen approved using the $24,970 allocated for the liŌ towards the design,
purchase and installaƟon of the elevator. An addiƟonal $423,480 for the project was approved for FY16 CPA
funding by the Board of Aldermen upon the CPC’s recommendaƟon.
20%
($86,316)
Somerville Museum Capital Improvements– FY16
Somerville Historical Society
Amount Funded
Percent Disbursed
$423,480
Year Awarded
FY16
This project will provide further resources for the Somerville Museum to become ADA compliant and care for
its historic collecƟons. This will include building an elevator to meet ADA requirements, reinstalling the Muse‐
um’s original Palladian window that was removed in 1986 per a deed restricƟon with the MassachuseƩs Histor‐
ical Society, upgrading security systems, inventorying the Museum’s holdings, and planning for Phase 6 of the
Museum’s strategic plan. AbuƩers are challenging the Museum’s permit from the Zoning Board of Approvals in
Land Court. UnƟl this maƩer is resolved, no funds related to the construcƟon of the elevator will be released to
the Museum. The other aspects of the project are moving forward.
16
Central Library Mold Remediation
Somerville Public Libraries
Amount Funded
Percent Disbursed
$21,279
0%
Year Awarded
FY17
This project will provide resources for the City of Somerville to remediate historic materials damaged by mold
in the Closed Stacks, move them to the Library’s Local History Room, and install a 10,000 BTU air condiƟoning
unit in the Local History Room to ensure the historic materials are appropriately stored and preserved.
Elizabeth Peabody House Roof Restoration
Elizabeth Peabody House Association
Amount Funded
Percent Disbursed
$73,000
0%
Year Awarded
FY18
The roof of the historic building that is home to the Elizabeth Peabody House AssociaƟon currently faces water
infiltraƟon. This project will make necessary repairs to the roof to ensure the building is water Ɵght. The build‐
ing houses a pre‐school, food pantry, and other social services offered by the AssociaƟon.
Grace Baptist Church Restoration
Somerville Hispanic Association for Community Development
Amount Funded
Percent Disbursed
$553,378
50%
($275,000)
Year Awarded
FY17
This project will rehabilitate the historic Grace BapƟst Church, which is now home to the Somerville Hispanic
AssociaƟon for Community Development, which operates a food pantry from the building. The building is also
home to a day care. The first phase of the project will focus on the roof and iniƟal steps to make the building
accessible for all.
17
Preservation of and Access to Election Records
City of Somerville, Elections Department
Amount Funded
Percent Disbursed
$85,100
0%
Year Awarded
FY18
This project will remediate historic elecƟon records damaged by mold. It will also digiƟze them so they are easi‐
ly accessible to all. CPA funds are supporƟng the preservaƟon and digiƟzaƟon of the historic records from 1884
to 1967 and the City is funding the digiƟzaƟon of records from 1967 to the present. The records include voter
lists used at polls, indices of registered votes, general registers, voter annual registers by ward and precinct,
preliminary and general elecƟons results, poll taxes, and lists of women voters.
Open Space & Recreation Land
Prospect Hill Park Design Services
City of Somerville, Parks and Open Space Division
Amount Funded
Percent Disbursed
$85,000
98%
($83,999)
Year Awarded
FY15
The City of Somerville has contracted a firm to develop a design for the Prospect Hill Park. The first step was to
conduct an archeological reconnaissance survey of the park to determine if there are any archeologically sensi‐
Ɵve areas. The survey was completed in April 2017. Due to the slope of the hill and historic soil disturbance,
there is low archeological sensiƟvity for NaƟve American, RevoluƟonary War, or Civil War arƟfacts. There is
moderate sensiƟvity for locaƟng the foundaƟon of two homes that were present on the hill before the land
was turned into a park. The City is in the process of hiring a construcƟon firm and anƟcipates work will begin
summer 2018.
