Appendix E - Inner Belt Brickbottom Plan — File 207344
SEPTEMBER 2015
GOODY CLANCY with
Carol R. Johnson Associates | Fay, Spofford & Thorndike
Kittleson Associates | Placematters | SYSTRA | W-ZHA
INNER BELT
BRICKBOTTOM PLAN
City of Somerville
Joseph A. Curtatone, Mayor
CONTENTS
1 EXECUTIVE SUMMARY....................................................2
2 CRITICAL QUESTIONS SHAPING....................................16
THE FUTURE OF INNER BELT AND BRICKBOTTOM
3 MASTER PLAN.............................................................50
Master Plan Framework...........................................................................................52
District Identity....................................................................................................52
Streets and Thoroughfares...................................................................................54
Public Places Network.........................................................................................58
Development Framework.....................................................................................62
Character Area Subdistricts......................................................................................64
Inner Belt............................................................................................................64
Inner Belt Gateway: Washington Street.............................................................66
Inner Belt Gateway: New Washington Street......................................................70
Inner Belt South..............................................................................................76
Roland/Inner Belt East7...................................................................................80
Brickbottom........................................................................................................84
Brickbottom/Joy & Chestnut............................................................................86
Brickbottom/McGrath Edge..............................................................................90
4 PUTTING THE PLAN TO WORK......................................94
APPENDIX (SUPPLEMENTARY VOLUME)
A. Abstracts of past circulation studies
B. Existing Circulation Conditions Analysis
C. Existing Circulation Conditions Technical Appendix
D. Walkability Audit
E. Urban Ring Corridor Shuttle Feasibility Analysis
F. Office and Research Market and Positioning Analysis
G. Not Used
H. Infrastructure Financing Approach Analysis
I. Build-out Alternatives
J. Street Sections
2 | INNER BELT BRICKBOTTOM PLAN
1 | EXECUTIVE SUMMARY
The Inner Belt/Brickbottom study area, seen in part in the lower half of this photo, is a strategic location
for mixed use development thanks to new transit connections to downtown Boston (top center) and
East Cambridge (center right).
EXECUTIVE SUMMARY | 3
T
he 140 acres of the Inner Belt/Brickbottom study area offer
Somerville a special—and essential—opportunity for economic
development at a transformative scale. As at Assembly Square
and Boynton Yards, inauguration of new rail transit service to Inner Belt
and Brickbottom is turning underutilized, partially forgotten industrial land
into fertile ground for new jobs, businesses, homes, services, parks and
cultural destinations that will drive prosperity in Somerville for decades
to come. Constrained for years by limited access and visibility, Inner Belt
and Brickbottom are quickly becoming a regionally significant workplace
center as well as a center of community for Somerville.
The following pages provide an overview of the Inner Belt Brickbottom
Plan through these components:
• Community-based vision
• Economic development potential
• Integrated transportation and development approach
• Distinctive districts
• Public places network
• Inner Belt/Brickbottom illustrated vision
• Development framework
See later chapters on Critical Questions, Master Plan and Putting the
Plan to Work for more detail on the plan
4 | INNER BELT BRICKBOTTOM PLAN
Create great places for people
Inner Belt and Brickbottom lack strong identity today, owing to their isolation, internal
obstacles and impersonal nature of much development. Enhance market position and
sense of community by using all new investments in buildings, streets and other public
spaces to create people-centered places.
Connect neighborhood to neighborhood
Physical barriers limit access to/from and awareness of Inner Belt and Brickbottom.
Complement new Green Line service with critical walking, transit, biking and driving
connections to make the study area a major regional destination for working, living and
playing.
Grow the economy
Green Line service offers transformative opportunities for Inner Belt/Brickbottom—if
the streets, buildings and land uses around Washington Station create a safe, inviting
walking environment. The greater the quality of walkable streets and transit access in the
area, the greater the extent of job and business growth it will foster.
Coordinate public and private investment
Market-driven private investment is the most important vehicle for economic develop
ment in the study area and Somerville overall. Invite investment through clear, predict
able development approval standards that maximize value potential throughout the
study area.
Deliver ongoing value with sustainable development
approaches
To ensure Inner Belt and Brickbottom support economic and community development
in Somerville for decades to come, invest in infrastructure, real estate and businesses in
ways that simultaneously build sustainable value in three key areas: the economy, social
community, and the natural environment.
Five value principles, informed by community engagement during the Inner Belt/Brickbottom
planning process, should guide development of buildings, infrastructure and public spaces in
the study area.
CORE VALUES OF THIS PLAN
EXECUTIVE SUMMARY | 5
WALKSHOP | June 2011
Collaborative observation of the study area and identification of opportunities, challenges, and priorities.
VISION WORKSHOP | October 2011
Building vision alternatives together using maps; blocks representing market-driven development, streets and
parks; and images showing possible models to follow.
The planning process invited dialogue on the future for Inner Belt and Brickbottom through
a public “walkshop,” public vision workshop, and a two-year series of public focus group
meetings including key community, business and government agency stakeholders.
COMMUNITY ENGAGEMENT
6 | INNER BELT BRICKBOTTOM PLAN
Market position: distinguished by access
and development choices unparalleled in
the Boston region
Access choices
• Multiple transit corridors with access to skilled work
force, Kendall, Boston
• Safe, inviting pedestrian network connected to
neighborhoods, Union Square
• Unique off-street biking and recreation network
• Excellent road access
Development choices
• Multiple large parcels, and opportunities to further
aggregate large parcels, offering flexible program,
building, street and amenity configurations
• Substantial opportunity for building heights from 5 to
20 or more stories in many locations—adding signifi
cant development capacity, views, and visibility
• Multiple parcels with opportunity for large floorplates
of 50,000sf or more, serving certain office and fabri
cation program needs
• Choice of working within established address/identi
ty contexts in parts of Brickbottom and the Washing
ton Street corridor, or defining new address/identity
environment
Priority assets to leverage for near-term de
velopment
• New Green Line service at Washington Street; exist
ing Orange Line service at Sullivan Square
• Established character, address and mixed-use con
text in Brickbottom and along Washington Street
• Lower land cost than competing areas
• Opportunity for smaller office/research buildings
between 50,000sf and 100,000sf
• Established life sciences presence on Roland Street
• Established housing market potential
Priority assets to leverage for longer-term
development
• Large, flexible sites to accommodate spillover devel
opment as Kendall Square and North Point develop
ment opportunities diminish
• Direct connections to downtown Boston and Cam
bridge office and research centers support comple
mentary general office and research space develop
ment
• Potential for large buildings, 200,000sf or more
• Urban Ring transit corridor connections
• New, prominent address identity of grade-level Mc
Grath boulevard
Inner Belt/Brickbottom Program Summary
• 5.5 to 10 million sf overall
• 60% office/research/fabrication, 37% housing, 3%
retail
Inner Belt North:
45%
Inner Belt South:
36%
Brickbottom:
19%
2020
OPPORTUNITY
2035
OPPORTUNITY
SOMERVISION
2030 GOAL
MAPC 2035
PROJECTIONS
—IBBB
MAPC 2035
PROJECTIONS
—CITYWIDE
Office and
Research &
Development
Space
250,000sf
3,250,000sf
Retail Space
45,000sf
165,000sf
New Jobs
900
10,250
10,000-
11,000
4,879
15,130
New Housing
Units
360
2,250
2,000-
2,500
838
5,869
New
Residents
540
3,400
1,050
6,129
Market-driven opportunity for business and real estate development sets the foundation for
the Inner Belt/Brickbottom Plan—informing decisions around land use mix, infrastructure
priorities, urban design and other critical plan elements.
ECONOMIC DEVELOPMENT POTENTIAL
Approximate share of
new development floor
space in the study area.
EXECUTIVE SUMMARY | 7
Travel Demand Management
Make the most of assets
• Leverage new Green Line station and Urban Ring
transit corridor
• Emphasize transit, walkability, and great bike infra
structure
A practical approach
• Minimize expense of mitigating existing barriers to
circulation
• Implementing TDM strategies can cost relatively little
for comparable benefits in many cases
• Minimizing new traffic helps:
• Promote livability within and around IBBB
• Preserve vehicle capacity so IBBB can continue to
benefit from convenient access to I-93 and other
regional roads for trips that must remain vehicular
(i.e. trucks)
Build infrastructure
Financial incentives
Communicate options
Coordinate travel activity
Provide flexibility
Reduce parking supply
Increase parking cost
TRANSPORTATION
DEMAND
MANAGEMENT
TRAVEL DEMAND
TRANSPORTATION
SUPPLY
LAND USE
EMPLOYER-BASED
DEVELOPMENT-BASED
PARKING MANAGEMENT
High-value, mixed use development potential will benefit from first class walking, transit and
bike access that reduces need for costly roadway improvements.
INTEGRATED TRANSPORTATION
AND DEVELOPMENT APPROACH
8 | INNER BELT BRICKBOTTOM PLAN
Public realm
• Sidewalks: generous scale, buff
ered from traffic by parking and/or
plantings
• Plantings: canopy street trees
framing boulevard greenway; com
pact ornamental front yards
Built form
• Height range: 4–12 stories
• Greater height possible as land
marks and to leverage visibility,
value. More refined, larger scale
version of Joy/Chestnut/Linwood
character
Public realm
• Sidewalks: compact; accommodating art, dining, periodic events;
shared pedestrian/vehicle spaces
• Plantings: intermittent street trees supplemented by planters, green
walls
Built form
• Height range: 4 – 6 stories
• Character: industrial , significant transparency; smaller building scale,
larger window scale
BRICKBOTTOM: JOY/CHESTNUT/LINWOOD
BRICKBOTTOM: MCGRATH EDGE
INNER BELT GATEWAY: WASHINGTON
T
5
mi
nu
te
w
al
k
fr
o
m
U
ni
o
n
Sq
.
S
ta
ti
on
5
mi
n
ut
e
w
alk
fr
om
W
as
hi
n
gt
on
S
ta
ti
on
BRICKBOTTOM:
MCGRATH EDGE
BRICKBOTTOM:
JOY/CHESTNUT/
LINWOOD
EAST
SOMERVILLE
UNION
SQUARE
INNER BELT
GATEWAY: NEW
WASHINGTON
DISTINCTIVE DISTRICTS THAT BUILD MARKET POSITION
AND COMMUNITY CHARACTER
Commonwealth Ave—Boston, MA
Waterside Blvd—Norfolk, VA
Memphis, TN
Seattle, WA
Southtown—San Antonio, TX
Public realm
• Sidewalks: accommodating mixed residential and
retail with planted & paves setbacks; buffered
from traffic by parking, trees
• Plantings: Canopy trees marking Somerville gate
way and mitigating scale transition across street
Built form
• Height range: 4–12 stories
• Transitioning to East Somerville neighborhood
scale through height step-backs, facade articula
tion
Pearl District—Portland, OR
INNER BELT GATEWAY:
WASHINGTON
EXECUTIVE SUMMARY | 9
Public realm
• Sidewalks: moderate
width; accommodate
mixed office, housing,
occasional retail frontage
• Plantings: trees, planters;
extend scale of park spac
es and greenways; buffer
rail infrastructure
Built form
• Height range: 4–20+ sto
ries
• Significant height, trans
parency to leverage views;
large floorplates possible if
ped scale retained
Public realm
• Sidewalks: generous width, tied
into park landscape; accommodate
mixed office, retail, housing frontage
• Plantings: canopy trees, lawn, orna
mental plantings
Built form
• Height range: 4–20 stories
• Significant transparency; mix of
materials—traditional and modern,
dark and light
Gastown—Vancouver, BC
University Park—Cambridge, MA
South Lake Union—Seattle, WA
INNER BELT SOUTH
Public realm
• Sidewalks: generous on Inner
Belt & New Washington, com
pact on Roland, Third
• Plantings: canopy trees, tree
lawns, planters, green roofs;
buffer rail infrastructure
Built form
• Height range: 4–20 stories
• Complement industrial char
acter of Roland buildings,
transition to modern face on
Inner Belt; opportunity for large
floorplates, retaining pedestrian
scale along Inner Belt; signifi
cant transparency, height
ROLAND/INNER BELT EAST
INNER BELT GATEWAY: NEW WASHINGTON
5
mi
nu
te
wa
lk
fr
om
S
ull
iva
n
Sq
. S
ta
tio
n
5
mi
nu
te
w
al
k f
ro
m
s
ug
ge
s
te
d
U
rb
a
n
Ri
n
g
St
at
io
n
SULLIVAN
SQUARE
CHARLESTOWN
INNER BELT
SOUTH
5
m
in
ut
e
w
al
k
fr
om
s
ug
ge
st
ed
Ur
ba
n
Ri
n
g
St
at
io
n
T
T
ROLAND/INNER
BELT EAST
South Lake Union—Seattle, WA
Georgetown—Washington DC
Pentagon Row—Arlington, VA
The Inner Belt and Brickbottom portions of the study area each possess unique characteristics that will
influence private and public investment in them. The two areas are further distinguished by emerging
subdistricts with unique sense of place, shaping and shaped by unique market position and community culture.
10 | INNER BELT BRICKBOTTOM PLAN
DISTINCTIVE DESIGN THEMES
FOR PARKS AND STREETS
Inner Belt
• Larger scale
• Stone, metal, concrete,
refined
• Distinctive, contemporary
• Dedicated activity spaces
Brickbottom
• Smaller scale
• Brick, metal, concrete,
rugged
• Dynamic, creative
• Overlapping activity
spaces
6 | JOY ST.
6
4
1
5
STREETSCAPE,
WALKING AND BIKING
IMPROVEMENTS
LINKING BRICKBOTTOM
TO GREEN LINE
DUAL USE OF PARKING/
LOADING AREA FOR
OCCASIONAL PUBLIC/
ARTS EVENTS
INFILL: MIX OF OFFICE,
ARTS, HOUSING, LIGHT
INDUSTRY
NIGHT TIME
ACTIVITY
A PUBLIC PLACES NETWORK CREATING DESTINATIONS
FOR ALL OF SOMERVILLE—AND THE REGION
EXECUTIVE SUMMARY | 11
2 | NEW WASHINGTON PARK
3 | INNER BELT SOUTH
4 | COMMUNITY PATH AT WASHINGTON STATION
5 | WASHINGTON ST. WEST SIDE
3
2
1 | WASHINGTON ST. EAST SIDE
PUBLIC SPACE
AMENITY SERVING
WORKERS,
RESIDENTS,
VISITORS
FLEXIBILITY FOR
SIGNIFICANT
BUILDING
HEIGHT AND
FLOORPLATES—
DESIGNED TO
HUMAN SCALE
HIGH-VALUE
COMMERCIAL
AND HOUSING
DEVELOPMENT
NEW
CONNECTIONS
TO WASHINGTON
STATION,
BRICKBOTTOM
PARK,
COMMUNITY PATH
CONNECTIONS
CREATING
DISTINCT SENSE
OF PLACE
HOUSING
PUBLIC
SIDEWALKS &
PLAZAS WITH
ENGAGING
BUILDING USES,
ART, DESIGN
EXPANDED,
IMPROVED
WALKING
NETWORK
EARLY STAGE
SMALL-OFFICE
& RETAIL
DEVELOPMENT
EXPANDED,
IMPROVED
WALKING AND
BIKING NETWORK
STATION
INTEGRATED
WITH BUILDING
DESIGN
MIXED OFFICE
AND HOUSING
WITH GROUND
FLOOR RETAIL
A variety of parks, streets and pathways designed for people introduce activity and identity where
lacking today. This supports a vibrant live/work/play environment that attracts new jobs and
development, and forms a new center of community within Somerville.
12 | INNER BELT BRICKBOTTOM PLAN
Flo
Medford St.
McGrath Blvd.
Joy St.
Poplar St.
Chestnut St.
Franklin Ave.
Franklin St.
Linwood St.
Station Square
New Washington Common
COMMUNITY PATH
INTO SOMERVILLE
McGrath Greenway
Poplar Greenway
Brickbottom Square
George Dilboy Square
UnionSquare
EXISTING BUILDINGS
ASSUMED TO REMAIN
POTENTIAL NEW OFFICE/
RESEARCH/DEVELOPMENT
POTENTIAL
NEW HOUSING
INNER BELT/BRICKBOTTOM VISION
New
W
as
hi
n
g
t
on St.
EXECUTIVE SUMMARY | 13
Washington St.
Inner Belt Rd.
Florence St.
Mt. Vernon St.
3rd Ave.
COMMUNITY PATH
TO CHARLES RIVER
DOG PARK
Southview Common
Skyline Park
North Point
SullivanSquare
Charlestown
A conceptual scenario of potential new real estate development, supportive street, park and transit
infrastructure, and the places they create together.
14 | INNER BELT BRICKBOTTOM PLAN
VIEW CORRIDORS
EFFICIENT SHARED-USE
PARKING
STREET NETWORK
PUTTING THE PLAN TO WORK:
DEVELOPMENT FRAMEWORK
EXECUTIVE SUMMARY | 15
DEVELOPMENT CODE STRATEGIES
• Addressing building and site development/
rehabilitation as well as its integration with
improved and new street corridors
• Brickbottom: Form-based
> Addresses smaller and more complex
existing parcel boundaries, ownership
> Promotes as-of-right opportunity
• Inner Belt: Master plan
> Addresses larger scale sites with greater
flexibility
> Design review required
• 5.5 to 10 million sf overall
• 60% office/research/fabrication, 37% hous
ing, 3% retail
DEVELOPMENT INTENSITY
LAND USE SCENARIO
• Office and research/development
welcome anywhere in study area
• Housing welcome west of Inner Belt
Road
• Retail welcome anywhere, but should
be prioritized in clusters indicated
• Large-floorplate buildings (over about
30,000sf) and fabrication uses wel
come in areas indicated
A guide to land and infrastructure development that adds predictability and value while retaining
the flexibility to accommodate various market-driven investment opportunities, creative design
approaches and public open space goals as Inner Belt and Brickbottom mature.
16 | INNER BELT BRICKBOTTOM PLAN
What changes in Inner Belt and Brickbottom will be most effective in achieving community goals?
