Matters ▸ Attachment
Committee Report - PUPW - 10-25-18 — File 206958
Public Utilities and Public Works Committee
Page 1 of 8
Printed 11/8/2018
October 25, 2018
REPORT OF THE PUBLIC UTILITIES AND PUBLIC WORKS COMMITTEE
Attendee Name
Title
Status
Arrived
William A. White Jr.
Chair
Present
Jefferson Thomas ("J.T.") Scott
Vice Chair
Present
Lance L. Davis
Ward Six Alderman
Present
Others present: Alderman Mary Jo Rossetti, Alderman Ben Ewen-Campen, Oliver Sellars-Garcia
- OSE, Jason Grossfield - LAw, Steve MacEachern - DPW, Rich Raiche - Engineering, Stan
Koty - DPW, Annie Connor - Legislative Liaison, Peter Forcellese - Legislative Clerk.
The meeting took place in the Committee Room and was called to order at 6:42 PM by Chairman
White and adjourned at 8:20 PM.
Approval of the September 11, 2018 Minutes
RESULT:
ACCEPTED
200773: That the Commissioner of Public Works describe to this Board, the rationale for
treating multi-unit residences the same as single family residences for purposes of volume-
based escalation of water rates.
Alderman Davis requested that the Director of Water and Sewer attend a future meeting of the committee
to discuss this item.
RESULT:
KEPT IN COMMITTEE
202332: That the City Engineer repair the curb cut and sidewalk ramp at the intersection
of Murdock and Clyde Streets.
RESULT:
WORK COMPLETED
204486: Proposing an Ordinance for the management and elimination of natural gas leaks.
Chairman White commented on a court decision that struck down most of the provisions in Boston's
ordinance and asked Mr. Grossfield to re-draft an ordinance for the City of Somerville, keeping the parts
of Boston's ordinance that were not struck down in place.
Public Utilities and Public Works Committee
Page 2 of 8
Printed 11/8/2018
RESULT:
KEPT IN COMMITTEE
204552: That the Director of Capital Projects or the Director of SPCD update this Board
about the transportation management and parking plans for both the construction and the
post-construction phases of the new High School.
Ms. Connor reported that meetings are continuing on this matter. She will advise the Chair when there is
additional information for discussion by the committee.
RESULT:
KEPT IN COMMITTEE
205010: That the City Solicitor advise this Board about whether the way in which the
Beacon Street trees were taken down was compliant with state law and the city’s Tree
Ordinance.
Items #205010, 205498, 206440, 206594, 206707 were discussed together.
Mr. Grossfield reviewed the documents he submitted for item 206594 and said that they would be
sent to both the general and sub-contractors, rather than have the city lay the responsibility on just
one of them. The complaint is ready to go as soon as city staff comes up with a date.
RESULT:
WORK COMPLETED
205059: That the Administration present the information described herein about the
Brown School's physical plant and planned and completed renovations, to this Board, to
the School Committee, and to the Brown School community.
Alderman Davis explained that the intent of this order was to create a depository for repair, renovation
and replacement records pertaining to the Brown School physical plant. Mr. Koty spoke about damage
caused by a burst pipe, which has since been removed and capped. All repairs were performed and
contained the necessary sign-offs. Alderman Davis noted that, beyond the work performed by the DPW,
there are years of history about the building that he would like made available for parents to review,
including a full history of the building, any plans that may have been considered to stop using the school,
any planned rehabs, etc. He will work with Ms. Connor to explore the possibilities of compiling the data.
RESULT:
KEPT IN COMMITTEE
205498: That the City Solicitor provide the Committee on Public Utilities and Public
Works an opinion on the ability of the city to bar a contractor from future city work.
Items #205010, 205498, 206440, 206594, 206707 were discussed together.
Alderman Scott asked how the Purchasing Department would be aware if the city had a problem
with a particular contractor. Chairman White pointed out that the city would have to lay a
foundation, perhaps by having memo/letter on file, in order to disqualify a low bidder due to previous
problems.