Photo source: Eric Kilby
South Street Farm
Groundwork Somerville
Amount Funded
Percent Disbursed
$60,160
90%
($54,144)
Year Awarded
FY16
Groundwork Somerville is expanding the capacity of the South Street Farm to be used as public space and an
outdoor classroom, in addiƟon to its current funcƟon as an urban farm. This will include construcƟng a shade
structure, wash staƟon, bicycle parking, and tables and benches. Groundwork Somerville will also make im‐
provements such as conducƟng a phytoremediaƟon project, creaƟng new rain collecƟon surfaces and storage,
installaƟon of composƟng structures, and improving on‐site water and drainage management.
18
Allen Street Mixed Use Renovation
City of Somerville Parks and Open Space Division and Stephanie Hirsch
Amount Funded
Percent Disbursed
$20,000
100%
Year Awarded
FY16
The City of Somerville has contracted a landscape architect to develop a design to rebuild the Allen Street Open
Space and is currently engaging the community through a public process. The design will seek to maintain or
expand the 16 exisƟng community garden plots while adding a play area for children, serving the surrounding
community and the Allen Street Head Start School, which is directly across from the open space.
Photo source: Google Earth
Hoyt Sullivan Playground Renovation
City of Somerville Parks and Open Space Division
Amount Funded
Percent Disbursed
$400,000
100%
Year Awarded
FY16
The City of Somerville is renovaƟng the 22,000 square foot Hoyt Sullivan Playground. The renovaƟon will in‐
clude improving ADA and universal access, new lighƟng, circulaƟon paths, improving the tree canopy and sus‐
tainable pracƟces, providing acƟve and passive recreaƟon with a focus on younger children and improved visu‐
al connecƟons to the community path and rail corridor via a new deck overlook. ConstrucƟon on the park be‐
gan in May 2017 and is anƟcipated to be complete Fall 2018.
Community Path Repaving
City of Somerville Engineering Division and Friends of the Community Path
Amount Funded
Percent Disbursed
$140,000
100%
Year Awarded
FY16
The Community Path from Grove St. to Cedar Street was repaved in May 2017. The secƟon from Buena Vista
Rd. to the Cambridge line will be repaved following a planned drainage improvement project that will take
place summer 2018.
19
Community Path Design
City of Somerville Parks and Open Space Division and Friends of the Community Path
Amount Funded
Percent Disbursed
$90,000
0%
Year Awarded
FY16
FY18
The City of Somerville and the Friends of the Community Path will lead a design process that will make im‐
provements to the exisƟng Community Path and add addiƟonal features. The design will emphasize adding
green infrastructure to the Grove to Cedar secƟon to improve drainage. AddiƟonal funds were added to the
project in FY17 to include plans to manage invasive species and the tree canopy. The City has idenƟfied the
design firm that will lead the process.
Community Path Survey
City of Somerville Parks and Open Space Division
Amount Funded
Percent Disbursed
$20,000
0%
Year Awarded
FY17
The City of Somerville will hire a design firm to complete a survey of the Community Path, a necessary input
for the design process.
Land Acquisition Study Fund
City of Somerville Parks and Open Space Division
Amount Funded
Percent Disbursed
$40,000
6%
($2,500)
Year Awarded
FY17
This project provides resources for the City of Somerville to explore the feasibility of acquiring parcels for ac‐
quisiƟon for open space and recreaƟon land. The fund supports appraisals, environmental studies, surveys, and
other preliminary studies necessary to determine if a parcel is a good candidate for acquisiƟon and gather the
necessary informaƟon to prepare a full proposal for submission to the Community PreservaƟon CommiƩee for
CPA funding or directly to the Board of Aldermen for funding through non‐CPA sources.
20
Henry Hansen Park
City of Somerville Veterans’ Services
Amount Funded
Percent Disbursed
$49,200
71%
($14,200 returned)
Year Awarded
FY17
The City of Somerville has hired a firm to develop a new design for Henry Hansen Park, which honors the Som‐
erville resident who parƟcipated in the first raising of the American flag at Iwo Jima during World War II. The
City is now gathering community input on the proposed design. The cost of the project was lower than ex‐
pected, so the project was able to return $14,200 to the CPA fund.