2 | CRITICAL QUESTIONS
SHAPING THE FUTURE OF
INNER BELT AND BRICKBOTTOM
CRITICAL QUESTIONS SHAPING THE FUTURE | 17
T
his planning process for Inner Belt and
Brickbottom examined a comprehensive
set of critical questions whose answers
provided fundamental guidance to the plan.
The questions address issues of market-driven
investment potential, priority infrastructure
improvements, and implementation mechanisms
that had to be considered together to determine
the most appropriate plan approaches—those
that are both transformative in their vision,
and practical in their application. This chapter
begins with background information on
public engagement and study area data, then
summarizes findings to a series of twelve critical
questions.
BACKGROUND
• The Inner Belt/Brickbottom Plan public
process
• Inner Belt and Brickbottom Today: critical
figures
CRITICAL QUESTIONS
1. How does Somerville’s strategic
plan guide change in Inner Belt and
Brickbottom?
2. What is the regional outlook for
smart growth in Greater Boston?
3. What recent investments have been
made in Inner Belt/Brickbottom?
4. How can we most effectively
harness the study area’s economic
development potential?
5. What access improvements would
do the most to unlock opportunity in
the study area?
6. How can we fund needed
infrastructure improvements using
the value of new development?
7. What will new Green Line service
bring—and when?
8. How will the Green Line station at
Brickbottom work?
9. When will McGrath Highway be
rebuilt as an at-grade roadway
connecting neighborhoods?
10. Will congested roads threaten our
smart growth goals?
11. Will stormwater drainage threaten
growth in Inner Belt & Brickbottom?
12. What constraints do “The Tubes”
impose?
13. How can zoning reform work for
Inner Belt and Brickbottom?
18 | INNER BELT BRICKBOTTOM PLAN
PUBLIC PROCESS
GROUNDING MCGRATH
INNER BELT / BRICKBOTTOM PLAN
MBTA GREEN LINE
2011
J
M
S
M
J
N
F
J
O
A
A
D
FOCUS GROUP | MAY 16, 2011
FOCUS GROUP | SEPTEMBER 21, 2011
FOCUS GROUP | NOVEMBER 9, 2011
PUBLIC MEETING #1 | JUNE 25, 2011
PUBLIC MEETING #2 | OCTOBER 5, 2011
FOCUS GROUP | AUGUST 4, 2011
SEPTEMBER 20, 2011
JUNE 29, 2011
AUGUST 3, 2011
JUNE 29, 2011
MAY 26, 2011
SEPTEMBER 15, 2011
JUNE 23, 2011
AUGUST 25, 2011
2012
J
M
S
M
J
N
F
J
O
A
A
D
FOCUS GROUP | JUNE 29, 2012
MARCH 7, 2012
DECEMBER 12, 2011
NOVEMBER 15, 2012
FEBRUARY 8, 2012
DECEMBER 11, 2012
2013
J
M
S
M
J
N
F
J
O
A
A
D
FOCUS GROUP | MAY 15, 2013
FOCUS GROUP | OCTOBER 24, 2013
PUBLIC MEETING #3 | DECEMBER 16, 2013
MAY 15, 2013
FEBRUARY 13, 2013
APRIL 25, 2013
JUNE 11, 2013
OCTOBER 3, 2013
FINAL PLAN OPEN HOUSE
VISION WORKSHOP
WALKSHOP
CRITICAL QUESTIONS SHAPING THE FUTURE | 19
Community conversation on priorities for the Inner Belt
and Brickbottom study area was an important founda
tion of the planning process. The conversation occurred
in two major types of forums. Focus Group meetings
engaged a selected group of stakeholders to discuss
planning questions and concepts in detail. These
stakeholders included property and business owners,
residents, other Somerville community members, and
planning staff from Boston and Cambridge, which
directly adjoin the study area. Focus Group meetings
also welcomed attendance by the general public. Public
meetings expressly invited the broader Somerville com
munity and included significant participation by Focus
Group members.
20 | INNER BELT BRICKBOTTOM PLAN
INNER BELT & BRICKBOTTOM TODAY
Figures and images below highlight important data and conditions that inform the critical questions
on the following pages.
Competitive life sciences development areas
CLUSTER
PROXIMITY
EASE OF DEVELOPMENT
ACCESS AMENITIES
OTHER CONSIDERATIONS
SUM: DEVELOPER
CONFIDENCE
Kendall Area (A+)
Best
Redevelopment
Red Line station
Best location; highest rent
Highest
North Point (A)
Adjacent
Ready
Green Line station
Can accommodate large-scale
development
Very good/future
Central Square/
Osborn Triangle
(A)
Adjacent
Redevelopment
Red Line station
Parts of University Park
already closer to Central than
Kendall
Very good/future
Harvard/Allston
(A-)
Potential new
cluster location
Land assembled
No MBTA
Harvard University as anchor
investor and tenant
Potentially
excellent
Seaport/Innovation
District (B+)
No
Ready; ample
underdeveloped land
Silver Line
Waterfront; proximity to
downtown Boston and airport
Moderate
Alewife (B)
No
Redevelopment
Red Line station; not
pedestrian-friendly
Suburban environment w/o
suburban advantages
Moderate
Assembly Row (B)
No
Needs infrastructure;
ample underdeveloped
land
Future Orange Line
station
Planned environment will add
amenity
Moderate
Inner Belt/
Brickbottom (B)
No
Redevelopment/
portions need
infrastructure
Future Green Line
station
Very good access to I-93; two
T stops
Moderate
Inner Belt/Brickbottom has two to three times the development capacity of peer locations—
and high potential to leverage research cluster proximity
POTENTIAL NEW OFFICE/LAB SPACE CAPACITY
Alewife (B)
1,800,000 SF
Central Square/
Osborn Triangle (A)
1,750,000 SF
Harvard/Allston (A-)
1,500,000 SF
Assembly Row (B)
1,750,000 SF
Sub-Market (Location Rating)
Planned/Projected Space
Inner Belt/Brickbottom (B)
5,000,000+ SF
North Point (A)
2,000,000 SF
Kendall Square (A+)
2,600,000 SF
Seaport/Innovation
District (B+)
2,100,000 SF
CRITICAL QUESTIONS SHAPING THE FUTURE | 21
VEHICULAR TRAFFIC
CARS / DAY
Interstate 93
250,000
McGrath Highway
33,000
Washington Street
23,000
Inner Belt Road
6,000
Joy Street
2,100
New Washington
Street
2,000
Linwood Street
1,300
BUS RIDERSHIP
RIDERS / DAY
All routes
3,200
Route 80
590
Route 86
600
Route 87
432
Route 88
630
Route 90
220
Route 91
445
Route CT-2
260
PROPERTY IMPROVEMENTS
$
Total 2004–2013
51 million
2004
0.9 million
2005
6.5 million
2006
3.5 million
2007
26.3 million
2008
1.3 million
2009
6.2 million
2010
8.2 million
2011
0.1 million
2012
2.0 million
2013
0.1 million
TAX LEVY
$ / YEAR
Personal
property
6.2 million
Real property
2.5 million
LAND AREA
ACRES
Study area
195
Rail right-of way
43
Boston Engine
Terminal
23
Interstate 93
7
NSTAR Land
6
Other MBTA land
3
Approximate land area
available for redevel
opment or reuse
100
BUILT SPACE
SQ. FT.
Warehouse / garage
1,000,000
Office
600,000
Residential
200,000
Hotel
125,000
OTHER SPACE
ACRES
Parking lots
32
Civic space
2
HOUSING
UNITS
Total units
368
Affordable units
223
EMPLOYMENT
JOBS
Total jobs
1,500
WALK
SCORE
TRANSIT
SCORE
Inner Belt Brickbottom
85
54
Davis Square
97
71
City Averages
85
55
Regional transportation and development projections assume a
modest shift toward walking, transit, and biking in the study area.
AM PEAK
MODE SHARE AT TRIP DESTINATION
PM PEAK
2009
2035
83.2%
75.0%
73.6%
61.7%
7.7%
13.0%
13.8%
+57%
+53%
-12%
-18%
18.1%
9.1%
12.0%
12.6%
20.2%
22 | INNER BELT BRICKBOTTOM PLAN
How does Somerville’s strategic
plan guide change in Inner Belt and
Brickbottom?
Recognizing the transformational impact that Somer
ville’s six new Green Line stations would have on their
neighborhoods, and on the City as a whole, Mayor
Joe Curtatone took an unprecedented step in 2008—
he asked community members to prepare the city’s
first-ever Comprehensive Plan to guide growth and
development. A four-year public process ensued, and in
2012 the City’s Board of Aldermen and Planning Board
adopted the SomerVision Comprehensive Plan as the
official master plan for Somerville under Massachusetts
General Law.
SomerVision is a community-based plan intended to
ensure that Somerville remains a great place to live,
work, play and raise a family. Existing trends suggest
that absent a strategic plan, regional economic de
velopment will once again leapfrog Somerville, while
extreme housing demand will fundamentally erode our
character as an accessible, mixed-income community.
Somerville residents articulated a series of core values
during the planning process, advocating for a vibrant
and diversified economy, a range of choices in the
housing market, environmental stewardship, accessi
ble urban streetscapes, and innovation in government.
Next, a Steering Committee of sixty residents was
formed, representing every neighborhood of the City
and every public agency or advocacy organization op
erating in Somerville. This group worked for more than
two years to prepare an overall public policy framework
for the City, addressing topics from infrastructure plan
ning to public education to the small business environ
ment.
By the end of the process, the Steering Committee had
listed nearly 600 goals, policies and actions. Partici
pants recognized the need to telescope out to a bigger
picture, so their final element of work became the
SomerVision Numbers, a series of aspirational targets
for land use and development that would be essential
in order to meet the more detailed goals. The SomerVi
sion Numbers call for roughly 18 million square feet of
new development over the next two decades, with the
vast majority in places like Inner Belt and Brickbottom,
where infrastructure can support it and economies of
scale can allow private property owners to make a busi
ness case for smart growth while helping underwrite
the costs of public benefits like new open space and
affordable housing.
CRITICAL QUESTION 1
30,000 new jobs as part of a reasonable plan to create
opportunity for all Somerville workers and entrepreneurs.
125 new acres of publicly-accessible open space as part of our realistic
plan to provide high-quality and well-programmed community spaces.
6,000 new housing units—1,200 permanently affordable as part
of a sensitive plan to attract and retain Somerville’s best asset: its people.
50% of new trips via transit, bike, or walking as part of an
equitable plan for access and circulation to and through the City.
85% of new development in transformative area as part of
a predictable land use plan that protects neighborhood character.
CRITICAL QUESTIONS SHAPING THE FUTURE | 23
PUBLIC VISIONING
The four-year public process around
SomerVision brought hundreds of resi
dents, businesspersons and community
leaders together, including numerous
stakeholders from the Inner Belt and
Brickbottom districts. An early step in the
process was to understand what core
values the community. The “Word Cloud”
illustrates terms that community members
used most frequently during the visioning
process.
SOMERVISION MAP
SomerVision is both a preservation plan
and a growth plan. Residents want to steer
market energy away from traditional neigh
borhoods of two- and three-family homes
and into existing commercial squares and
transitioning industrial districts like Inner
Belt and Brickbottom. Roughly 365 acres
of industrial land exist on Somerville’s
eastern and southern edges: plenty of
space for new growth that is designed at a
human scale and integrated into the City’s
fabric of great neighborhoods.
A LEGALLY-ADOPTED PLAN
Comprehensive Plans (known as Master
Plans in some states) are a best practice
in public administration. When communi
ty members agree on a shared vision for
the future, it can become easier to build
consensus on policies and projects that
implement the vision. Somerville is a leader
in municipal management, and in 2012 the
City formally adopted its first-ever Com
prehensive Plan for the future.
24 | INNER BELT BRICKBOTTOM PLAN
What is the regional outlook for smart
growth in Greater Boston?
The Boston region gets smart growth. In 2008, after five
years of public dialogue, the Metropolitan Area Planning
Council and its 101 member municipalities adopted
a long-range strategic plan for the region’s future.
The MetroFuture Plan is an organizing framework to
keep greater Boston livable, healthy and economically
competitive. It calls for roughly 300,000 new jobs and
350,000 new housing units to be created by 2030, with
the vast majority being built in urban core communities
and walkable regional centers well-served by public
transportation. We all know that snarled roadways
undermine our quality of life as well as new economic
development efforts, and our regional plan offers us a
viable alternative.
At the local level, municipal governments in our region
are creating plans that are in line with the regional vision
for walkable smart growth. Every community has its
own specific needs and opportunities, but neighboring
municipalities are increasingly learning that coordi
nated plans produce better results. For example, the
City of Boston and the City of Somerville have used
an integrated approach to match up Boston’s plans
for Sullivan Square and Somerville’s plans for the Inner
Belt. And the City of Cambridge has partnered with
Somerville to guide the 45-acre NorthPoint develop
ment project, which straddles the municipal boundary
and is currently under construction.
In our era of limited resources, it is essential that local
governments continue to collaborate, so that public
and private investments reinforce each other. It is also
essential that our investments are prioritized around
walking, bicycling and mass transit. Federal and state
funding are being allocated in a competitive environ
ment, and communities that can’t demonstrate a com
mitment to walkability and to regional coordination are
losing out. For example, in 2010 and 2011, the federal
Partnership for Sustainable Communities awarded ma
jor discretionary planning grants to the City of Boston
($2 million), the City of Somerville ($2 million) and the
Metropolitan Area Planning Council ($4 million) because
of proven track records in creating new job and housing
opportunities using transit-oriented development.
The Boston region has been a bright spot in United
States’ economic recovery from the Great Recession of
2008, in part because our great neighborhoods attract
skilled workers from all over the country and all over the
globe. We must build on this progress and continue to
position our region as a national leader in smart growth.
Lab /
Research
Office
Multifamily
Housing
14 million sq. ft.
4 million sq. ft.
36 million sq. ft.
MIDDLESEX COUNTY / NEAR NORTH
DEMAND 2010–2030
CRITICAL QUESTION 2
CRITICAL QUESTIONS SHAPING THE FUTURE | 25
NORTH POINT
A large-scale mixed-use district is being
built along the Cambridge-Somerville bor
der adjacent to the Lechmere Green Line
station. Collaborative planning and zoning
efforts between the two cities have helped
streamline development totaling roughly
5 million square feet. Upon completion,
roughly half of the new space will be com
mercial and half will be residential. Major
open space amenities are included in the
development plans.
ASSEMBLY SQUARE
Fifteen years in the making, a great new
Somerville neighborhood is under con
struction on the shoreline of the Mystic
River. Assembly Square is a 125-acre for
mer industrial district, isolated by elevated
freeways and railroads. Roughly 3 million
square feet of commercial development
and 2 million square feet of residential
development are being built, along with a
new MBTA Orange Line subway stop that
will open in 2014.
A MARKET FOR WALKABILITY
Transitioning industrial areas in Charles
town, East Cambridge and eastern Somer
ville are helping meet market demand for
new walkable, transit-oriented develop
ment. Assembly Square and North Point
are under construction, providing clear
evidence that smart growth and walk
ability are viable investments north of the
traditional downtown real estate market.
Inner Belt, Brickbottom, Union Square and
Sullivan Square stand to benefit next.
26 | INNER BELT BRICKBOTTOM PLAN
More than
$50 million
in permitted
construction has
been invested in the
past ten years.
What recent investments have been
made in Inner Belt / Brickbottom?
The Inner Belt and Brickbot
tom districts are home to
400 residents, 100 em
ployers, and 750 workers.
The low density of these
districts and their unfriendly
pedestrian environment
hide a healthy business
climate that features low vacancy rates and four of the
ten largest taxpaying parcels in Somerville.
Important public and private investments have been
made in recent years. Since 2008, tens of millions of
dollars have been spent on new civic spaces, resur
faced roadways, gateway signage, facade improve
ments, and major property acquisitions. Businesses
have expanded, and the area’s first transit-oriented
development project has been permitted. These invest
ments should be celebrated, and should inform phasing
of the Master Plan’s implementation activities.
A. Holiday Inn Bunker Hill repositioning
B. Inner Belt Gateway Sign
C. Triumvirate Environmental expansion and headquar
ters acquisition
D. 150-200 Inner Belt Road sale and repositioning
E. Joy Street Studios facade improvement and reposi
tioning
F. Grossman Marketing corporate headquarters expan
sion
G. 90 Washington Street mixed-use redevelopment
permitting
1. Zero New Washington off-leash recreation area con
struction
2. Washington Street resurfacing (American Recovery
and Reinvestment Act)
3 Waste Transfer Facility demolition
CRITICAL QUESTION 3
A
B
C
D
E
F
G
1
2
3
CRITICAL QUESTIONS SHAPING THE FUTURE | 27
GATEWAYS
Clear signs of public and private invest
ment are visible from the corner of Inner
Belt Road and New Washington Street.
The Bunker Hill Holiday Inn completed
major facility upgrades in 2013. The City of
Somerville completed the Zero New Wash
ington Street dog park in 2009. Gateway
signage was designed and financed in a
collaboration between private landowners
and business owners, with assistance from
the City.
BUSINESS EXPANSION
Many growing businesses in the district
straddle the line between older economic
models like warehousing, and new econo
my sectors like green technology and digi
tal marketing. Triumvirate Environmental is
a national leader in environmental engi
neering, and in 2012 bought a building on
Inner Belt Road to serve as an expanded
headquarters facility. Grossman Marketing
is a fourth-generation family business on
Cobble Hill Road that expanded employ
ment from ____ to ____ in 2013.
WASTE TRANSFER FACILITY
Brickbottom’s Waste Transfer Facility has
presented an unwelcoming front door
for Somerville for sixty years. The two-
acre City-owned property was leased by
a private waste hauler, and hundreds of
diesel trucks entered the site each day. In
2013, the City of Somerville demolished
the hulking facility, sending a clear signal
to neighbors and potential investors that
Brickbottom is ready for higher-value
investment.
28 | INNER BELT BRICKBOTTOM PLAN
How can we most effectively harness
the study area’s economic development
potential?