Alderman Scott’s motion that the Administration prepare a memo for the Purchasing
Department deeming Newport Construction and Northern Tree to be “not considered
responsible bidders or offerors” for a period of 5 years, in reflection of their performance on
the Beacon St Reconstruction, was approved.
Public Utilities and Public Works Committee
Page 3 of 8
Printed 11/8/2018
RESULT:
WORK COMPLETED
205811: That the Director of Engineering and Superintendent of Inspectional Services
report to this Board on the registration of paving contractors pursuant to Ordinance 11-33.
Mr. Raiche reported that the process is being examined to work out the bugs and to verify the online
payment operation. Once completed, it will be available on CitzenServe and the permitting process will
allow the Engineering Department to conduct inspections. The system is expected to go live next week.
RESULT:
KEPT IN COMMITTEE
205813: That the Director of Engineering and the Superintendent of Inspectional Services
report to this Board on enforcement of the ordinance on driveway construction and paving
over front, back or side yards, with a list of violations and fines levied in 2016 and 2017.
Ms. Connor reported that 6 citations were issued during 2016-2017. In most cases, ISD received a call
from neighbors. Alderman Scott asked for a copy of the data referenced by Ms. Connor and
commented that during the past month, an entire yard was paved over at one property. Alderman
Davis commented on a similar situation and said that since the city’s pervious surface ordinance is
easy to work around, it may have to be tightened up. Chairman White asked that representatives
from ISD, Law and Planning attend a future meeting of the committee to discuss this matter (when it
appears on the agenda).
RESULT:
KEPT IN COMMITTEE
206060: That the Commissioner of Public Works fix the street lamp on the traffic island
outside Brady Towers at 252 Medford Street.
RESULT:
WORK COMPLETED
206204: That the Commissioner of Public Works report on the feasibility of extending yard
waste pickup later in the season.
Mr. MacEachern told the committee that extending the period is difficult due to the existing contract with
Russell Disposal and that to do so would require approval from the BOA for the extension and added
cost. Mr. Koty pointed out that the current period is longer than it used to be and that the DPW yard is
also open for residents to use. Presently, pickup runs for 6 straight weeks (rather than alternating weeks)
starting on November 1st and ending during the 2nd week in December. Alderman Davis suggested
looking at the pickup data and possibly adjusting the weeks.
RESULT:
WORK COMPLETED
206303: That the Director of Engineering share how pedestrian detours are required for
planned street work resulting in sidewalk closures.
Mr. Raiche told the committee that all detours are approved by the city’s Traffic Engineer and Alderman
Davis stated that has no bearing on the reality of the situation. He has received numerous calls from
constituents, mostly from parents of school kids, complaining that sidewalks are being shut down for part
or whole days with signs posted indicating where to cross. He said that he is not satisfied that contractors
Public Utilities and Public Works Committee
Page 4 of 8
Printed 11/8/2018
are shutting sidewalks without providing adequate detours and/or details and he would like a more active
conversation on this subject. Ms. Connor commented that the VisionZero initiative might be helpful on
this matter.
RESULT:
KEPT IN COMMITTEE
206440: That the Director of SPCD provide this Board with a detailed report of current
contractual obligations regarding Beacon Street reconstruction, including costs incurred,
work still outstanding on the current contracts, and the implications of cancellation of the
outstanding contracts.
Items #205010, 205498, 206440, 206594, 206707 were discussed together.
RESULT:
WORK COMPLETED
206642: That the Commissioner of Public Works and Director of Parks and Recreation
explain how DPW develops maintenance plans, staffing, and budgets for new parks,
especially parks that have significant landscaped areas or new types of play equipment,
benches, or other features.
Mr. Koty told the members that a request for additional funds to maintain the parks will be submitted in
the next fiscal year’s budget. At that time, he will present 2 options - 1) keeping the work in-house and 2)
outsourcing the work. He noted that artificial surfaces need to be cleaned 3 times a week in order to
maintain the warranty and that there is contractual work that needs to be done by the contractor, not
by city employees.
RESULT:
WORK COMPLETED
206594: That the City Solicitor prepare a document for review by this Board's Committee
on Public Utilities and Public Works in preparation for filing a complaint regarding the
removal of trees along Beacon Street.