Healey Schoolyard Design
City of Somerville Parks and Open Space Division
Amount Funded
Percent Disbursed
$80,000
0%
Year Awarded
FY17
The City of Somerville will hire a firm to complete a new design for the Healey Schoolyard. This project will be
informed by the Healey+MysƟc Master Plan that was funded by CPA in FY15.
Winter Hill Schoolyard Construction
City of Somerville Parks and Open Space Division
Amount Funded
Percent Disbursed
$500,000
100%
Year Awarded
FY17
The City of Somerville is in the process of compleƟng the construcƟon of a new schoolyard for the Winter Hill
Community InnovaƟon School. The project will be completed Summer 2018.
21
Blessing of the Bay Park Design– Phase 1
City of Somerville Veterans’ Services
Amount Funded
Percent Disbursed
$41,863
90%
($37,498)
Year Awarded
FY17
MysƟc River Watershed AssociaƟon conducted community outreach in conjuncƟon with Groundwork Somer‐
ville and hired a firm to complete a schemaƟc design for the park. The community process is ongoing.
Community Pollinator Garden
City of Somerville Parks and Open Space Division and Green and Open Somerville
Amount Funded
Percent Disbursed
$13,000
0%
Year Awarded
FY17
The City of Somerville and Green and Open Somerville will create a buƩerfly garden at the edge of Morse‐Kelly
Park. Work has started to prepare the space for planƟng in the fall.
Community Growing Center Construction Documents
Friends of the Community Growing Center
Amount Funded
Percent Disbursed
$33,176
68%
($22,500)
Year Awarded
FY17
The Friends of the Community Growing Center hired a landscape architect to complete the construcƟon docu‐
ments and bid package for the design funded by CPA in FY15. More informaƟon about the project is available
at: hƩp://www.thegrowingcenter.org/#!redesign/tof3d
22
Prospect Hill Park Construction
City of Somerville, Parks and Open Space Division
Amount Funded
Percent Disbursed
$797,330
0%
Year Awarded
FY18
The City of Somerville will implement the a redesign for the park that was funded by the CPA. ConstrucƟon will
begin Summer 2018. The new park will include accessibility for all, interpreƟve elements to educate visitors
about the historic significance of Prospect Hill, improved lighƟng for the park and the Tower, and naƟve spe‐
cies.
Photo source: Eric Kilby
5 Palmer Acquisition
City of Somerville, Economic Development Division
Amount Funded
Percent Disbursed
$500,000
100%
Year Awarded
FY18
The City of Somerville acquired the 0.04 parcel, which will add to the open space at the Capuano School/Glen
Park. The parcel will be perpetually preserved as recreaƟonal land per the requirements of the Community
PreservaƟon Act.
Photo source: Google Maps
Dilboy Auxiliary Fields Design Services
City of Somerville, Parks and Recreation Department
Amount Funded
Percent Disbursed
$90,000
0%
Year Awarded
FY18
The City of Somerville will hire a firm to redesign the Dilboy Auxiliary fields. The project will include renovaƟng
the soil profile and reorganizing the space to add a U12 soccer field. IrrigaƟon and lighƟng will also be added to
the fields.
23
Brown and West Somerville Schoolyards Design Services
City of Somerville, Parks and Open Space Division
Amount Funded
Percent Disbursed
$140,000
0%
Year Awarded
FY18
The City of Somerville will hire a firm to create new designs for the schoolyards at the Brown and West Somer‐
ville schools.
Blessing of the Bay Park Design– Phase II
Mystic River Watershed Association
Amount Funded
Percent Disbursed
$155,339
0%
Year Awarded
FY18
The MysƟc River Watershed AssociaƟon will work with their selected design firm to complete the design
through to construcƟon documents with acƟve community input.
Community Growing Center Construction
Friends of the Community Growing Center
Amount Funded
Percent Disbursed
$350,000
0%
Year Awarded
FY18
The Friends of the Community Growing Center will hire a construcƟon company to implement the new design
funded by CPA in FY15 and FY16.