MARKET POTENTIAL AND POSITIONING;
DEVELOPMENT ECONOMICS
SomerVision identifies economic development as a top
priority for the Inner Belt and Brickbottom study area. It
calls for adding more than 10,000 jobs in the study area
by 2030. It also calls for adding more than 2,000 hous
ing units in the study area, recognizing that housing
helps attract business investment by supporting qual
ities businesses seek like presence of retail and active
sidewalks. Through the guidance of this master plan,
the study area can accommodate all of this and more,
with flexibility to suit a variety of scenarios for mix and
sequencing of different land uses. In all cases, it is rec
ommended and assumed that at least 55% of building
floor area be devoted to office, research & development
and/or other employment-intensive uses.
What is the market potential for office and
research and development in Inner Belt and
Brickbottom?
W-ZHA completed a market analysis for the study area
by W-ZHA in 2011.
Key findings for office-related industry sectors:
• Principal industry sectors potentially interested in
locating in the study area include
> Information
> Financial Activities
> Professional, scientific and Technical
> Management of Companies and Enterprises.
• Office buildings in urban locations in and around
Boston have demonstrated lower vacancy and high
er rents than suburban locations between 2001 and
2011. Inner Belt and Brickbottom can leverage the
anticipated continuation of this trend.
• Principal location characteristics sought by busi
nesses in these industry sectors include
> Multiple modes of access for workforce and
clients
> Area with positive image to assist marketing and
recruiting
> Services and amenities available
> Location near other office businesses
> Reasonable price
Key findings for research and development:
• Demand for research and development space in
Middlesex County has been growing 5% annually
and is expected to continue
• Kendall Square has limited capacity left (roughly 3
million square feet in the pipeline, roughly 3 million
square feet more in potential largely dependent on
Federally-owned Volpe site redevelopment)—and
high rents. This will increase demand for additional
research space conveniently accessible to Kendall
Square, within approximately 5-10 years.
• Principal location characteristics sought by research
and development businesses include—in addition
to those listed above for office—the following:
> Skilled workforce available
> Presence of industry prestige/culture
> Ready ability to lease or build lab/research space
> Partnership opportunities with other businesses,
institutions
> Nearby institutions with research funding potential
CRITICAL QUESTION 4
CRITICAL QUESTIONS SHAPING THE FUTURE | 29
How should we position Inner Belt and
Brickbottom to be as competitive as possi
ble against peer locations?
The adjacent table summarizing strengths of Inner Belt
and Brickbottom against strengths of the principal
locations it will compete against for business and real
estate development. As the Inner Belt and Brickbottom
area is just emerging as a center for high-value office
and research and development activities, it has distinct
near-term and long-term market positions.
The study area’s major assets include:
• Highly educated workforce residing in Somerville
and adjacent cities
• Green Line service (coming soon enough to be
a tangible benefit to prospective businesses, as
demonstrated by this master plan)
• Orange Line service (for northeast portion of study
area)
• Large parcels potentially available for redevelopment
with potential for large building area and/or floor
plates (over 30,000sf)
• Large overall development potential (5 to 10 million
square feet of building floor area)
• Excellent fiber optic/internet capacity
• Established character in Brickbottom
• Proximity to major office and research concentra
tions in Cambridge and Boston
• Good driving access to I-93, Cambridge and Boston
These assets can and should be leveraged now to
attract an initial investment in development over the
next 5 years, establishing Inner Belt and Brickbottom as
a regional center for high-value office and research and
development. Development during this period will likely
occur in relatively small increments of buildings up to
50,000-100,000sf.
Additional assets should be cultivated to unlock the
study area’s much larger development potential over
the next 5-20 years:
• Visible presence of housing, retail, hotels, the arts
and parks/recreation opportunities in the study area
• Additional transit connections along the Urban Ring
Corridor south to Kendall Square and the Longwood
Medical and Academic Area, and north to Sullivan
and Assembly Squares
• More complete, pedestrian-oriented network of streets
within Inner Belt and Brickbottom, with walkable con
nections to Union Square and East Somerville
• A network of safe, convenient biking paths.
Program opportunity summary
The table below outlines the potential number of new
jobs, built floor area of office/research & development
and retail space, housing units and residents possible
in the study area through about 2035. [insert “Inner
Belt/Brickbottom program summary” table, bullets and
diagram from 12/16 boards; in the table, change the
“office” label to “Office and Research & Development”]
Figures are provided for both a 2020 timeframe—re
flecting an initial round of development catalyzed by
the inauguration of Green Line service—and a 2035
timeframe, reflecting near-capacity buildout. The 2035
figures are consistent with SomerVision goals.
2020 OPPORTUNITY
2035 OPPORTUNITY
SOMERVISION 2030
GOAL
MAPC 2035
PROJECTIONS
—IBBB
MAPC 2035
PROJECTIONS
—CITYWIDE
Office and Research
& Development Space
250,000sf
3,250,000sf
Retail Space
45,000sf
165,000sf
New Jobs
900
10,250
10,000-11,000
4,879
15,130
New Housing Units
360
2,250
2,000-2,500
838
5,869
New Residents
540
3,400
1,050
6,129
30 | INNER BELT BRICKBOTTOM PLAN
What access improvements would do
the most to unlock opportunity in the
study area?
Economic development potential in Inner
Belt and Brickbottom has clearly been
limited by the area’s access constraints.
These constraints are created primarily
by the presence of four different active
rail corridors that have converged on
the area’s rail yards and Boston’s North
Station since the 1835–1850 period:
• the Lowell Line, whose embankment
splits Inner Belt into north and south
sections, connected primarily by the
“tubes,” a makeshift underpass along
Inner Belt Road that lacks walking
and biking accommodations and
chronically traps trucks with its low
clearances
• the Green Line corridor, historically
a segment of the Lowell Line, whose
embankment separates Inner Belt
from Brickbottom.
• the Fitchburg Line, which separates
Inner Belt and Brickbottom from
Somerville’s Boynton Yards area and
Cambridge
• the Newburyport and Rockport Lines, later rein
forced as a barrier by I-93 and the Orange Line,
separating Inner Belt from Charlestown.
In addition, new Green Line maintenance yard infra
structure will add tracks and a maintenance facility
in the southeastern portion of Inner Belt, and a lightly
used connecting railroad track at grade level poses
some barriers along New Washington Street.
Finally, twentieth century road construction imposed
additional barriers. The broad, elevated McGrath and
O’Brien Highway corridors separate the study area from
Union Square and other Somerville neighborhoods.
For several decades, concepts have been proposed
to mitigate some of these barriers with new bridges,
tunnels, or grade-level road reconstruction. This plan,
however, represents the first comprehensive effort
to assess and prioritize these potential, and costly,
infrastructure investments based on their anticipated
economic and community development benefits. It
builds upon the state’s initiative to inaugurate Green
Line service, which will provide the area an important
new means of crossing the Fitchburg Line and McGrath
Highway barriers. This plan also builds upon two other
major efforts that lay the groundwork for longer-term
access improvements.
First, it anticipates inauguration of Urban Ring corri
dor transit service through the study area. The Urban
NEW GREEN LINE SERVICE
New Green Line service will start to reduce rail and road barriers that have
isolated Inner Belt and Brickbottom for more than 160 years.
CRITICAL QUESTION 5
CRITICAL QUESTIONS SHAPING THE FUTURE | 31
Ring, a circumferential transit corridor ringing Boston
defined through several decades of study and policy
development, would conceptually link Inner Belt south
to Lechmere, Kendall Square, the Longwood Medi
cal and Academic Area, and other destinations to the
south and east of central Boston; and north and east to
Sullivan Square, Assembly Square, Chelsea and Logan
Airport. While the Urban Ring transit corridor currently
lacks committed funding or implementation scheduling,
strong interest in the corridor by a variety of business
es, institutions, neighborhoods and municipalities will
continue to press for its implementation.
Second, this plan was conducted in parallel with a
state-sponsored planning study of methods to recon
struct today’s elevated McGrath Highway to enhance
walking, biking, transit and driving connections in a
balanced way. Alternatives included roadways built
entirely or partially at grade, and new greenway space
for landscape and off-street multipurpose paths. The
process identified a preferred “boulevard” solution built
at grade, and this alternative was used as a basis for
studying potential long-term effects on traffic posed by
development in the study area and in the region. Im
plementation of this alternative is not anticipated for at
least ten years. In the meantime, the existing elevated
McGrath structure has been rehabilitated to extend its
useful life, and interim pedestrian, bike and roadway
improvements are being made below the structure to
enhance access convenience and safety for all modes.
Transportation infrastructure alternatives analysis meth
odology and summary recommendations
The access alternatives analysis performed as part of
this master plan builds on three major assumptions. It
maintains that the optimal access network serving Inner
Belt, Brickbottom and its surrounding context should
emphasize a range of convenient transportation
choices; that transportation and land use policy should
be managed together; and that implementation deci
sions must weigh cost-effectiveness of alterna
tives across a comprehensive range of economic,
transportation and design criteria.
• The optimal access network should emphasize a
range of transportation choices, including but ex
panding beyond automobile access which predom
inates today. Special emphasis must be placed on
leveraging new Green Line service in particular, given
its importance in drawing market-based investment
in business and real estate development. This in turn
requires emphasis on creating inviting, safe condi
f
t
Prospect Hill Avenue
Washington Street
Somerville Avenue
Poplar Street
Washington Street
Future Station
New Washington Street
Route 28
Route 28
Chester Ave
Route 28
Route 28
Route 28
Cross St.
Medford Street
Joy Street
Private Dr.
Alston Street
Linwood St.
Medford Street
Greenville Street
slope meets
grade
Boulevard Road Diet - DRAFT
CONCEPTUAL DRAFT FOR DISCUSSION 3/7/12 - CAPACITY ANALYSIS TO BE COMPLETED
Key
pedestrian crossing as part of signal phases
future Green Line track extension
potential pedestrian crossing
potential parks/plantings
potential community path for peds + bikes
Grounding McGrath
Rendering of new Washington Street Green Line station
(source: MBTA)
Concept plan for preferred McGrath Boulevard alternative
(source: MassDOT)]
32 | INNER BELT BRICKBOTTOM PLAN
tions for walking, biking and using complementary
transit services (bus and future Urban Ring corridor
transit).
• The optimal access network should be actively
coordinated with area land use, both in the planning
process and in operations. Transportation Demand
Management (TDM) strategies, well-established in
other places such as Cambridge’s Kendall Square,
should be used to offer the best possible range of
access choices to property and business owners
and their tenants, and to maximize cost-effective
ness of public investments in infrastructure. TDM
strategies involve partnership with area employers
and property owners, and typically involve incen
tives for walking, biking and transit usage (such as
reduced-cost transit passes, and improved bike
parking facilities) coupled with parking pricing poli
cies that reflect market demand for parking.
• Alternatives should be evaluated based on a com
prehensive range of criteria including benefit, cost,
and implementation feasibility. The optimal transpor
tation network must both make the transformative
improvements needed to unlock significant new
economic development and community access
opportunity, and be fully achievable with respect to
physical and financial constraints at hand. The analy
sis methodology used in this plan scored alternatives
using these criteria:
> Level of benefit
• Economic development (up to 3 points)—to
what extent will the project advance mar
ket-driven development opportunity?
• Transportation (up to 3 points)—to what extent
does the project expand needed high-quality
transportation choices?
• Urban design (up to 3 points)—to what extent
does the project create high quality places
designed for people?
> Cost/benefit (up to 3 points)—Projects were first
sorted into different cost tiers, and then scored ac
cording to what overall level of benefit they would
provide relative to their cost tier.
> Feasibility
• Technical (up to 3 points)—projects with fewer
engineering or design challenges earned more
points.
• Partnerships/land access (up to 3 points)—
projects with fewer potential complications from
needed land acquisition, partnerships with
private entities or public agencies, or similar
factors earned more points.
> Timing (up to 3 points)—Projects achievable soon
er earned more points.
An alternative could serve as little as 0 if it provides
no net benefit or -1 if it is detrimental to a criteria
standard.
Rankings scored projects within their categories as well
as across the overall study area. For instance, different
alternatives for improving access across the Lowell Line
embankment were ranked against each other to identify
which deserve highest priority in that category. Alter
natives also fell into certain tiers across the study area
based on their overall score, helping identify which ones
deserve attention first. The highest ranking alternatives
across the study area were grouped into two catego
ries, starting with “low hanging fruit” and others that are
most cost-effective and rapidly implemented (see table
X) . The second category includes projects that provide
compelling benefit but require greater investment and/
or longer timeframes to implement (see table X). These
may deserve near-term action to start their implemen
tation process but are not expected to yield near-term
results.
In short, infrastructure investment priorities fall into
these levels:
• Low-hanging fruit. These actions will cost-effectively,
quickly leverage new Green Line service.
> Enhance existing streets with sidewalks, trees,
lighting etc. as needed (up to $500,000 each).
• First priority. These actions will assist existing busi
nesses and near-term development projects.
> Replace Inner belt tubes ($10-12 million)
> Improve Tubes bypass, if this facilitates faster,
less costly Tubes replacement ($2.5-3 million)
> Create new street segments on an opportunistic
basis (up to $500,000 each).
• Second priority. These actions will unlock more sub
stantial benefits but require more complex planning
and implementation partnerships, and greater levels
of funding, making them less relevant to near term
development opportunities.
> Poplar St. extension to Inner Belt as walk/bike
greenway ($4-6 million)
> North Point bridge, preferably with traffic ($10-12
million)
CRITICAL QUESTIONS SHAPING THE FUTURE | 33
`• Third priority. To a greater degree than the second
priority actions, these require more time and funding
to implement, and so ought to be delayed until market
interest can promptly take advantage of their benefits.
> Inner Belt Rd. West extension under Lowell Line
($10-12 million)
> Other Green Line crossings ($2-6 million)
> New Inner Belt South Green Line station if feasible
Highest Priorities Across Alternatives
KEY GOALS
• Foster economic devel
opment for Somerville
• Enhance walking and
biking connections to the
Washington Street station
from all directions
• Enhance biking and Com
munity Path connections
within and beyond the
study area
SUMMARY OF PRIORITY ACTIONS
1. Improve existing streets with better sidewalks and other pedestrian in
frastructure, as cost-effective, near term “low hanging fruit” initiatives to
leverage Washington Street station and enhance existing properties. Create
a new north-south street as part of Cobble Hill Shopping Center redevelop
ment.
2. Replace the “tubes” with a more attractive and functional bridge. Enhance
the street grid and redevelopment opportunities by extending Roland Street
west to Inner Belt Road, adding a north-south street west of the Holiday
Inn, extending Third Street west to Inner Belt Road West, and enhancing
the private drive below the Lowell Line into a public street with sidewalk
3. Create a new walking/biking connection across the Green Line as part of
Green Line construction.
34 | INNER BELT BRICKBOTTOM PLAN
How can we fund needed infrastructure
improvements using the value of new
development?
The planning process analyzed opportunity for the
increased value of new development to pay for the cost
of infrastructure improvements needed to help attract
and support that new development. Major categories
of these investments include street improvements, new
streets, critical bridge connections, parks and structured
parking. Over the long term, increased tax revenue from
new development clearly supports infrastructure costs.
The greater challenge is to be able to finance critical
near-term infrastructure needs before significant reve
nues are received from the development it enables. To a
significant degree, this challenge can be met, through a
combination of carefully prioritizing infrastructure invest
ments (as described under critical question 5), and the
following specific financing strategies.
Finance plan assumptions
• Revenues
> Revenues to the city primarily consist of property
tax receipts. Because most housing development
anticipated in the study area would be multifamily
rental housing, it would produce commercial tax
payments like office or other business develop
ment would.
> A second significant source of revenue would
be fees from shared parking structures. Wheth
er parking structures are built and managed by
private developers or the City or another public
entity, these revenues could cover the cost of
creating the parking structures. Further, land
values in the study area are high enough that
greater economic value would be achieved by
property owners through building structured
parking to reserve more land for building devel
opment, than by utilizing significant land area for
surface parking. This analysis assumes prevailing
parking structure construction costs, and parking
fees typical of mixed-use areas where transit,
and to a lesser degree walking and biking, offer
reasonable alternatives to driving and parking. It
also assumes that a limited amount of structured
parking—not more than 500 spaces—may be of
fered at any given time for commuters interested
in parking for the day to complete their commute
using the Green Line. While such “park-and-ride”
facilities are not generally desired in the study
area as a long-term presence due to potential
traffic impacts and displacement of higher-value
uses, park-and-ride revenue would provide valu
able near-term financing assistance for parking
structures built with greater capacity than can
immediately be utilized by new development. (In
some cases it is desirable to build excess parking
structure capacity to make most efficient use
of land, due to the impracticality of adding floor
levels to existing parking structures)
The Community Preservation Act would also pro
duce supplemental revenue to the city, at a rate
of 3% of the amount of the property taxes. This
analysis has assumed that Community Preserva
tion Act-sourced revenues would be dedicated to
fund ongoing costs such as park maintenance, as
they are too small to make a significant contribu
tion to capital costs.
• Finance approach recommendations and assump
tions
> A District Improvement Financing (DIF) approach
is recommended, similar to the successful ap
proach taken by the City at Assembly Square.
As near-term redevelopment begins, several
DIF districts should be established within the
study area. These districts would best be scaled
approximately similar in size to the character
subdistricts outlined in the Master Plan, gather
ing a mix of near- and longer-term development
sites that would all benefit from certain specific
infrastructure improvements (such as a new street
or connection). General Obligation (GO) bonds—
rather than more costly tax-increment financ
ing methods—would be issued with to finance
improvements, repaid by growing tax revenues
from new development. 20-year terms and 4%
leverage are assumed for the GO bonds.
> Because smaller, incremental near-term projects
will produce too little revenue at first to efficiently
support GO bonds, initial infrastructure improve
CRITICAL QUESTION 6
CRITICAL QUESTIONS SHAPING THE FUTURE | 35
ments should be funded on a “pay-as-you-go”
basis from the City’s general fund. This approach
is feasible since significant near-term improvement
can come from relatively inexpensive investments
in sidewalks, street trees and other “streetscape”
elements along existing streets such as New
Washington, as detailed under critical question 5.