Items #205010, 205498, 206440, 206594, 206707 were discussed together.
RESULT:
WORK COMPLETED
206667: That the Director of Engineering inspect Russell Road at the corner of Ware Street
for repeated sink holes.
Mr. Raiche reported that the area in question was inspected with CCTV and he assured the committee that
the road’s subsurface is in decent enough condition as to not cause a sinkhole. Due to the limitations of
the CCTV equipment, the lateral drains were not checked. There was some typical trench settlement
noted on Ware Street along the line of the gas main. The city only has records of work performed on that
street since 2013, so most likely, the work was done prior to 2013. Mr. Raiche said that paving of the
road is feasible.
Chairman White asked if the work might have been defective and Mr. Raiche replied that there was spider
cracking in sidewalk, suggesting that the cap could have been better, however, there is no indication of a
‘smoking gun’. Chairman White asked Mr. Raiche to consult with the Law Department to determine if
the city has any legal options.
Public Utilities and Public Works Committee
Page 5 of 8
Printed 11/8/2018
RESULT:
WORK COMPLETED
206700: That the Commissioner of Public Works explain the city’s options for reducing the
number of unused utility lines connecting to properties.
Mr. MacEachern explained that these wires are cable company drops that are left when
occupants move. The cable companies leave them behind with the hope of using them for the
next occupant. The DPW has tried to get the cable companies to remove them and, in some
instances, the wires were removed by the city’s Lights and Lines Department. Mr. MacEachern
will forward some additional information to the committee on this matter.
RESULT:
WORK COMPLETED
206707: That the Administration endeavor to add a properly signed and signaled crosswalk
at 45 Beacon Street to enhance safety for residents accessing the Whole Foods Market.
Items #205010, 205498, 206440, 206594, 206707 were discussed together.
Alderman Scott commented that this is an active location and that all future changes should be
put through a state change order. He will submit a punch list of things remaining to be done and
Chairman White asked that the list be sent to the committee for follow-up. This item will remain
in committee until Alderman Scott is ready to discuss it again.
RESULT:
KEPT IN COMMITTEE
206741: That the Commissioner of Public Works report to this Board how a utility pole on
Belmont Street, behind St. Catherine's Church, came down on September 23, 2018.
Mr. MacEachern told the committee that the pole was knocked down by a delivery truck. The
city has billed Eversource for the manpower provided to deal with the aftermath of the accident.
The city had requested numerous times that the pole be replaced, to no avail, and Mr. Koty
submitted a letter to that effect for inclusion into the record. Mr. Koty also informed the
members that Eversource has assigned a representative to follow up on the city’s complaints.
Chairman White’s motion that the Commissioner of Public Works provide the committee with the
number of outstanding requests from the city to replace defective/dangerous utility poles, was
approved.
RESULT:
WORK COMPLETED
206742: That the Commissioner of Public Works report to this Board why a previous
Order, #205803, regarding a dangerously curved utility pole on Belmont Street, has not
been responded to.
RESULT:
WORK COMPLETED
206779: That the Director of Engineering or the Commissioner of Public Works share with
this Board the current process for coordinating street paving with underground utility
Public Utilities and Public Works Committee
Page 6 of 8
Printed 11/8/2018
repairs, including how it compares with the Worcester Cooperative Paving Program.
Mr. Raiche told the committee that National Grid and Eversource share their long-range plans
with the city on an annual basis in an effort to coordinate work on city streets/sidewalks with the
city. The City of Worcester has a different setup than Somerville’s, in that their Water
Department is separate from their Public Works Department. Additionally, if there are 2 or more
utilities working on a street at same time, everything gets done at once. Somerville is similar to
Cambridge, having weekly coordination with utility companies regarding projects. Mr. Raiche
noted that wherever the city is doing its work on its infrastructure, utilities have to do their work
at the same place and time. He went on to say that in an urban area such as Somerville, a local
ordinance would have more force.
RESULT:
WORK COMPLETED
206780: That the Administration work with other municipalities for the creation of a DPU
community advisory board, similar to the MWRA’s advisory board, to provide input on
the regulation of utilities.