24
Ongoing Affordable Housing Projects
Redevelopment of 163 Glen Street
Somerville Community Corporation
Amount Funded
Percent Disbursed
$915,000
(loan)
Year Awarded
Somerville Community CorporaƟon is redeveloping the former American Legion Post into eight affordable units
and three market rate units. The CPA 5th anniversary walking tour began at the groundbreaking for the project
in September 2017. The target for full occupancy is June 2018.
FY15
90%
(819,862)
100 Homes Initiative
Somerville Community Corporation
Amount Funded
Percent Disbursed
$6,931,608
(loan)
25%
($1,707,056)
Year Awarded
FY16
FY18
To date, the 100 Homes project has acquired 45 fully deed restricted rental units in 10 properƟes that preserved 23 tenancies,
including 5 that were in danger of losing their SecƟon 8 vouchers. Five units are designated for homeless households.
25
Short Stop Self-Sufficiency Program
Wayside Youth and Family
Support Network
Amount Funded
Percent Disbursed
$51,107
50%
($25,553)
Year Awarded
FY16
FY17
The Short Stop program provides transiƟonal housing for homeless young adults. CPA funds cover the gap be‐
tween what HUD can fund (up to fair market rent) and what the actual cost of monthly rent is for nine individu‐
als at a Ɵme. To date the program has served 18 young adults. Nine have leŌ the program, of which seven are
living independently, one leŌ the program for other opportuniƟes, and one began a four year college program.
EducaƟonal stability has increased– during parƟcipaƟon in the program and once youth have leŌ the program.
Prevention and Stabilization Services (PASS)
Somerville Homeless Coalition
Amount Funded
Percent Disbursed
$182,978
0%
Year Awarded
FY15
FY17
This project provides rental assistance for up to 12 households for up to two years, including rental and move‐
in assistance, case management and stabilizaƟon services. The program is designed to serve households of in‐
comes at or below 60% of area median income (AMI) and to help Somerville residents who are experiencing a
housing crisis that may have resulted from burdensome rental increases or losses in income to allow them to
stay in the City. The grant contract is being finalized.
Amount Funded
Percent Disbursed
$150,513
59%
($88,975)
Year Awarded
FY15
FY16
FY17
Better Homes Program
Somerville Homeless Coalition
CPA funding for the BeƩer Homes Program fills the gap between HUD Fair Market Rent reimbursements and
the actual market rents at 12 scaƩered‐site apartments leased by the Somerville Homeless CoaliƟon. This pro‐
gram has supported 22 people (three families and 14 individuals), nine of whom qualify as chronically home‐
less. The program is designed to serve households of incomes at or below 60% of area median income (AMI)
and to help Somerville residents who are experiencing a housing crisis that may have resulted from burden‐
some rental increases or losses in income to allow them to stay in the City.
26
CPA Results
As a result of Somerville’s CPA projects, which are located in all seven of Somerville’s wards:
9 historic buildings are being preserved
5 historic buildings and one collecƟon are being made more accessible to all Somerville residents
3 historic collecƟons are being preserved
7 parks and playgrounds are being improved
78 new affordable housing units are being created
2 transit oriented affordable housing developments are being built
32 households are receiving rental assistance
Program Improvements
The informaƟon gained from the annual surveys has
helped the CPA program improve in Somerville. Addi‐
Ɵonal resources have been developed to help appli‐
cants through the process and the CPA Manager holds
applicaƟon workshops with the video from the session
available online for those who cannot aƩend. A new
pre‐applicaƟon process was added in FY18 to help con‐
nect community members and organizaƟons with an
idea for a CPA project on City land will the relevant de‐
partment to develop their applicaƟon as partners, if the
department agrees to sign on as a co‐applicant. The
new FY19 applicaƟon Ɵmeline will help applicants hire
firms before they are booked for the construcƟon sea‐
son. A feasibility study funding program was also
launched.