Inner Belt Gateway/Washington Street DIF district (yellow)
1. Phase 1 redevelopment of the Cobble Hill shopping center occurs. Over 3.5 to 4.5
years, its tax revenues can fund streetscape improvements along Washington St.,
New Washington St. and Inner Belt Rd., a new street linking Washington and New
Washington along the Cobble Hill Shopping Center, and extension of Roland Rd.
to Inner Belt Rd. through direct General Fund appropriations
2. Phase 2 redevelopment of the Cobble Hill Shopping Center, plus any ONE of the
sites with a dashed outline, can fund “Tubes” replacement and a new park along
New Washington St. through bond financing.
Inner Belt Gateway/New Washington Street DIF district (orange)
1. An initial office building redevelopment adjacent to Washington Station (private
and MBTA ownership), plus interim park-and-ride parking revenues, funds an
adjacent public parking structure serving multiple sites and uses through bond
financing
2. Redevelopment on two additional sites (private, MBTA and city ownership), plus
interim park-and-ride parking revenues, funds a second public parking structure
serving multiple sites and uses through bond financing
Brickbottom DIF district (magenta)
1. Housing redevelopment on the Cataldo Ambulance and adjacent sites funds
streetscape improvements along Joy, Chestnut, Linwood and Poplar Streets
through General Fund appropriations
2. Mixed-use development
on additional sites north of
Joy St. funds a Joy Street
public space and pedestri
an connection across the
Green Line (supplementing
MBTA Community Path
funding) through bond
financing
3. Mixed-use development
on additional sites between
Joy and Linwood Streets
funds a public parking
structure and street be
tween Joy and Linwood.
Inner Belt South DIF
district part 1 (blue)
1. Mixed use redevelopment
at 200 Inner Belt Road
funds a new street under
pass below the Lowell Line
through bond financing.
SAMPLE SEQUENCE OF PUBLIC/PRIVATE INVESTMENTS
IN INNER BELT PROPERTIES AND INFRASTRUCTURE
Sample private and public
investments are grouped
into these different cate
gories, each representing
a DIF (District Improve
ment Financing) district.
On the diagram below,
colors distinguish DIF
categories, numerals in
squares indicate private
redevelopment, numerals
in circles indicate public
infrastructure improve
ments funded through that
private development, and
number sequence indicates
a sample implementation
sequence within each DIF
district.
36 | INNER BELT BRICKBOTTOM PLAN
What will new Green Line service
bring—and when?
The MBTA Green Line is the most heavily-travelled
light-rail line in the United States, with roughly 220,000
daily riders. It provides critical mass transit service
between downtown Boston and inner-ring suburbs to
the west such as Brookline and Newton. Regionally-sig
nificant job centers such as the Longwood Medical
Area, cultural icons including Fenway Park, and several
major colleges and universities are located along the
Green Line. The long-planned Green Line Extension to
Somerville will bring convenient transit service to New
England’s most densely-populated city, connecting resi
dents to jobs and unlocking new opportunities for our
region’s economy to grow in a sustainable, transit-ori
ented pattern.
Today, the Green Line light rail system terminates at
Lechmere station, located in East Cambridge roughly
1/4 mile from the Somerville border. The Green Line Ex
tension project will extend the light rail service roughly
4.5 miles northwest through Somerville along existing
commuter rail rights-of-way. No at-grade street cross
ings will be built, since the existing rail line is generally
below street level. Six new stations will be constructed,
and the existing terminus at Lechmere will be moved to
tie in with the commuter rail right-of-way.
The extension is being built in phases. The Washington
Street station, along with two other stations closest to
downtown Boston, will be completed and operational
by early 2017. The MBTA signed a construction con
tract for this phase of the project in September 2013
worth $393 million, and work is currently underway.
Four additional stations to the west will be completed
by early 2019 (see pages 36–37). The MBTA is seeking
federal funding for this phase of the project, and sub
mitted an application to the Federal Transit Administra
tion’s “New Starts” program in October 2013.
The Green Line Extension project requires the MBTA
to invest in new trolley cars and associated mainte
nance and service infrastructure. A fleet of _____ new
trolley cars were purchased in 2012 to help handle the
projected 50,000 daily riders using the new Green Line
stations. A new Vehicle Maintenance Facility will be
constructed in Somerville’s Inner Belt district to handle
storage and maintenance operations for the fleet. The
facility will be located on Third Avenue, adjacent to
the existing Boston Engine Terminal, which serves the
MBTA’s fleet of commuter rail locomotives.
CRITICAL QUESTION 7
CRITICAL QUESTIONS SHAPING THE FUTURE | 37
COMMUNITY PATH EXTENSION
The Somerville Community Path is a re
gionally-significant commuting and recre
ation resource which will soon connect the
14-mile Minuteman Commuter Bikeway to
Somerville’s west with the 15-mile Charles
River path network. The section between
Washington Street and Lechmere station
will be particularly memorable, with ex
pansive views from the viaduct as it climbs
over the Fitchburg tracks.
MAINTENANCE FACILITY
A large vehicle maintenance facility is
necessary to operate the Green Line
Extension, and it must be located near the
new tracks. The MBTA is acquiring five
acres of private property on Third Avenue
to build the maintenance facility, which will
be located adjacent to the 25-acre Boston
Engine Terminal.
BRICKBOTTOM STATION
The Brickbottom Green Line station will be
open for service in early 2017. A construc
tion contract worth nearly $400 million was
signed in 2013, and major site preparation
will begin in 2014. The Washington Street
bridge will be rebuilt, stormwater drainage
infrastructure will be installed, and the sta
tion will be constructed. Riders will reach
Boston’s North Station in just six minutes.
MAINTENANCE
FACILITY SITE
BOSTON ENGINE
TERMINAL
Community Path is on the other side of the MBTA bridge from us.
38 | INNER BELT BRICKBOTTOM PLAN
How will the Green Line station at
Brickbottom work?
The MBTA Green Line Station will be located on the
south side of Washington Street, stretching from Joy
Street on the west to New Washington Street on the
east. The Green Line trolleys will run in existing rail
rights-of-way that currently separate Inner Belt from
Brickbottom, parallel to Chestnut Street and Joy Street.
The Green Line tracks will converge with the Lowell line
commuter rail tracks just south of Washington Street,
and both will cross Washington Street on the elevated
rail bridge. The Green Line Extension does not include
any at-grade roadway crossings.
Riders will enter the station from underneath the rail
bridge. A long, glass-fronted arcade will be built facing
Washington Street to create transparency and promote
safety. Entrances to the arcade will be on the west and
east sides of the station. Riders will enter into an open
lobby, and fare gates will be located at the southwest
(Joy Street) side of the lobby. Stairs, escalators and ele
vators will bring riders to the elevated station platform.
From the central platform, outbound trains will run
along the Lowell commuter rail right-of-way to Gilman
Square, Tufts University and eventually the Green Line’s
Mystic Valley / Route 16 terminus. Inbound trains will
run along the old Guilford freight rail sidings between
Inner Belt and Brickbottom, and up onto a viaduct
across the Fitchburg commuter rail tracks to the new
Lechmere station, Museum of Science and Boston’s
North Station.
Like all the new Green Line stations, the Washington
Street station is intended to function as a walk-up sta
tion that serves the neighborhood around it. No com
muter parking lots or garages will be built by the MBTA,
although an accessible drop-off site will be created
just east of the station to serve users of the “The Ride”
paratransit program.
To ensure safe and convenient access for riders from
the neighborhoods north of Washington Street, the
MBTA will be making improvements to the intersection
of Tufts Street, Knowlton Street and Washington Street
which include a new traffic signal and new crosswalks.
To encourage bicycle use, the MBTA will be installing
protected cycletracks on the north and south sides of
Washington Street between Joy Street and Tufts Street,
and will build an indoor bike cage to provide safe,
weatherproof locking options for cyclists. The Washing
ton Street Green Line station will provide direct access
onto the Somerville Community Path.
CRITICAL QUESTION 8
CRITICAL QUESTIONS SHAPING THE FUTURE | 39
COMMUNITY PATH
The Community Path is an important way
to get Green Line riders to and from the
stations. At Washington Street, the path
will run alongside the Green Line tracks
on the rebuilt bridge structure. The main
line of the path will continue south toward
Lechmere, and a switchback will connect
the station platform’s emergency egress
back to street level at Washington Street.
ACCESS IMPROVEMENTS
Thousands of Green Line riders will be
walking to the Brickbottom station from
East Somerville, and Washington Street
creates a major barrier. The MBTA is
redesigning the intersection of Washington
Street, Tufts Street and Knowlton Street
to ensure safety and accessibility, and will
install a new traffic signal along with new
crosswalks to ensure safety and accessi
bility.
BRICKBOTTOM STATION
The entrance to the Green Line station will
be located underneath the rebuilt Wash
ington Street bridge. The elevated plat
form is located at bridge level. Accessible
drop-off facilities and bicycle storage are
located to the east. Pedestrian and bicycle
improvements will be made along Wash
ington Street between Joy Street and New
Washington Street.
40 | INNER BELT BRICKBOTTOM PLAN
When will McGrath Highway be rebuilt
as an at-grade roadway connecting
neighborhoods?
For generations, heavy transportation infrastructure
has isolated the Inner Belt and Brickbottom districts.
Today, coordinated planning is beginning to turn historic
barriers into assets for access and placemaking. The
Massachusetts Department of Transportation’s Ground
ing McGrath initiative is one such example with major
implications for the future of Inner Belt and Brickbot
tom.
State Route 28, known as McGrath Highway in Somer
ville and O’Brien Highway in Cambridge, is a classic ex
ample of a freeway being cut through pre-existing urban
neighborhoods, serving suburban automobile com
muters at the expense of urban residents and business
operators. Throughout its 1.5 mile length in Somerville,
the oversized McGrath Highway divides neighborhoods,
denying many residents the ability to safely walk to a
neighborhood school or grocery store. The elevated
section between Washington Street and the Cambridge
city line is known as the McCarthy Viaduct was con
structed in the mid 1950’s, creating a towering wall that
separates Brickbottom from the historic and walkable
Union Square neighborhood to the west.
Community members have been advocating to remove
the elevated portion of McGrath for many years. Under
Governor Deval Patrick’s administration, the Massachu
setts Department of Transportation has engaged in a
series of landmark collaborations to evaluate whether
and how to move forward and implement the communi
ty’s vision. In 2011, the “Grounding McGrath” study was
launched, blending traditional traffic engineering with
a 21st century sensibility that focuses on urban design
and livability in the highway corridor.
A two-year public process was led by MassDOT,
working through existing conditions analysis, develop
ment of alternatives for study, alternatives analysis and
ultimately recommendations. Economic development,
environmental sustainability and public health figured
prominently in the study process. Consistent participa
tion by local residents, community-based organizations,
municipal governments and state agencies allowed for
a meaningful dialogue about various strategies being
considered.
In May 2013, the study team shared its recommenda
tions with the public, calling for removal of the elevated
McCarthy Viaduct and replacement with an at-grade
roadway that better serves all users. In December 2013,
a draft study report was published for public review and
comment. The Grounding McGrath initiative will now
move into its formal environmental review stage.
CRITICAL QUESTION 9
CRITICAL QUESTIONS SHAPING THE FUTURE | 41
INTERSECTION DESIGN
Designing a new intersection at Somerville
Avenue, Medford Street and Poplar Street
is extremely complicated, in part because
the City of Cambridge values Medford
Street in Somerville as a cut-through
for suburban drivers headed to Kendall
Square. The 2013 Grounding McGrath
study examined basic options for new
intersection geometry, but detailed designs
will not be explored until the project’s envi
ronmental phase begins (2014).
INTERIM IMPROVEMENTS
Since construction of a new at-grade road
way would likely take place between 2021
and 2023, MassDOT has committed to a
series of interim improvement measures,
including upgrades to pedestrian cross
ings at several locations, on-street bicycle
facilities, and closure of redundant ramps
and tunnels along the viaduct.
COORDINATED STUDY
The MassDOT Grounding McGrath effort
was closely coordinated with the City
of Somerville’s Inner Belt / Brickbottom
Master Planning process. Between 2011
and 2013, state and municipal staff worked
together to manage the projects, and
consultant teams shared data and analyti
cal methods. Both studies relied heavily on
stakeholder focus groups, which included
many of the same residents, businessper
sons and advocacy organizations.
42 | INNER BELT BRICKBOTTOM PLAN
Will congested roads threaten our smart
growth goals?
For generations, Somerville has been viewed as a cut-
through for regional traffic, the kind of place that people
want to go through, not to. A relatively small local jobs
base and insufficent public transit meant that the vast
majority of the city’s 45,000 workers were forced to
drive to their place of employment, since local jobs
were few and public transit options insufficient. Today,
Somerville is re-establishing a more balanced approach
to meet its transportation needs.
This master plan is rooted in the philosophy of choice.
The Inner Belt and Brickbottom districts are ideally lo
cated to offer unique access to the MBTA’s Orange Line
and Green Line, Interstate 93, the future Community
Path, and walkable neighborhoods like East Somerville
and Union Square. To achieve smart growth targets
called for in regional and local plans, roughly 50% of
new trips should be handled by transit, bicycling and
walking, and 50% are expected to be made by auto
mobile. The City must preserve roadway capacity for
essential vehicular trips, like commercial trucks serving
local businesses.
To test whether these goals are viable, the study team
evaluated existing conditions, historical trends, and
future projections under several growth scenarios.
A progressive partnership with the Massachusetts
Department of Transportation and the region’s Central
Transportation Planning Staff allowed the Inner Belt /
Brickbottom team to run development simulations using
the officially-endorsed regional model, which accounts
for changes like the new Green Line service and major
new smart growth project like Assembly Square and
North Point.
The results of these modeling efforts indicated that if
new development is oriented around pedestrians and
public transit, the region’s roadways can handle that
growth. Techniques known as “Transportation Demand
Management” must be used to discourage unnecessary
driving. These techniques include parking management,
shuttle services, and employer investments in transit
passes and bicycle facilities.
In addition, street reconstruction and new street
projects must use a “Complete Streets” approach
that emphasizes designs accommodating all forms of
travel. Recent studies have shown that local economies
perform better near complete streets projects than near
1960’s style roadway projects. The City of Somerville
will publish a Complete Streets design manual in 2014.
2035 PROJECTIONS
Daily
Vehicle
Miles
Traveled
Daily Trips
% of Non-
Auto Trips
BASELINE 2010
85,000 miles
12,000 trips
5%
SCENARIO 1
Approx. 6 million sf of development,
70% trips by auto
131,000 miles
36,000 trips
30%
SCENARIO 2
Approx. 6 million sf of development,
50% trips by auto
41,000 miles
24,000 trips
50%
CRITICAL QUESTION 10
CRITICAL QUESTIONS SHAPING THE FUTURE | 43
DEMAND MANAGEMENT
Traffic patterns can be viewed as a supply
and demand relationship. Wider roads
do not solve traffic problems, since they
increase both supply and demand. The
Kendall Square success story is about
demand management. By limiting parking,
improving mass transit, and focusing on
biking and walking, the City of Cambridge
has helped bring 20,000 new jobs to
Kendall since 1999. Automobile traffic has
dropped 14% during that period.
INTERSTATE 93
North of Boston, Interstate 93 carries
roughly 250,000 cars every weekday.
Efforts are underway to squeeze addi
tional capacity from the existing roadway,
including reclaiming unused lane space
at the High-Occupancy Vehicle lanes near
Sullivan Square. New development in the
I-93 corridor must adhere to smart growth
principles, with siting, uses and designs
that allow 50% of new trip demand to
be met by public transit, bicycling and
walking.
WASHINGTON STREET
For Inner Belt and Brickbottom to grow,
traffic congestion in Somerville’s Union
Square must be alleviated. During peak
commuting hours, the intersection of
Washington Street and McGrath Highway
experiences backups stretching eastward
from Union Square, more than 1/4 mile
away. The City of Somerville recently be
gan a major intersection redesign project
for Union Square that will improve traffic
flow all the way to New Washington Street.
44 | INNER BELT BRICKBOTTOM PLAN
Will stormwater drainage threaten
growth in Inner Belt & Brickbottom?
For generations, heavy transportation infrastructure has
isolated the Inner Belt and Brickbottom districts. The
low-lying Inner Belt district has historically struggled
with drainage issues. Much of the area is former marsh
land filled in during the nineteenth century. Roughly
85% of all sewer and stormwater drainage in Somerville
makes its way to the study area. Storm and sewer flow
from much of central and western Somerville is piped
through the MWRA’s lines connecting Poplar Street in
Brickbottom northeast to Sullivan Square.
Drainage from East Somerville and much of the Inner
Belt, however, does not successfully escape the study
area. Large pipes run east along New Washington
Street and north along Inner Belt Road, then join to
gether to run east along Third Avenue toward Interstate
93 and ultimately the MBTA’s engine terminal facility.
A major blockage in an historic stone culvert on MBTA
property prevents drainage, and backups and flooding
have been common in recent decades.
The City and its partners are working towards pro
gressive solutions for drainage and flooding issues in
the district, to ensure public safety today and unlock
development opportunities during the coming decades.
The MBTA will design and build a major pump station
adjacent to the Washington Street Green Line station,
a buried detention cistern running along the Green Line
tracks south of the station, and a detention pond at the
site of the former Red Bridge.
The City of Somerville has adopted a stormwater ordi
nance that will support on-site stormwater retention in
upstream neighborhoods, and is expanding education
programs for water and sewer ratepayers to encourage
conservation. The MBTA and the City are partnering to
prepare hydrologic models of the Inner Belt and Brick
bottom districts, to quantify the performance and cost
benefit of various improvement plans.
This plan recommends that rather than attempt to
retrofit the MBTA’s old stone culvert drainage, the City
partner with the MBTA and MWRA to bypass it, ensur
ing that system capacity equivalent to a functioning old
stone culvert is made available at an alternate location.
Pipes below Inner Belt Road should be reversed to flow
south instead of north, and should be connected to
large pipes along the MBTA’s Fitchburg rail line that run
east behind the engine terminal.
CRITICAL QUESTION 11
CRITICAL QUESTIONS SHAPING THE FUTURE | 45
OLD STONE CULVERT
Constructed around 1940, the five-foot
square “Old Stone Culvert” is located on
MBTA property on Third Avenue, and was
designed to serve a 250-acre drainage
area. A major upgrade project was planned
in the early 1990’s, but never built, and the
culvert has since become unusable due to
sediment blockage. Cleaning, upgrades, or
re-routing of all related pipes will be nec
essary to achieve this plan’s goal of 12,000
new jobs and 2,000 new housing units.