Ms. Connor will discuss this item with Alderman Hirsch and Mr. Sellars-Garcia.
RESULT:
KEPT IN COMMITTEE
206781: That gas leaks be a regular topic on any standing meetings with Eversource or
National Grid.
Mr. Raiche told members that there are no standing meetings to address leaks and that the city know who
to call in the event of a gas leak.
RESULT:
KEPT IN COMMITTEE
206782: That the Director of SPCD, with the Director of Sustainability and Environment,
explain the feasibility of encouraging or requiring that areas of new utility infrastructure –
such as Boynton Yards or the Inner Belt – use sustainable forms of energy.
Mr. Sellars-Garcia reported that OSE and the Planning/Zoning Department have developed a
form to be used during a special permit review. This form will request information about
specific areas, e.g., energy efficiencies, as a project proceeds. The projects envisioned for
Boynton Yards are in the early stages and will go through this process. Chairman White asked that
the link to this form be provided to the BOA. Mr. Sellars-Garcia pointed out that the city can't
require a lot in the way of energy efficiencies, since the state building codes can’t be pre-empted.
RESULT:
WORK COMPLETED
206783: That the Administration and this Board support Bill H2683, “An Act relative to
protecting consumers of gas and electricity from paying for leaked and unaccounted for
gas.”
Mr. Connor will submit a joint resolution from the Mayor and the BOA.
Public Utilities and Public Works Committee
Page 7 of 8
Printed 11/8/2018
RESULT:
KEPT IN COMMITTEE
206826: That the Director of Engineering and/or the Commissioner of Public Works repair
the pedestrian and bicycle ramp under the railroad bridge on Sacramento Street, and
respond to this Board in writing before the next meeting of the Committee on Public
Utilities and Works.
Mr. Raiche reported that an assessment of the site has been performed and that the Administration is
pursuing grant funding to make the needed repairs and if no grants are awarded, a request for funds will
be made to BOA. Mr. Raiche will submit a report on this matter to the committee.
RESULT:
KEPT IN COMMITTEE
206836: That the Commissioner of Public Works and the City Engineer address before the
Committee on Public Utilities and Works what appears to be the failure of a contractor to
tie the local sewer line from Ten Hills Road into the Shore Drive main sewer pipe, which
was part of a major separation contract, and discuss measures that will be undertaken to
oversee future water and sewer projects.
Chairman White reported that a small depression appeared at this location and reappeared after
having been patched. While the street was opened, he observed pipes that were unconnected in
the ground. Mr. Raiche explained that the work performed by Federal Realty Investment Trust
(FRIT) in Ten Hills, (funded by the DIF) was allowed to be ‘self-performed’. An inspection of the
site determined that the lateral from the catch basin to a new pipe was properly made, but the old
pipe was incorrectly abandoned and went unnoticed for 7 years before causing problems. There was
not enough evidence to determine who was at fault. Mr. Raiche pointed out that currently, even
though the city has the authority to allow contractors to self-perform, it is not allowing it.
RESULT:
WORK COMPLETED
204944: 23 residents submitting a petition re: the trees removed on Beacon Street.
RESULT:
WORK COMPLETED
205406: Chris Dwan submitting comments re: the removal of trees from Beacon St.
RESULT:
WORK COMPLETED
206615: DPW Commissioner responding to various Board Orders submitted at the 6/14/18
meeting.
RESULT:
WORK COMPLETED
206616: DPW Commissioner responding to various Board Orders submitted at the 6/28/18
meeting.
Public Utilities and Public Works Committee
Page 8 of 8
Printed 11/8/2018
RESULT:
WORK COMPLETED
Handouts:
•
Case Details - Massachusetts Trial Court 3-1 (with 204486)
•
Superior Court - decision on motion for judgment on pleadings-1 (with 204486)
•
Ltr - BOA - 5-4-18 (with 205498)
•
Complaint - Draft - 10-25-18-1 (with 206594)
•
Draft Notice - 10-25-18 (with 206594)
•
Letter to Eversource (with 206741)