Community Engagement
In addiƟon to seeking community input through the an‐
nual applicaƟon and Community PreservaƟon Plan pro‐
cesses, the CPC seeks community feedback on the pro‐
gram by tabling a community events in Somerville. In
FY18, the CPC agreed that each member will parƟcipate
in one outreach event to expand the ability to parƟci‐
pate in events beyond the CPA Manager’s availability.
Through the SomerStreets events and the Spring Clean‐
up, 276 people voted on how they would allocate CPA
funds. The CPC also invited the community to celebrate
the fiŌh anniversary of the adopƟon of CPA In Somer‐
ville in September. There was a walking tour to five CPA
projects in east and central Somerville that ended with
a procession to Prospect Hill Park lead by the Desper‐
ate Measures Street Band. The celebraƟon at the park
included more music, lawn games, tours of Prospect
Hill Tower, and of course, cake. Board of Aldermen
President William White and State RepresentaƟve Mike
Connolly spoke about the benefits of CPA to Somerville
along with communi‐
ty members repre‐
senƟng each aspect
of the CPA program.
CPA & the
City Forum
The Somerville CPC
has recognized the unique challenges faced by ciƟes
implemenƟng CPA such as greater density and rapid
development puƫng pressure on affordable housing.
Somerville hosted a forum for ciƟes that have adopted
CPA so these communiƟes could get together to meet
each other and share their challenges and strategies for
addressing them. Thirty‐seven CPC members and their
staff from 15 communiƟes aƩended. The conversaƟons
were documented via graphic facilitaƟon by Somerville
resident Kelvy Bird. Her images will be shared with CPA
communiƟes across the state in the fall 2018, at the
first state‐wide CPA conference since 2012. The success
of the CPA and the City Forum inspired the Community
PreservaƟon CoaliƟon to hold this conference and to
include a special track for ciƟes.
CPA Applicant and Implementer Survey Results
Since FY16, the CPA program has surveyed applicants and implementers about their experience with CPA.
On average:
93% of implementers and 100% of applicants found the support of the CPA Manager to be very useful
40% of applicants found the applicaƟon process to be fairly easy and very transparent
62% of funded projects would not have gone forward without funding from CPA
84% of organizaƟons implemenƟng a CPA project benefited from being part of CPA beyond receiving funding
27
Looking Ahead to FY19
The CPC projects a minimum of $1,986,473 in new CPA
funds will be available in FY19, including a minimum
11.5% match on FY18 revenue from the State (Table 6).
This is a record low distribuƟon, in part because this is
the first year that Boston and Springfield will be receiv‐
ing matching funds. The CPC is hopeful that efforts to
stabilize the CPA trust fund at the state level will be suc‐
cessful, ensuring high rates of state match going for‐
ward. In addiƟon to new funds for FY19, $210,000 in
funds earmarked for open space acquisiƟon are availa‐
ble from unspent funds from the previous year.
With the experience of four funding rounds to draw on,
in FY19 the Community PreservaƟon Act Program will
build on its strong foundaƟon to make improvements
that will improve the quality of projects and facilitate
the work of the CPC. Program improvement goals for
FY19 include:
Increase the diversity of CPC general public member
and funding applicants through expanding commu‐
nity outreach
Pilot the feasibility study funding program to make
resources available to people with ideas that need
some support to ensure the likelihood of success of
their project
Foster connecƟons between the CPA and Local Cul‐
tural Council applicant processes to connect appli‐
cants with resources for capital improvements as
well as programming and public art
Total FY19 New CPA Revenue
$1,916,403
Surcharge
$1,781,590
State match
$204,883
City appropriaƟon**
$0
(CPA admin funds)
($99,324)
Total FY19 New Project Funding
$1,887,149
Total FY18 Unexpended Revenue
$210,000
FY18 City appropriaƟon
$0
Land acquisiƟon earmark
$210,000
Total Available in FY19
$2,097,149
Table 6. Projected FY18 CPA Funding
City of Somerville, 1925
**FY18 City appropriaƟon not finalized when report
was finalized; FY19 City appropriaƟon determined in
Spring 2019.