2010 FLOOD EVENT
A flash flood event in July 2010 caused
widespread damage in Somerville and
Cambridge. Insufficient capacity at the
New Washington Street pump station
contributed to flooding underneath the
Washington Street bridge. As a result, the
Green Line station is being designed with
a much more robust stormwater system,
including major upgrades to the pump
station and significant detention facilities
along the tracks to the south.
HISTORIC MILLER’S RIVER
Much of Inner Belt is filled marshland along
the banks of the historic Miller’s River, and
Boston Harbor is only a mile away. Project
ed sea level rise provides a strong incen
tive for sustainable development strategies
in the district. New drainage capacity is
needed to increase resilience from flooding
events. Adaptation strategies including
on-site stormwater retention and siting of
electrical systems in new buildings above
basement level will also be key.
46 | INNER BELT BRICKBOTTOM PLAN
What constraints do “The Tubes”
impose?
The earthen berm that carries the Lowell commuter line
rail tracks is a tremendous impediment to north-south
mobility in the Inner Belt district. The temporary Tubes
that bring Inner Belt Road underneath the tracks are a
public safety hazard, and a clear deterrent to new in
vestment. Replacement of the Tubes with a real bridge
structure is one of the top priorities of this plan.
Installed in 1985, the Tubes were intended to be a
temporary substitute for a bridge. They offer poor sight
lines, dangerous and inaccessible sidewalks, and pot
holed roadway surfaces. Business and property owners
have been watching the corrugated metal become
more and more compressed by the weight of the berm,
tracks, and trains, since there are no bridge abutments
to carry the load above. The Tubes are the only public
roadway connecting properties south of the Lowell line
to the regional street grid.
Over time, the Tubes have been slowly collapsing
under the weight of an unsupported load. In 1999, local
business owners arranged to host a tour of the Tubes
for state, regional and local officials. as the delegation
stood watching, an 18-wheel tractor trailer passing
through the Tubes became stuck. The truck driver was
forced to let air out of the truck’s tires to gain a few
inches of clearance and extract the vehicle from the
Tubes.
Replacement of the Tubes will require a coordinated
plan of action, and significant financial resources. The
2005 Inner Belt Access Alternatives Study by Vollmer
Associates, and a circa 1988 study referenced there
in by Universal Engineering Corporation, outlined a
construction methodology and provided rough cost es
timates. A primary driver of cost is the need to maintain
Amtrak and commuter rail service during construction.
To close the Tubes during construction, an alternate
route must be established to serve properties south
of the Lowell line. Third Avenue, a private road that
crosses under the Lowell line to the east, should be
used as a primary access route during replacement of
the Tubes.
The Tubes also prevent establishment of radial Bus
Rapid Transit service, which is a goal of this Plan.
CRITICAL QUESTION 12
INNER BELT ROAD
3RD AVENUE
Tubes temporary
structure
Third Avenue
bridge structure
Third Avenue
(private
way, MBTA
easement)
Third
Avenue
(private way,
MBTA owned)
CRITICAL QUESTIONS SHAPING THE FUTURE | 47
THIRD AVENUE DETOUR
Just north of the Tubes, the private Third
Avenue turns east toward Interstate 93.
Dozens of trucks use this route every day
to access the Royal White Laundary facil
ity, and employees of the MBTA’s Boston
Engine Terminal also use it. The City of
Somerville should work with private land
owners to secure safe and legal access
for all vehicular traffic headed south of the
Lowell line.
THIRD AVENUE EXTENSION
Third Avenue crosses under the Lowell line
using a narrow bridge. Just to the south
of this bridge is the location of the MBTA’s
future Green Line Vehicle Maintenance
Facility, which is scheduled to be com
pleted between 2018 and 2019. As the
MBTA moves forward with construction, a
partnership with the City of Somerville and
abutting landowners should be explored
to undertake any necessary traffic detours
and drainage improvements in this area,
and ultimately replace the Tubes.
SO CLOSE, AND YET SO FAR
The Prudential Center seems close enough
to touch, yet the “temporary” Tubes on
Inner Belt Road are the only public way in
or out of the district’s southern properties.
Remarkably, there are no abutments to
support the load above, meaning that the
Tubes are not even classified as a bridge
structure. This makes qualifying for public
financing more difficult, despite the Com
monwealth’s focus on improving bridge
safety.
48 | INNER BELT BRICKBOTTOM PLAN
How can zoning reform work for
Inner Belt and Brickbottom?
For generations, heavy transportation infrastructure has
isolated the Inner Belt and Brickbottom districts. Zoning
is a means to an end. It is a tool that municipal gov
ernments can use to guide private investment in ways
that are consistent with a shared vision for the future.
The SomerVision Comprehensive Plan identifies zoning
reform as a key step to achieving its smart growth
goals. In 2013, the City of Somerville began a complete
overhaul of its outdated zoning ordinance.
In Brickbottom, the vision is for small, fine-grained
blocks with buildings built to the street edge. Adap
tation of existing buildings will be encouraged to help
retain the post-industrial feel of the district and to
maintain a diversity of price points. Performing arts and
fabrication spaces will be prioritized. New residential
buildings in Brickbottom will be limited to between 30%
and 40% of new square footage in the district.
In Inner Belt, the vision is generally for larger buildings,
with the exception of along Washington Street where
scale should be moderated. Commercial buildings such
as office, lab and research & development will be prior
itized to maximize on-site job counts. Commercial de
velopment should account for between 60% and 70%
of new square footage in the district. Some residential
buildings will be allowed to ensure a mix of daytime and
evening activity.
In 2013, the City adopted a small zoning reform pack
age for the North Point development district that offers
important lessons for Inner Belt and Brickbottom. To
make commercial development more attractive than
residential development, the North Point zoning allows
certain types of commercial buildings as-of-right, in
stead of by special permit, offering greater predictability
for both the private developer and the City.
Zoning will also play a key role in managing transpor
tation demand. A “less is more” approach to parking
requirements will promote transit use, minimize up-front
costs for developers, and improve housing affordability.
Garage parking should be required, but shared garages
should be encouraged so that not every new building
has to park itself.
CRITICAL QUESTION 13
CRITICAL QUESTIONS SHAPING THE FUTURE | 49
SITE ASSEMBLAGE
One of Inner Belt’s competitive advan
tages is that it is one of very few dis
tricts in greater Boston than can support
large-floorplate office and research build
ings. New zoning should encourage neigh
boring property owners to work together to
assemble large development sites. Clear
design standards should be established to
ensure active, pedestrian-friendly blocks
and usable civic spaces even in large-
scale projects.
LAND DEDICATION
New development is expected to provide
public benefits, and zoning reform can
be used to ensure this process is trans
parent, fair and predictable. New streets,
alleys and civic spaces are needed to
achieve the vision for a vibrant Inner Belt
and Brickbottom. A minimum land area
dedication should be established for new
development, and a clear entitlement path
should be made available for developers
who dedicate essential new streets to the
City of Somerville.
BUILDING TYPES
This plan calls for 60%-70% of new devel
opment to be commercial (office, laborato
ry, fabrication). The most predictable way
to achieve that mix is by organizing new
zoning around building types. Since the
residential real estate market is virtually
infinite, but commercial development is
more difficult, commercial buildings should
generally be allowed by-right. In some
locations, residential buildings should not
be permitted at all.
50 | INNER BELT BRICKBOTTOM PLAN
3 | MASTER PLAN
MASTER PLAN | 51
T
he Master Plan takes the community-based plan principles described in Chapter 1, plus
the answers to critical questions covered in Chapter 2, and translates them into a tangible,
achievable vision for Inner Belt and Brickbottom. The Master Plan includes the following
components, including an initial Framework covering the entire study area, and guidelines for individual
districts and subdistricts that manifest the framework in more specific place-based ways.
FRAMEWORK
• District identity framework, drawing upon assets of the study area, and adding new elements,
to shape the distinct sense of place needed to draw market-driven development and community
activity
• Street and thoroughfare framework, adding to existing streets both the internal and external
connections needed to expand safe, convenient choices for all modes, with emphasis on walking,
transit and biking.
• Public places framework, a network of parks, plazas and greenways that add value to existing
and new development in the study area, and build community by drawing together workers,
residents and visitors from throughout the study area, city and region
• Development framework, a predictable guide for new building development that offers flexible
options for capturing market-driven business and real estate growth potential, while manifesting the
vision principles in high-value streets and public spaces.
SUBDISTRICT GUIDELINES, defining great new places through application of the components above
• Inner Belt
> Inner Belt Gateway: Washington
> Inner Belt Gateway New Washington
> Inner Belt South
> Roland/Inner Belt East
• Brickbottom
> Brickbottom: Joy/Chestnut/Linwood
> Brickbottom: McGrath Edge
52 | INNER BELT BRICKBOTTOM PLAN
SUBDISTRICTS
Inner Belt Gateway
WASHINGTON STREET
Inner Belt Gateway
NEW WASHINGTON STREET
Brickbottom
JOY & CHESTNUT
Brickbottom
McGRATH EDGE
Inner Belt South
Roland /
Inner Belt East
Four distinct subdistricts within Inner belt and two within Brickbottom should
emerge, each with its own memorable sense of place and position in the real
estate market.
The study area includes two major dis
tricts—Inner Belt and Brickbottom—of
distinct character. These districts further
include subdistricts—four in Inner Belt,
two in brickbottom—each with their
own distinct character affecting physical
scale and feel as well as market posi
tion. The districts and subdistricts are
described beginning on page 64, with
specific attention to these characteristics
of streets, building form, land use and
overall sense of place:
• Defining qualities, with attention to
land use mix, scale and other factors
• Streets
> Character
> Sidewalk width and general char
acteristics
> Plantings, materials and streets
cape
> Parking
• Street/building relationships
> Ground level use mix
> Ground level transparency
> Loading and servicing
> Building relationship to parks
• Building form
> Overall height
> Setbacks
> View corridors
> Specific themes and architectural
character
DISTRICT IDENTITY
MASTER PLAN FRAMEWORK
MASTER PLAN | 53
BRICKBOTTOM
• Smaller scale
• Brick, metal, concrete, rugged
• Dynamic, creative
• Overlapping activity spaces
STREETSCAPE DESIGN APPROACH
Distinct approached to design should be applied to the overall Inner Belt and Brickbottom areas to reinforce the
unique identity of each.
INNER BELT
• Larger scale
• Stone, metal, concrete, refined
• Distinctive, contemporary
• Dedicated activity spaces
54 | INNER BELT BRICKBOTTOM PLAN
STREETS IN THE STUDY AREA
The streets the study area has and needs must serve
multiple roles, all of them compatible with each other.
Many service and parking access functions, needed
by most all parcels, tend to detract from the pedestri
an-friendly, transit-oriented address qualities that are
important to attracting market-driven development in
terest and providing safe and inviting means of access
other than driving. Therefore, the master plan outlines a
street network for Inner Belt and Brickbottom that utiliz
es a range of street types, some tailored more to walk
ability and others more to service functions, arrayed so
that each parcel can have the range of access it needs.
While some overlapping of pedestrian-oriented and
service-oriented functions is inevitable—due to existing
conditions and the incremental process through which
the street network will grow—the more they can be
separated, the greater the area’s value will be. Where
physical overlap is inevitable, the timing of different
uses can help reduce conflicts. For instance, alleys—
termed “back streets” in this network—can be man
aged so that service access mainly occurs in the early
morning or other times when few pedestrians are likely
to be present. At other times of the day when traffic is
light, pedestrians can feel sufficiently safe and welcome
to make the back street an appropriate place for some
front door addresses. Back streets can be designed to
reinforce this quality, so that vehicles using them pro
ceed cautiously and anticipate the presence of people
walking. This approach is particularly relevant to Brick
bottom, where uses requiring significant service vehicle
access and others requiring more pedestrian access
coexist and there are few options for adding new
streets. Locations in Inner Belt where similar conditions
exist may also merit such an approach. However, the
capacity and management limitations of the approach
mean that it should be complemented by other streets
that have greater distinction between pedestrian and
service functions.
To achieve this goal the street network should incor
porate the following hierarchy of types. Each street’s
type should be reflected in its design and function, as
well as the design and function of the buildings, open
spaces and parking lining it. Off-street walking and
biking paths—which sometimes run along a street
and sometimes run independent of a street –provide
important supplementary connections, and should be
considered as part of the street network as well. These
paths are diagrammed in the Public Places section of
this document.
The street network responds to the street infrastructure
prioritization described in Chapter 2.
STREET NETWORK AND TYPES
WALKING RADII
STREETS AND THOROUGHFARES
MASTER PLAN FRAMEWORK
MASTER PLAN | 55
FRONT STREET—priority location for retail, other active ground
floor uses, and a safe and inviting walking environment
• Ground floor commercial requirement
• Ground floor residential prohibited (except lobby)
• Min. Ground floor height requirement
• Loading, service, parking entrances prohibited
• Structured parking must be lined
SIDE STREET—desirable location for retail and other active ground
floor uses, with some flexibility to include service functions
• No ground floor use regulations (intended for residential and office
entrances)
• Ground floor residential shall have individual entrances
• Upper floor residential accessed by common lobby
• Width restrictions on service entrances/loading docks/ parking
entrances (limited to one bay and 20% of block face)
• Structured parking must be lined
BACK STREET—desirable location for occupied commercial and/or
residential buildings featuring a regular occurrence of windows and
doors, with some flexibility to include service functions
• No ground floor use restrictions
• Ground floor residential shall have individual entrances
• Upper floor residential accessed by common lobby
• Width restrictions on service entrances/loading docks/ parking
entrances)
• Structured parking acceptable with occupied ground floor, architectural
facade
ALLEY/SERVICE ACCESS—preferred location for service functions,
to reduce their presence on front, side and back streets
• No specific ground floor use requirements
• Minimal transparency (>10-20%)
• No sidewalk or streetscape required
• No plantings required
• Unlimited service docks/entrances
• Structured parking acceptable
56 | INNER BELT BRICKBOTTOM PLAN
Character/Functional Goals:
• Reinforce and build upon the
mixed-use, industrial character
pf the streets.
• Establish an Arts theme in
streetscape improvements and
in new public spaces.
• Provide new pedestrian-friendly
amenities; minimize potential
conflict between additional
pedestrian traffic and existing
loading/service functions.
• Accommodate periodic public
events like art fairs, concerts,
farmers market, etc., along/adja
cent to street.
Key Design Strategies:
• Retain existing from loaded service condition. Encourage transparent garage door to minimize the extent of blank walls.
• Encourage flexible spaces that facilitate easy conversion of under-used service docks and indoor parking spaces into galleries retail or
other uses.
• Employ street design elements like bollards, trees, and planter boxes to eliminate conflict between the service vehicles and pedestrian
traffic.
• Reduce paved surfaces and increase ground water retention with permeable pavers and landscape strips.
• Manage parking/loading areas and/or provide public park space to accommodate public events.
• Install distinctive street lights that can also provide lighting for nighttime events.
• Incorporate locally-produced art into building exteriors, streetscape and public open spaces.
Street sections
Street section diagrams illustrate application of the street type characteristics to principal streets in Inner Belt and
Brickbottom. The sections demonstrate how design and allocation of space use within the street area, and in ad
jacent buildings, should work together to achieve the desired qualities for the street. See Street Types diagram on
page 54 for section locations.
A | WASHINGTON STREET LOOKING WEST
B | JOY STREET @ POPLAR
Character/Functional Goals:
• Create an attractive and an active mixed-use gateway to Somerville
• Create walkable connections across Washington St. between residen
tial/retail uses to the north and transit and amenities to the south.
• Leverage infill opportunities to create a distinctive “Main Street” link
ing Washington St. and adjacent mixed-use development with Sullivan
Square in the wast and Union Square in the west.
Key Design Strategies:
• Strengthen E-W pedestrian connection with active ground level uses.
• Provide spaces for outdoor dining along the infill buildings in the south
ern edge.
• Accommodate paratransit can parking and a taxi/drop-off stand near
MBTA station on Washington St. and/or on New Washington St. per
MBTA standards.
• Encourage distinctive architectural character with high degree of trans
parency.
MASTER PLAN | 57
Character/Functional Goals:
• A vibrant mix of infill resi
dential and new office uses
organized by proposed park—an
upgraded expansion of existing
dog park that will cater to new
residents, visitors and office
employees.
Key Design Strategies:
• Distinct residential/live-work
edge with front gardens along
the infill residential develop
ment north of the park.
• Office buildings with active
ground-level uses and outdoor
dining along the southern edge
of the park.
• On-street parking on both
sides of the streets and tighter
travel lanes as a traffic calming
measure.
D | NEW WASHINGTON STREET
C | INNER BELT ROAD @ NEW WASHINGTON (LOOKING SOUTH)
Character/Functional Goals:
• Create a prominent business address and gateway to the Inner
Belt area and Somerville, emphasizing opportunity for new
research-related development expanding on existing research
uses in the area.
• Encourage high-value development and active ground-floor
uses on vacant and infill sites.
Key Design Strategies:
• Accommodate research/office buildings distinctly visible from
Washington Station.
• Limit curb cuts and entrances to parking garage and service
docks to side street.
• Use permeable pavers, rain gardens and other street-edge land
scaping to help manage storm water.
• Include greenway/bike path as signature public realm and
connectivity feature.
58 | INNER BELT BRICKBOTTOM PLAN
A highly visible and useful system of public spaces that
touches every block, helps establish sense of place, and
can be achieved through a series of practical near- and
longer-term improvements.
Public parks and landscaped streets create community
value as amenities attracting people to work, live and
play. This community value builds economic value by
attracting investment in workplaces, housing and neigh
borhood retail and dining, that naturally benefit from
being near centers of community activity. Inner Belt
and Brickbottom will particularly benefit from added
parks and landscaped streets as very little of these are
currently present (apart from the successful dog park
on New Washington Street). SomerVision has further
identified the study area as a priority location for new
park space serving the whole Somerville community,
given the relative lack of other open space opportuni
ties in the city.
The public places framework outlines a network of
public places that are varied in their form and program.
This is partly to provide the wide variety of activities a
diverse community seeks at different times of the day,
week and year, from the more personal to the more
public—from quiet seating to active recreation, and
personal enjoyment of public art to large festivals. The
variation in form is also a practical means to create
as much high quality public space as possible in an
area that contains little city-owned land today and also
needs to serve the economic development objectives
outlined in this plan.
PUBLIC PLACES FRAMEWORK
PUBLIC PLACES NETWORK
MASTER PLAN FRAMEWORK
MASTER PLAN | 59
LANDSCAPED STREETS
PARKS
GREENWAYS AND BIKEWAYS
Types of park and green corridor program
opportunities
The public places network offers flexibility for a wide
range of programming that can be confirmed over time
• Parks. Principal types and sample program:
> Destination parks, accommodating uses such
as festivals; art and farmers’ markets; compact
sports and recreation events; dog exercise
> Local parks and plazas, accommodating uses
such as outdoor seating for adjacent dining or
retail; compact art installations and music perfor
mance; passive seating; ornamental plantings
> Semi-public spaces, accommodating uses such
as seating and outdoor dining adjacent to build
ing entrances
• Greenways and bikeways. Principal opportunities:
> Community Path, connecting on to other Somer
ville neighborhoods as well as North Point and the
Charles River, and helping connect Brickbottom
with Inner Belt
> Greenway links, augmenting the Community Path
with landscaped walking and biking connections
throughout Inner Belt and Brickbottom and con
necting with transit and adjacent neighborhoods
> Public art and interpretive signage, expressing a
creative identity for Inner Belt and Brickbottom,
and telling stories of people and places from
history and today
> Cycle tracks and bike lanes, integrating a
high-quality, safe biking network with streets and
destinations.
• Landscaped streets. Principal opportunities in
clude:
> Tree canopy, gained from additional street trees
> Rain gardens, addressing stormwater impacts in
environmentally health ways while also providing
attractive landscape amenity
> Medians, adding gateway signage and plantings
as well as enhanced pedestrian safety at selected
Washington Street locations
> Green walls, transforming existing blank building
walls or infrastructure into elements that contrib
ute to a walkable, high-value environment
60 | INNER BELT BRICKBOTTOM PLAN
Creating park space
The framework reflects four potential methods of secur
ing land for parks and green corridors:
• Utilizing existing city-owned land. The existing
dog park on New Washington Street occupies a city-
owned parcel (a remnant of the Inner Belt Express
way right of way) that stretches further along New
Washington and offers additional parkland opportu
nity in the heart of an area with strong potential for
redevelopment. The dog park, while highly success
ful, could potentially be relocated over time to other
places in the study area if other park activities more
directly related to adjacent development are desired.
The city’s former waste transfer facility at Poplar
Street and McGrath Boulevard offers another im
portant park opportunity. Like the dog park, it offers
potential for near-term uses such as youth sports
fields that serve the whole city, and that by attracting
community activity serve as a catalyst for real estate
development on nearby parcels. Over time, park
program on the site could change or be relocated
to places that better serve community goals. For
instance, as the potential development value of the
prominent site grows over time, the site or portions
thereof could be sold (or swapped with other private
land) for redevelopment and the proceeds used to
purchase other park land in the study area.
• Incentivizing large redevelopment projects to
dedicate new public park spaces. The study
area has potential, particularly in Inner Belt, for large
redevelopment projects that include multiple build
ings and the opportunity or need for new street and
park infrastructure. Often it is in the direct interest of
redevelopment applicants to incorporate new public
park space to enhance the value of their real estate
development (as well as to help satisfy stormwater
management requirements with pervious landscaped
area). This interest can be further incentivized by
offering a development density bonus, where ap
propriate to context, in exchange for providing more
significant amounts of public park space.
• Incorporating public park land into public
rights of way. Streets are important parts of the
public open space network, expanding on their
inherent role as active walking routes. Traditional
streetscape elements like street trees, low plantings
and benches create significant amenity by them
selves, enhancing the value of adjacent property ad
dresses. Where space allows along existing streets
or those created as part of large-scale redevelop
ment, additional public facilities should be created.
The off-street recreation path network leverages this
opportunity, creating a highly visible element that is
highly functional for access and recreation needs,
solves some of the study area’s access challenges,
incorporates space for additional street trees and
public art, and in total serves as a unique signature
element lending identity to the study area. Small pla
zas and broadened sidewalks also offer significant
public benefit, particularly where retail or other active
uses are possible.
• Opportunistic use of land not useful for devel
opment or other private use. Certain land areas
lack real development value due to constrained size
or shape inadequate for buildings. The rarely used
freight railroad track that parallels New Washington
Street may also offer opportunity for public use in
portions of its land area. Such areas may be useful
as park spaces, recreational path corridors and/
or for landscaping and stormwater facilities. Public
access to these lands may be possible in return for
public investment in such infrastructure, in partner
ship with property owners.
• City purchase of park space. City acquisition of
additional land in the study area is always a possi
bility, but considered challenging due to the growing
land costs associated with the area’s development
value. Therefore, the alternate means of creating
park land described above are emphasized in this
framework.
Private landscaped areas such as courtyards, and
including green roofs, offer an important complement
to public park land. While they may not be publicly
accessible, they can offer multiple benefits as attractive
landscapes, useful park areas for private use of workers
or residents, and places that serve environmental goals
benefiting the whole area like reducing heat gain and
stormwater impacts. The public places framework
diagram thus distinguishes some private open space
opportunities to recognize these contributions.
MASTER PLAN | 61
New City Park Creation
Civic space is often built by public agencies. The City of
Somerville owns roughly 150 acres of civic space, and
has added several acres in recent years. The 0.75-acre
Zero New Washington Street Park at the corner of Inner
Belt Road was opened in 2009, after the City acquired
the land from the MBTA. Since design and construction
of new civic spaces can cost around $1 million per acre,
the City is constantly exploring new financing opportu
nities.
Private Dedication or Payment in Lieu
A second mechanism used to create new civic spaces
relies on the energy of the private market. Many cities
require new development to provide civic space on-site.
In some cases, a private developer might prefer to
transfer land ownership to a public agency, rather than
build and maintain the space. Alternatively, developers
might make payments in lieu of a land dedication. In
Somerville’s Assembly Square district, a private devel
oper conveyed two acres of land to the Massachusetts
Department of Conservation & Recreation. The revital
ized Baxter Park was opened in 2013.
Private Construction & Maintenance
Great civic spaces add value to private development,
and in some cases, private developers build on-site
civic spaces, retaining ownership and maintenance
responsibilities. In 2013, the 200-unit Maxwell’s Green
residential was completed in central Somerville, featur
ing a central green framed by four apartment buildings.
The private property owner maintains the 0.75-acre
civic space.
Creating civic space
62 | INNER BELT BRICKBOTTOM PLAN
LAND USE
EFFICIENT SHARED-USE PARKING
Land use. A variety of major land uses should be wel
comed on every block in the study area, particularly in
areas within ¼ mile of transit service. Mixing uses helps
keep streets and parks active weekday and weekend,
day and night; enables new development to respond in
flexible ways to real estate market potential; and makes
most efficient use of transportation and public place
infrastructure.
Efficient shared-use parking. A development ap
proach rooted in a proactive Transportation Demand
Management (TDM) policy both promotes efficient use
of land and financial resources devoted to parking, and
ensures that adequate, conveniently located parking
is available to serve existing and new development.
Public parking, shared among different land uses that
exert peak demand at different times, should be located
in the toned areas shown to leave space for occu
pied buildings along major public streets and parks.
As development intensity increases in the study area,
structured parking should be used to maximize devel
opment potential. Near-term parking needs may be
accommodated in part by surface parking if sufficient
space is available.
DEVELOPMENT FRAMEWORK
MASTER PLAN FRAMEWORK
MASTER PLAN | 63
DEVELOPMENT INTENSITY
VIEW CORRIDORS
Development intensity. Development throughout the
study area should preferably rise at least four stories,
and at a minimum two to three stories, to best lever
age potential development value and shape walkable
streets, Additional height is welcomed where it can take
advantage of views, expand development capacity and
land use options, and lend regional prominence to Inner
Belt and Brickbottom. In all cases, building height and
massing should be designed to achieve transitions in
scale to established neighborhoods or other sensitive
context within a one-block area. In light of this goal,
building heights up to…
• six stories are appropriate in core areas of Brickbot
tom respecting its small street and block scale;
• twelve stories are appropriate along McGrath Bou
levard and Washington Street, reflecting the greater
scale and visibility of these streets; and
• twenty or more stories are appropriate in portions
of Inner Belt more than 100 feet from Washington
Street, given this area’s relative lack of sensitive
context, and strong opportunities to leverage value
of views out of and into the area.
• Building heights that diverge from these suggested
minimums and maximums may be considered if their
associated use and design are shown to advance
the goals of the vision principles.
View corridors. The
study area’s high visibility
from regional corridors like
I-93 and McGrath Boule
vard, and dramatic views
out toward downtown
Boston, Kendall Square,
Somerville, Boston Harbor
and other landscapes of
interest, are major assets
to leverage for their value
in building sense of place
and economic value. Development proposals should
demonstrate how they take advantage of these oppor
tunities.
64 | INNER BELT BRICKBOTTOM PLAN
Inner Belt is a large, high-value district that presents unique opportunities in
the regional marketplace for master-planned sites, mixed land use, new and
more walkable street and block patterns, large-floorplate building types, and
larger open space typologies.
CHARACTER AREA SUBDISTRICTS
INNER BELT
Inner Belt Gateway
WASHINGTON STREET
Inner Belt Gateway
NEW WASHINGTON STREET
Inner Belt South
Roland /
Inner Belt East
MASTER PLAN | 65
Washington St.
New Washington St.
Inner Belt Rd.
Florence St.
Mt. Vernon St.
Franklin Ave.
Franklin St.
3rd Ave.
Station Square
New Washington Common
COMMUNITY PATH
TO CHARLES RIVER
DOG PARK
Poplar Greenway
Southview Common
Skyline Park
North Point
SullivanSquare
Charlestown
EXISTING BUILDINGS
ASSUMED TO REMAIN
POTENTIAL NEW OFFICE/
RESEARCH/DEVELOPMENT
POTENTIAL
NEW HOUSING
66 | INNER BELT BRICKBOTTOM PLAN
As the front door to Inner Belt today and location of the Washington
Street Green Line station, the Inner Belt Gateway/Washington
subdistrict will continue to play a critical role in defining identity,
providing access and attracting investment for the Inner Belt area.
High quality mixed-use development should be prioritized wherever
possible along this corridor in the near term, to demonstrate the new
era of economic and community development potential now arriving
here with the Green Line. New development should include both office
space, to reinforce the larger Inner Belt district as an emerging center
for knowledge-based business, and housing, hospitality and retail
space, to leverage established market opportunity and help reinforce
community connections with East Somerville.
INNER BELT GATEWAY:
WASHINGTON ST
DEFINING QUALITIES
• Somerville and Inner
Belt gateway
• Scale and use
transition to East
Somerville
• Mixed employment,
housing, retail,
hospitality
• Access choices
DEVELOPMENT OPPORTUNITY
PUBLIC REALM
MASTER PLAN | 67
The intersection of Washington and
New Washington Streets presents the
most important near-term opportunity to
demonstrate the value of new Green Line
service with new high-value development
and a public realm designed for people.
Planned multifamily housing and
neighborhood retail, shown at left, should
be complemented with prominent office
development and clear, convenient walking
access to the station from all directions.
HOUSING
PUBLIC SIDEWALKS &
PLAZAS WITH ENGAGING
BUILDING USES, ART, DESIGN
EXPANDED,
IMPROVED WALKING
NETWORK
EARLY STAGE SMALL-
OFFICE & RETAIL
DEVELOPMENT
68 | INNER BELT BRICKBOTTOM PLAN
Streets
Street character
• Distinctive gateway to Inner Belt area and Somerville as a whole.
• Active neighborhood-oriented ground level retail edge and sidewalk
uses.
• Potential short median at city line/Inner Belt Road intersection and
where center left turn lane not needed. Otherwise, allocate surplus
width to street edges.
Sidewalk width and general characteristics
• Washington and Inner Belt Road: Widen existing sidewalk to 12’—14’.
Minimum of 8’ clear passage. Recommended 6’ for tree lawns.
• New side streets perpendicular to Washington: 8’-12’
• Mixed use buildings with ground level retail
• Enable free flow of pedestrian traffic. Provide for single row of outdoor
seating.
• Accommodate bus stops
• Accommodate added crosswalks, especially near Washington Station
Plantings, materials and streetscape
• Maintain existing mature trees. Add canopy trees where missing. Uti
lize trees to help mitigate scale transition between building heights on
either side of street. New street trees to match existing already on site.
• Distinctive materials, differentiated from Brickbottom. The use of spe
cialty paving materials to enhance the area; granite and/or concrete
unit pavers.
• Signage (banners, median sign and/or other) indicating entrance into
Somerville. Light fixtures to include LED banners and speakers for
music and public announcements.
• Transform existing suburban-style landscaping (setbacks with lawns
and shrubs) toward more urban approach (smaller courtyards shaped
by buildings and/or fences; tree lawns; planters) Potential for planted
areas to harvest rain water—bio retention
Parking
• On-street parking typical (maintain existing parking along Washington;
add along New Washington)
• Provide parking space for ‘The Ride’ paratransit and kiss-and-ride at
the MBTA station.
• Provide signage to shared-use parking structures within Inner Belt
area.
INNER BELT GATEWAY: WASHINGTON ST
development and design guidelines
MASTER PLAN | 69
Street / Building Relationship
Ground level use mix
• South side: retail, transit station lobby. Automated ticketing ma
chines, kiosk retail, cafes, drug store.
• North side: Convert to neighborhood-oriented retail or dining
through renovation/ redevelopment.
Ground level transparency
• 60-80% ground level transparency
Loading and servicing
• Locate all servicing off side streets
Building relationship to parks
• Accommodate public plaza spaces at corners with New Washing
ton
Building Form
Overall height
• South side: 5-6 stories; greater heights possible near Washington
Station. Include transitional height elements (setbacks, cornice lines
etc.) to make transition to 2-3 story scale of north side.
• North side: 2-3 stories typical; 4-6 stories possible if compatible
with adjacent neighborhood.
Setbacks
• Build to line where proposed roadway design can accommodate
14’ sidewalk.
View corridors
• Maintain view corridors along N-S streets to keep the option open
for future connections with the street grid south of Lowell Line.
Specific themes / architectural character
• Encourage distinctive architectural character emphasizing high-val
ue businesses, hotel/visitor accommodations
70 | INNER BELT BRICKBOTTOM PLAN
INNER BELT GATEWAY:
NEW WASHINGTON ST
New Washington Street offers the study area’s most important
economic development potential over the next ten years, owing to
its convenient walking access to both the Washington and Sullivan
Square transit stations, adjacency to established life science,
hospitality and housing investment, and variety of significant parcel
redevelopment opportunities. Redevelopment potential on both sides
of the street, and the current presence of a park and other public land,
create special opportunity to transform the street into a landmark
public space that heightens development value and builds sense of
community within and beyond the subdistrict.
DEFINING QUALITIES
• High quality, high
profile public spaces
and architecture
• Destination park
• Mixed employment,
hospitality, housing,
retail
DEVELOPMENT OPPORTUNITY
PUBLIC REALM
MASTER PLAN | 71
The New Washington Street dog park
became a valued community destination
remarkably quickly. This public space
should evolve into one that serves a growing
variety of people living and working nearby,
and coming from other neighborhoods, as
redevelopment proceeds on parcels along
New Washington. As this happens, consider
relocating the important dog park function
to another space(s) in the study area as a
way to establish additional community park
destinations.
PUBLIC SPACE AMENITY
SERVING WORKERS,
RESIDENTS, VISITORS
FLEXIBILITY FOR SIGNIFICANT BUILDING
HEIGHT AND FLOORPLATES—DESIGNED
TO HUMAN SCALE
72 | INNER BELT BRICKBOTTOM PLAN
INNER BELT GATEWAY: NEW WASHINGTON ST
PHASE 1
EXISTING
In the distance next to Washington Station, a new office building is developed accommodating multiple small tech business
tenants and ground floor retail. Sidewalks and street trees are installed flanking the street; an off-street cycle track is
constructed to one side.
Today, New Washington is not an inviting place to walk or invest: sidewalks are missing, abandoned boxcars create an
eyesore, and the adjacent Cobble Hill housing understandably buffers itself from this view with dense landscaping.
Sample investment sequence along New Washington Street
New Washington Street has special significance as
a place for early development opportunity. Its direct
connection to the new Washington Street Green Line
station, easy access from Washington Street and Inner
Belt Road, variety of parcels with flexible redevelopment
potential as well as viable ongoing uses, and presence
of Zero New Washington Park, provide good assets and
options attracting reinvestment. Images on these pages
depict a potential sequence of site redevelopment and
infrastructure improvements working hand in hand to
create a great place to work, live and play.
MASTER PLAN | 73
PHASE 3
PHASE 2
New housing and neighborhood retail facing New Washington Street are developed on the right on underutilized portions
of the Cobble Hill housing site at right. A large floorplate office or lab building is developed at far left for a major research
company. The lightly used freight track on the left is integrated with publicly owned land to create a landscaped park.
A second office building is constructed near the bend in the street. Behind the office buildings, a public parking structure is
built to replace temporary surface parking. A public art installation at left replaces the abandoned boxcars.
74 | INNER BELT BRICKBOTTOM PLAN
Streets
Street character
• A vibrant mix of high-value residential and office/research uses over
ground floor retail and other active uses, grouped around a central
linear park space serving a mix of residents, visitors and workers.
Sidewalk width and general characteristics
• 12’- 20.’ Sidewalk widths along park edges may differ from those
along building edges.
• New side streets perpendicular to New Washington: 8’-12’
• Wider sidewalk with outdoor seating at retail uses (likely clustered
toward Washington Station and Inner Belt Road). Consider consis
tent generous width accommodating more plantings and seating
than other streets in study area.
Plantings, materials and streetscape
• Canopy trees. Consider the use of larger street trees with open can
opies for the wider sidewalks; Honey locust. Smaller trees on the
narrower streets. Different tree species will help to define neighbor
hoods
• Signature linear park with numerous viewpoint along and across
park to adjacent building facades. Park to include an in-ground
water feature and areas for activities and contemplation. Dog park
area?
• Accommodate occasional train passage along existing freight track;
integrate track into landscape design. Potential to have freight car
riages provide dining opportunities at certain times of the year
• Distinctive materials, differentiated from Brickbottom. Park and
streets to incorporate materials and some references to the train
which runs through the heart of the area
• Distinctive public art
Parking
• On-street parking on all streets.
• Provide signage to shared-use parking structures located off side
streets
INNER BELT GATEWAY: NEW WASHINGTON ST
development and design guidelines
MASTER PLAN | 75
Street / Building Relationship
Ground level use mix
• Mix of infill residential, office and hotel with ground floor retail/
dining and entertainment on north side of street and park. Design
ground level spaces to be convertible to retail.
• Emphasis on commercial/office uses south of the park, with poten
tial housing interspersed, and ground level retail/dining/entertain
ment where possible. Design ground level spaces to be convertible
to retail.
Ground level transparency
• 60-80% ground level transparency
Loading and servicing
• Locate entrances to parking garages and loading docks from side
streets
Building relationship to parks
• Building use and design should leverage quality and views of cen
tral park along New Washington.
Building Form
Overall height
• 5-6 stories typical, with towers of slender to moderate floorplate
possible.
Setbacks
• Build to line where proposed roadway design can accommodate
14’ sidewalk. If the sidewalk is less than 10’, employ 6’-10’ setback
to allow space for outdoor dining.
View corridors
• Locate and design buildings to be prominent at either end of linear
park.
Specific themes / architectural character
• High quality, high-value design with significant transparency. Mix
housing and/or hotel amidst office to prevent monolithic office
character.
76 | INNER BELT BRICKBOTTOM PLAN
INNER BELT SOUTH
Inner Belt South provides both an economically strong business park
environment today, and the study area’s most flexible and expansive
set of redevelopment opportunities over the long term. The time
required to enhance multi-modal access to the area—starting with
replacing the “tubes” and creating safe, convenient walking access to
the Green and Orange lines, and moving on to North Point/Kendall
Square connections—means that current businesses can continue to
operate in a stable environment even as market potential matures to
unlock a new generation of development opportunities in the area.
Those opportunities will leverage expansive potential for building
height and floor area serving a variety of uses, fast connections to
Kendall Square and other economic centers, regional views, and high
quality public street and park spaces.
DEFINING QUALITIES
• View corridors to
Boston/Kendall
• Destination park
space
• Greater building
height
• Mixed employment,
housing
DEVELOPMENT OPPORTUNITY
PUBLIC REALM
MASTER PLAN | 77
New direct walking connections to Green
Line, Orange Line and Urban Ring corridor
transit will unlock market potential to take
advantage of Inner Belt South’s large scale
redevelopment opportunities. Tall buildings
with views to Boston, Cambridge and
Boston Harbor will tangibly demonstrate
Somerville’s strategically valuable location
for business investment.
HIGH-VALUE
COMMERCIAL AND
HOUSING DEVELOPMENT
NEW CONNECTIONS TO
WASHINGTON STATION,
BRICKBOTTOM
PARK, COMMUNITY PATH
CONNECTIONS CREATING
DISTINCT SENSE OF PLACE
78 | INNER BELT BRICKBOTTOM PLAN
Streets
Street character
• A vibrant mix of high-value residential and office/research uses over
ground floor retail and other active uses, grouped around a central
park space serving a mix of residents, visitors and workers.
Sidewalk width and general characteristics
• Inner Belt Road and Third Street extension (west of Inner Belt
Road): 12’-14’. Accommodate BRT/bus stops.
• Other new streets: 8’-12’
Plantings, materials and streetscape
• Canopy trees selected and located to be compatible with signifi
cant truck traffic The selection of columnar street trees might be
beneficial in this area to avoid conflicts with passing trucks.
• Distinctive materials, differentiated from Brickbottom
• Landscaped berm as buffer to active rail tracks and maintenance
facilities. The berm could become a important feature within the
landscape.
Parking
• On street parking
• Structured parking serving multiple uses in district
INNER BELT SOUTH
development and design guidelines
MASTER PLAN | 79
Street / Building Relationship
Ground level use mix
• Research, office, housing and hotel uses. Ground level retail/dining/
entertainment where feasible.
Ground level transparency
• Inner Belt Road and Third Street extension: 50-80% ground level
transparency. Other streets: 40-60%.
Loading and servicing
• Limit entrances to parking garages and loading docks to side
streets.
Building relationship to parks
• Leverage views to Inner Belt Intensity central park space.
Building Form
Overall height
• 6-30 stories. Pedestrian-scale elements toward ground level. Tow
ers of slender to medium floorplate.
Setbacks
• No more than 10’
View corridors
• Highlight public and private views toward Kendall Square, Lech
mere and Boston.
Specific themes / architectural character
• Encourage diverse architectural vocabulary that is tied together
by an active pedestrian realm; where each residential building and
towers is a distinct part of a unified high density mixed used cluster.
80 | INNER BELT BRICKBOTTOM PLAN
ROLAND /
INNER BELT EAST
This subdistrict offers premier commercial development opportunity
due to its high visibility and accessibility from I-93 and the Orange
Line, substantial building floorplate and height opportunities, and
adjacency to established life sciences uses. While Inner Belt Road
and new streets in the subdistrict deserve high quality landscape
and building architecture as premier, walkable address streets, the
subdistrict’s edges along rail infrastructure offer the study area’s
greatest opportunities for industrial and large-scale development
unconstrained by pedestrian-oriented settings.
DEFINING QUALITIES
• Somerville and Inner
Belt gateway
• View corridors in and
out
• Roland St. historic
character, life
sciences use
• Greater building
height
• Greater floorplates
possible
• Mixed employment,
hospitality, retail
DEVELOPMENT OPPORTUNITY
PUBLIC REALM
MASTER PLAN | 81
Roland/Inner Belt East offers prime
locations for development that benefits
from high visibility, large floorplates,
large total floor area, and clustering
with life sciences program.
“TUBES” REPLACED WITH
ATTRACTIVE BRIDGE FACILITATING
CONTINUOUS STREETSCAPE.
HOUSING
OFF-STREET RECREATIONAL
PATH OR CYCLE TRACK
EXPANDED, IMPROVED
PEDESTRIAN REALM
TRANSIT SHELTER
SERVING BRT
USERS
HIGH-VALUE RESEARCH AND
OFFICE BUILDINGS WITH
ACTIVE GROUND LEVEL USES
FLEXIBILITY FOR SIGNIFICANT
BUILDING HEIGHT AND FLOORPLATES
82 | INNER BELT BRICKBOTTOM PLAN
Streets
Street character
• Establish a walkable street grid compatible with large floor plate
office/research/light industrial buildings and structured parking
facilities.
Sidewalk width and general characteristics
• Inner Belt Road: 12’-14’. Accommodate BRT/bus stops.
• Roland Street and new streets: 8’-12’ (or match existing Roland St.
section)
Plantings, materials and streetscape
• Canopy trees selected and located to be compatible with signifi
cant truck traffic. The selection of columnar street trees might be
beneficial in this area to avoid conflicts with passing trucks.
• Sidewalks to be concrete only
Parking
• On street parking
• Structured parking serving multiple uses in district
Street / Building Relationship
Ground level use mix
• Research, office, light industrial and hotel uses. Ground level retail/
dining/entertainment where feasible.
Ground level transparency
• Inner Belt Road: 50-80% ground level transparency. Other streets:
40-60%.
Loading and servicing
• Limit entrances to parking garages and loading docks to side
streets
Building relationship to parks
• Building use and design should leverage quality and views of cen
tral park along New Washington.
ROLAND / INNER BELT EAST
development and design guidelines
MASTER PLAN | 83
Building Form
Overall height
• 6-20 stories
Setbacks
• No more than 10’
View Ccorridors
• Accommodate extension of Roland Street corridor to Inner Belt
Road.
• Frame views down Inner Belt Road toward Lechmere, Back Bay
Specific themes / architectural character
• Where possible open up ground level research and workshop
spaces with transparent glazing bringing about a visual connection
between pedestrians along the side walk and building users.
• High quality, high-value design with significant transparency.
84 | INNER BELT BRICKBOTTOM PLAN
Brickbottom is a funky loft, arts/creative economy and nightlife district, with
a relatively established street grid and compact, flexible-use public spaces that
are scattered throughout the district. A mix of old and new buildings (and hence
price points) provide variety of architecture and market opportunity. Building
heights should generally rise four to six stories, with potential for as many as 12
stories immediately adjacent to McGrath Highway and Washington Street.
CHARACTER AREA SUBDISTRICTS
BRICKBOTTOM
Brickbottom
JOY & CHESTNUT
Brickbottom
McGRATH EDGE
MASTER PLAN | 85
Poplar St.
McGrath Blvd.
Chestnut St.
Joy St.
Linwood St.
COMMUNITY PATH INTO SOMERVILLE
McGrath Greenway
Brickbottom Square
George Dilboy Square
Union
Square
EXISTING BUILDINGS
ASSUMED TO REMAIN
POTENTIAL NEW OFFICE/
RESEARCH/DEVELOPMENT
POTENTIAL
NEW HOUSING
ILLUSTRATIVE VISION CONCEPT
86 | INNER BELT BRICKBOTTOM PLAN
BRICKBOTTOM /
JOY & CHESTNUT
Brickbottom sports the study area’s most established sense of
place, anchored by a strong arts presence. While individual parcel
redevelopment opportunities are limited in size, their variety, scale and
walkable proximity to Washington Station mean they are both ripe
for near term redevelopment and will collectively register substantial
gains in economic impact and quality of place. Brickbottom can
tolerate and thrive on coexistence of a wide variety of activities from
light industry and arts fabrication to housing and office.
DEFINING QUALITIES
• Fine-grained scale:
narrower streets,
smaller parcels
• “Loose fit” tolerating
mix of light industry,
arts, office, housing,
entertainment, retail
• Brick and industrial
materials
• Public art
• Intermittent plantings
DEVELOPMENT OPPORTUNITY
PUBLIC REALM
MASTER PLAN | 87
Joy Street and adjoining parking lots can
become vibrant centers of community
activity through design and programming
that allow public and private uses to share
the same spaces at different times. Needed
new walks, trees, and lighting should be
installed to allow broad flexibility of land use
and vehicular access.
STREETSCAPE, WALKING AND
BIKING IMPROVEMENTS LINKING
BRICKBOTTOM TO GREEN LINE
DUAL USE OF PARKING/LOADING
AREA FOR OCCASIONAL PUBLIC/
ARTS EVENTS
INFILL: MIX OF OFFICE, ARTS,
HOUSING, LIGHT INDUSTRY
NIGHT TIME
ACTIVITY
88 | INNER BELT BRICKBOTTOM PLAN
Streets
Street character
• Reinforce and build upon the mixed-use, industrial character of the
street with pedestrian friendly amenities for newer residents and
visitors.
Sidewalk width and general characteristics
• 8’—12’ on Joy, Chestnut, Linwood, Fitchburg
• 12’-14’ on Poplar
• New streets parallel to Poplar: 6’-12’. Consider curbless shared
pedestrian/vehicle streets.
• Enable free flow of pedestrian traffic while at the same time accom
modating existing front loading zones in live-work buildings. Locate
any outdoor dining or other outdoor active uses away from loading
facilities.
• Consider lighting suspended from and/or projected on buildings
Plantings, materials and streetscape
• Include trees where possible, though limited street width and
occasional loading docks limit consistent placement. Consider
interspersing trees within parking lane. Species to consider in the
narrow streets are Armstrong Red Maples and Princeton Elms
which have an upright growth habit.
• Include additional plantings using planters, trellises, green walls
or other strategies, especially where trees are infeasible. Due to
the narrow streets static planters might be problematic. Consider
installing smaller removable planters.
• Use materials compatible with industrial character—reinforcing
limited presence of “brick” but also other industrial materials. Site
furnishings to be constructed of powder coated metal with forms
consistent with the industrial appearance. Consider a narrow brick
furniture zone for the placement of lights, benches, trash recep
tacles, etc. Main walking surface to be poured in place concrete. In
stall solar power parking stations as a standard element throughout
the entire project
Parking
• Employ on-street parking as an active design device to reduce
vehicle speeds and to provide for additional parking demands from
newer buildings.
• Consider eliminating the curb between sidewalks and streets, using
bollards to separate on-street parking from sidewalk spaces
BRICKBOTTOM: JOY & CHESTNUT
development and design guidelines
MASTER PLAN | 89
Street/Building Relationship
Ground level use mix
• Primary Uses: artist studios & galleries, small offices, restaurants and cafes, enter
tainment, retail, live/work spaces
• Secondary Uses: housing
• Prevent conflict between housing and other uses by locating housing on upper
floors only or by raising ground floor housing at least one foot above grade.
Ground level transparency
• Encourage retrofitting existing building with greater transparency at ground level.
• Encourage transparent garage doors that facilitate easy conversion of indoor park
ing spaces into galleries, retail, office or other uses.
• 40% - 60% transparency in new buildings
Loading and servicing
• Retain the existing front loaded service conditions, but selectively employ street
design elements like bollards, trees and planter boxes to prevent conflict between
service vehicles and pedestrian traffic.
• Repurpose loading docks where possible for outdoor dining, stoops etc.
Building relationship to parks
• Support a network of semi-public plazas and open spaces, by utilizing portions of
underused front setbacks between the streets and existing buildings.
Building Form
Overall height
• 3-6 stories, with the option of taller towers at Washington St. edge near Washing
ton Station
Setbacks
• None (Minimum 4’ setback where outdoor seating intended).
View corridors
• Retain view corridors to downtown Boston.
• Highlight prominent buildings at ends of streets and at bends in Joy Street.
Specific themes / architectural character
• Preserve and encourage the finer grain, industrial character of Brick bottom.
• Maintain the similar palette of exposed brick and earthy color tones for future
buildings
• Limit uninterrupted building length to 150’
• Employ large windows and transparent garage doors for ground level uses. Large
industrial-style windows encouraged on upper floors.
90 | INNER BELT BRICKBOTTOM PLAN
BRICKBOTTOM /
McGRATH EDGE
The Brickbottom/McGrath Edge subdistrict makes the study area’s
most important connections to Union Square, Boynton Yards and
adjacent areas seeing transit oriented redevelopment. Near-term
improvements to McGrath Highway will enhance walking and
biking connections to these areas, while the longer-term conversion
of McGrath into an at-grade boulevard and greenway will unlock
new market opportunity for high-value, large-scale mixed-use
development.
DEFINING QUALITIES
• Larger scale
responding to
McGrath Boulevard
• Park/greenway
setting with
consistent tree
canopy; public art
• High value, high
quality landmark
architecture
DEVELOPMENT OPPORTUNITY
PUBLIC REALM
MASTER PLAN | 91
A variety of parcels west of Washington
station hold potential for transit-oriented
redevelopment that establishes prominent,
pedestrian-friendly connections to Union
Square and beyond.
EXPANDED, IMPROVED
WALKING AND BIKING
NETWORK
STATION
INTEGRATED WITH
BUILDING DESIGN
MIXED OFFICE AND
HOUSING WITH GROUND
FLOOR RETAIL
92 | INNER BELT BRICKBOTTOM PLAN
Streets
Street character
• Tree lined multi-way boulevard and greenway framed by mid-rise,
mixed-use building edge
Sidewalk width and general characteristics
• 10’-15’ along building edges
• Cycle track or multi-use path along greenway
• Outdoor dining, public art, water features and provision for parking
mobile retail vehicles (e.g. food trucks)
Plantings, materials and streetscape
• Tree canopy along and across boulevard. Tree species for the
central roadway median are to be columnar. For trees planted in the
sidewalk zone consider London Plane or Pin Oaks.
• Distinctive linear lower landscape plantings along greenway. Side
walk materials help to define zones for pedestrian movement and
outside dining/gathering spaces. Consider the use of moveable
planters for color and texture; they can also help to define the out
side dining areas. Sidewalk materials to consist of a brick furniture
zone and concrete. Site amenities to be a modern mix of metal and
wood.
• Use plantings, public art and/or signage to establish pedestrian
scale and buffer pedestrians and bikes from traffic Bump outs
created for pedestrian safety can also house public art and/or
water features whilst providing ample room for public viewing. Food
trucks can also be stationed in close proximity to the bump outs
to provide larger dining areas. Installing solar parking stations will
reduce the amount of clutter on the street.
Parking
• Consider expanding on-street parking by adding a carriage road
with parking on both sides (28’-34’ wide overall)
BRICKBOTTOM: McGRATH EDGE
development and design guidelines
MASTER PLAN | 93
Street/Building Relationship
Ground level use mix
• Office and retail. Non-retail spaces should be convertible to retail.
Ground level transparency
• 50-80% ground level transparency
Loading and servicing
• Eliminate all service access from McGrath edge. Locate service
docks from mid-block alleys.
Building relationship to parks
• Building use and design should leverage quality of McGrath green
way as linear park
Building Form
Overall height
• 5-6 stories typical, with towers of slender floorplate possi
ble.
Setbacks
• None.
View corridors
• Reinforce views toward Kendall Square
Specific themes / architectural character
• Signature mixed use boulevard for the city of Somerville that cele
brates the re-insertion of pedestrian realm with the city fabric.
94 | INNER BELT BRICKBOTTOM PLAN
A
good neighborhood plan is easy to put to work. It must clearly spell out short-term actions that
can be taken, to build momentum and enthusiasm for the medium-term and long-term activities.
Issues that require many years to coordinate and complete should be broken into bite-sized
pieces. People love checking items off of a list, and long-range neighborhood plans must play to that
strength. After all, you can’t manage what you can’t measure.
Similarly, plans need to use everyday language. Since government agencies often take the lead on
plan activities, there is always a risk of using too much technical or bureaucratic language in the plan.
Good neighborhood plans remind the reader that each action is intended to improve quality-of-life, help
businesses succeed, and increase community pride.
This chapter is structured as a calendar. The Inner Belt Brickbottom Plan calls for the City and its
partners to take 100 specific actions over the next decade to achieve the goals of the plan. For each
action, an approximate starting point in time is listed. Of the 100 actions listed, 50 will begin in 2014.
Some actions will extend beyond 2024, but to keep the calendar readable, years in the later period
(2024-2035) are grouped together.
This neighborhood plan is rooted in five core values: creating places for people; connecting
neighborhood to neighborhood; growing the economy; coordinating public and private investment;
and, making development sustainable. Since these values are broad, they are broken down into more
manageable strategies, which continue to use everyday language.
4 | PUTTING THE PLAN TO WORK
PUTTING THE PLAN TO WORK | 95
Plan Values
Strategies
Create great places
for people.
Welcome People to Somerville
Invest in Civic Spaces
Invite People to Walk
Make Bicycling a Signature of the District
Share Street Space Between Cars and People
Create 18-Hour Neighborhoods
Connect
neighborhood to
neighborhood.
Replace the Tubes
Connect Inner Belt to Brickbottom
Link Inner Belt and Brickbottom to East Somerville
Connect Inner Belt to Cambridge
Connect Inner Belt to Boston
Grow the economy.
Make Commercial Development Easy
Ensure that Inner Belt Brickbottom are Somerville Neighborhoods
Support New Job Creation
Develop the Local Workforce
Empower a Business Management Organization
Coordinate
public and private
investment.
Create and Expand Street Grids
Capture the Value of Transit
Plan Regionally
Make development
sustainable.
Utilize Low-Impact Development Practices
Manage Stormwater Effectively and Efficiently
Promote Choice in Housing
Manage Transportation Demand
96 | INNER BELT BRICKBOTTOM PLAN
1 CREATE GREAT PLACES FOR PEOPLE
Table X: Action Items: Create great places for people
ACTION STRATEGY
ACTION DETAILS
AGENTS
(LEAD/PARTNER)
1.1 Welcome
people to
Somerville
Partner with the MBTA and MassDOT to design and construct the Green Line station at
Washington Street, with 360 degrees of public accessibility
City, MBTA, MassDOT
Partner with the MBTA and MassDOT to design and construct the full Somerville Community
Path Extension from the Green Line station at Washington Street to the new Lechmere
Station, with connections to local streets in and around Inner Belt and Brickbottom
City, MBTA, MassDOT
Install additional Inner Belt gateway signs like the one at the corner of Inner Belt Road and
New Washington Street.
City, local business and
property owners
Launch a Citywide wayfinding signage program including financing strategies for design and
installation
City, local business and
property owners
1.2 Invest in
civic spaces
Ensure that reformed zoning includes a process by which each development project must
build high-quality civic space on-site, or provide a payment in-lieu to allow the City to
purchase and create centralized space like those spaces shown on the Vision Plan.
City
Design and install a temporary, pedestrian-oriented use at the former Waste Transfer Facility
site.
City, local artists, busi
ness and property owners,
residents
Ensure that privately-owned civic spaces included in the redevelopment of 90 Washington
Street are built and maintained.
City, property owner
Seek opportunities to create additional temporary recreation and/or public art spaces on
underutilized sites in Inner Belt until redevelopment occurs.
City, business and prop
erty owners, local artists
Expand the Zero New Washington public space west along Cobble Hill Road to create the
“New Washington Common” shown in the Vision Plan. See also action 3.2.
City, Pan Am Railways,
business and property
owners, local artists
Partner with the private owner of 86 Joy Street to plan and build “Brickbottom Square” as a
front yard for the building, as shown in the Vision Plan. See also action 3.1.
City, property owner, local
artists
Ensure that reformed zoning includes a process by which each development project must
build high-quality civic space on-site, or provide a payment in-lieu to allow the City to
purchase and create centralized space like those spaces shown on the Vision Plan
City
1.3 Focus on
walking
Design and construct sidewalks and crosswalks on Washington Street, New Washington
Street, Inner Belt Road, Joy Street, Chestnut Street, Linwood Street and Poplar Street that are
ADA-compliant, constructed of durable, long-lifespan materials, provide opportunities for
outdoor café seating and encourage comfortable pedestrian life. See also action 2.3.
City, MassDOT, adjoining
property and business
owners
Establish a palette of artistic street furnishing materials for Brickbottom and Inner Belt,
promoting the unique identity of each area.
City, local artists, busi
ness and property owners
Ensure that reformed zoning provides for engaging street frontage for all new buildings,
including multiple doors facing the street.
City
Adopt planting standards to ensure that landscaping for streetscapes and private property
frontage is designed to encourage walking and sitting.
City
Adopt and enforce design standards requiring new parking garages to be wrapped by active
buildings.
City
Ensure that reformed zoning identifies key street frontage appropriate for loading and
delivery, and adopt design and performance standards for new development.
City
PUTTING THE PLAN TO WORK | 97
ACTION TIMEFRAME
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
98 | INNER BELT BRICKBOTTOM PLAN
1 CREATE GREAT PLACES FOR PEOPLE CONTINUED
ACTION STRATEGY
ACTION DETAILS
AGENTS
(LEAD/PARTNER)
1.4 Make safe,
convenient,
enjoyable
bicycling a
signature
of the study
area
Partner with the MBTA and MassDOT to design and construct the full Somerville Community
Path Extension from the Green Line station at Washington Street to the new Lowell Street
Station, with connections to local streets.
City, MBTA, MassDOT
Partner with the MBTA and MassDOT to ensure that two-way cycle tracks are constructed on
Washington Street between Joy and New Washington Streets when the Green Line station is
built.
City, MBTA, MassDOT
Prioritize separated bicycle facilities on all road reconstruction projects.
City, MassDOT
(as applicable)
Revise development standards for new commercial buildings to provide bicycle storage and
commuter shower facilities.
City
1.5 Re-balance
street space
allocation
among cars
and people
Support MassDOT’s Grounding McGrath project, including entering into the environmental
process to return the roadway to an at-grade urban thoroughfare.
City, MassDOT
Redesign Washington Street from Sullivan Square to McGrath Highway as a Complete Street,
to ensure better sharing of space between pedestrians, cyclists, transit riders and drivers.
Investigate options to fund implementation, then pursue implementation.
City, MassDOT,
City of Boston
Investigate funding options to reconstruct Washington Street as a Complete Street.
City, MassDOT, City of
Boston
Ensure that reformed zoning includes parking maximums for new development.
City
Establish parking facilities that will be shared by different uses, eliminating the need for every
new development project to provide its own new parking.
City, business and
property owners
1.6 Create 18-
hour neigh
borhoods
Ensure that reformed zoning establishes active ground-floor uses in identified retail clusters,
per Master Plan recommendations.
City
Ensure that 30% to 40% of new development is residential to ensure activity throughout the
day and night and on weekends.
City
PUTTING THE PLAN TO WORK | 99
ACTION TIMEFRAME
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
100 | INNER BELT BRICKBOTTOM PLAN
Table X: Action Items: Connect neighborhood to neighborhood
ACTION STRATEGY
ACTION DETAILS
AGENTS
(LEAD/PARTNER)
2.1 Replace the
Tubes
Partner with private property owners and the MBTA to secure passage rights to the Third
Avenue Extension underneath the Lowell line as a temporary vehicular access for properties
south of the Tubes during the planning, design and construction of a bridge structure at Inner
Belt Road.
City, MBTA, property
owners
Work with the MBTA and its commuter rail contractor to plan, finance and construct a bridge
structure to replace the Tubes.
City, MBTA, rail con
tractor
Partner with private property owners at 30 and/or 50 Inner Belt Road to secure temporary
easements for construction staging on privately-owned parking lots.
City, MBTA, property
owners
2.2 Connect In
ner Belt and
Brickbottom
Partner with the MBTA and MassDOT to create at least one safe, convenient walking connec
tion between Inner Belt South and Brickbottom as part of Green Line and Community Path
installation. Ensure the elevated Community Path is built to accommodate potential connec
tions to future adjacent buildings and/or open spaces. See also action 4.2.
City, MBTA, MassDOT
Work with property owners flanking the Green Line and the MBTA to encourage installation
of accessible pedestrian bridge(s) over the Green Line connecting Inner belt and Brickbottom
streets. See also action 4.2.
City, MBTA, MassDOT,
property owners
2.3 Connect In
ner Belt and
Brickbottom
to East
Somerville
Redesign Washington Street to include safer pedestrian crossings, wider sidewalks, protect
ed cycletracks, and on-street parking.
City, MBTA, MassDOT,
property owners
Partner with the MBTA and MassDOT to design and construct the full Somerville Community
Path Extension from t he Green Line station at Washington Street to the Cross Street bridge.
City, MBTA, MassDOT
Ensure that reformed zoning encourages adaptive re-use and selective, appropriately-scaled
redevelopment on the north side of Washington Street, with active, pedestrian-oriented uses
on the ground floor.
City, property owners
Ensure that reformed zoning encourages consistent building frontage on the south side of
Washington Street to create a more walkable street edge.
City, property owners
Establish strategies to improve connections between Washington Street and Broadway for
pedestrians, cyclists, and in limited circumstances, drivers as part of a neighborhood plan
for East Somerville.
City
2.4 Connect
Inner Belt to
Cambridge
Design a bridge structure that connects Inner Belt Road to North Point.
City, MBTA, MassDOT
Explore financing options to build an Inner Belt-North Point bridge. Work with the City of
Cambridge to explore a bridge design that allows full vehicular use of the Inner Belt / North
Point bridge. Design the bridge structure in partnership with the City of Cambridge, the
MBTA and adjoining property owners. Take further actions as needed to foster bridge con
struction. See also action 4.2.
City, MBTA, MassDOT,
adjoining property owners
Establish a Transportation Management Association to provide transit services connecting
employment centers at Assembly Square, Sullivan Square, Inner Belt, North Point and Ken
dall Square, or in the alternative, seek public support for this service in coordination with
Urban Ring implementation.
City, property and busi
ness owners, MassDOT,
MBTA, Cities of Boston
and Cambridge, institu
tions and/or other inter
ested partners
Work with the City of Cambridge to explore a bridge design that allows full vehicular use of
the Inner Belt / North Point bridge.
City, City of Cambridge
2 CONNECT NEIGHBORHOOD TO NEIGHBORHOOD
PUTTING THE PLAN TO WORK | 101
ACTION TIMEFRAME
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
102 | INNER BELT BRICKBOTTOM PLAN
ACTION STRATEGY
ACTION DETAILS
AGENTS
(LEAD/PARTNER)
2.5 Connect
Inner Belt to
Boston
Coordinate with the City of Boston and private property owners to plan for the extension of
Roland Street to Inner Belt Road as new development occurs.
City, property and
business owners City of
Boston
Work with the MBTA to explore potential longer-term relocation of rail yard space east of
Inner Belt Road, to enable extension of New Washington Street and additional development
opportunities.
City, MBTA
PUTTING THE PLAN TO WORK | 103
ACTION TIMEFRAME
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
104 | INNER BELT BRICKBOTTOM PLAN
Table X: Action Items: Grow the economy
ACTION STRATEGY
ACTION DETAILS
AGENTS
(LEAD/PARTNER)
3.1 Make com
mercial
development
easy
Ensure that between 60% and 70% of new square footage developed in Inner Belt and Brick
bottom is commercial.
City
Organize zoning regulations around building types.
City
Prepare zoning regulations that include by-right entitlements for multi-story commercial
building types with design review.
City
Ensure that reformed zoning provides incentives for neighboring property owners to prepare
shared development plans that maximize development potential.
City
Overhaul Somerville’s sign code to streamline review and ensure high-quality design.
City
3.2 Ensure
that Inner
Belt and
Brickbottom
are great
Somerville
neighbor
hoods
Ensure that reformed zoning includes regulations enabling fabrication and light manufactur
ing uses.
City
Protect the viability of walkable, transit-centered artist live-work space at 1 Fitchburg Street.
City, property owner
Partner with the private owner of Joy Street Studios to preserve and expand the affordable
studio and light manufacturing space that supports Somerville’s creative economy.
City, property owner
Ensure that reformed zoning encourages multiple, small gallery spaces and performing arts
venues to be built in Brickbottom.
City
Ensure that public art is located throughout Inner Belt and Brickbottom.
City, local artists
Partner with the MBTA and private rail operators to create a pilot project that cleans up the
Yard 10 Lead track and boxcar at Cobble Hill Road to create an attractive, branded gateway
for New Washington Street, with enhanced public open space and streetscape opportunities.
City, MBTA, Pan Am
Railways
3.3 Support new
job creation
Ensure, through zoning and project design review, that old and new buildings can co-exist as
development occurs in Inner Belt and Brickbottom.
City, property owners,
developers
Support adaptive re-use of existing commercial buildings to achieve increased job density.
City, property and busi
ness owners
Through zoning and economic development policies, encourage a diverse mix of job types in
Inner Belt and Brickbottom.
City, Somerville Chamber
of Commerce
Ensure that new zoning regulations allow building types that meet a range of space needs
and price points.
City
Ensure that reformed zoning in Inner Belt establishes the opportunity to place large floorplate
buildings in appropriate locations, thereby positioning the district to meet a unique need in
the regional commercial real estate market.
City
Coordinate with private property owners of outdoor vehicle storage and equipment storage
sites to plan to transition these sites into more job-dense uses.
City, property and busi
ness owners
3.4 Develop our
local work
force
Publicize existing partnerships and programs offering job training.
City, workforce training
partners
Expand workforce development efforts.
City, workforce training
partners
Ensure that reformed zoning includes a predictable jobs linkage mechanism.
City
3.5 Empower
a business
management
organization
Explore establishment of a new entity empowered to support business recruitment efforts,
perform marketing and branding services, maintain public and private civic spaces, oversee
cultural programming, and manage parking and shuttle services.
City, Somerville
Chamber of Com
merce and/or other
business partners
3 GROW THE ECONOMY
PUTTING THE PLAN TO WORK | 105
ACTION TIMEFRAME
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
106 | INNER BELT BRICKBOTTOM PLAN
Table X: Action Items: Coordinate public investment with private investment
ACTION STRATEGY
ACTION DETAILS
AGENTS
(LEAD/PARTNER)
4.1 Create and
expand
street grids
Ensure that reformed zoning includes street standards for front streets, side streets and back
streets that include definitions, dimensional characteristics and performance standards.
City
Ensure that reformed zoning establishes a minimum land area dedicated as street or as civic
space.
City
Ensure that reformed zoning provides incentives unlocking additional development capacity
for owners who dedicate essential streets.
City
Require or incent property owners to connect Joy Street to Linwood Street with at least one
new side street and one new back street as development occurs
City, property owners
Require or incent property owners to connect Chestnut Street to Linwood Street with at least
one new side street and one new back street as development occurs
City, property owners
Require or incent property owners to create a new east-west internal street in the vicinity of
First Avenue as development occurs.
City, property owners
Require or incent property owners to create a new east-west internal street west of Inner Belt
Road and south of the Tubes as development occurs.
City, property owners
4.2 Capture the
value of
transit
Partner with the MBTA and MassDOT to design and construct tie-in points for future pri
vately-funded access onto the Community Path, specifically where necessary to connect the
Inner Belt South sub-area to the Green Line station.
City, MBTA, MassDOT,
adjoining property owners
Encourage the private owners of 150 Inner Belt Road to construct an access point onto the
Community Path when the site is developed.
City, property owner
Encourage the private owners of 20 Chestnut Street to construct an access point onto the
Community Path when the site is redeveloped.
City, property owner
Partner with the MBTA to release MBTA property not needed for right-of-way near the Wash
ington Street Station for sale and redevelopment. Issue a Request for Proposals with devel
opment standards consistent with this Master Plan.
City, MBTA
Explore District Improvement Financing (DIF) as a tool to fund needed sewer and stormwater
improvements.
City
Explore federal Transportation Infrastructure Finance and Innovation Act (TIFIA) loan funding
to support construction of the Inner Belt—North Point bridge, leveraging Urban Ring transit
corridor opportunity. See also action 2.4.
City, MassDOT, City of
Cambridge, private sector
partners
Partner with the MBTA and MassDOT to prepare the Mystic Yard facility along New Washing
ton Street for more valuable transit-oriented development
City, MBTA, MassDOT,
adjoining property owners
4.3 Plan region
ally
Collaborate with the City of Boston and MBTA to create high-quality, walkable transit-orient
ed redevelopment around Sullivan Square complementing Inner Belt-Brickbottom goals
City, City of Boston,
MBTA
Collaborate with the City of Cambridge on the North Point master development and transpor
tation links.
City, City of Cambridge
Collaborate with the City of Cambridge and private sector/institutions to ensure the high-cost
life sciences and technology industries in Kendall Square have access to lower-cost back
office and manufacturing space in Inner Belt and Brickbottom.
City, City of Cambridge,
private sector and insti
tutions
Advocate with state and regional agencies to ensure that limited roadway systems capacity is
used judiciously to support sustainable regional economic growth.
City, MAPC, MassDOT,
MBTA
4 COORDINATE PUBLIC INVESTMENT WITH PRIVATE INVESTMENT
PUTTING THE PLAN TO WORK | 107
ACTION TIMEFRAME
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
108 | INNER BELT BRICKBOTTOM PLAN
Table X: Action Items: Deliver ongoing value with sustainable development approaches
ACTION STRATEGY
ACTION DETAILS
AGENTS
(LEAD/PARTNER)
5.1 Pursue
sustainable
development
practices
Encourage new development to meet or exceed LEED Silver standards or equivalent. In
general, encourage construction techniques that are resource- and energy-efficient, minimize
detrimental environmental impacts, and promote public health.
City, property owners,
developers
Encourage transit-oriented development and design.
City
Highlight sustainable development and design achievements in marketing and branding for
Inner Belt and Brickbottom
City, Somerville
Chamber of Com
merce and/or other
business partners
5.2 Manage
stormwater
efficiently
and effec
tively
Ensure that the MBTA and MassDOT construct high-capacity stormwater infrastructure with
the Green Line Extension, including the Washington Street Pump Station, the Green Line de
tention cistern, the Red Bridge detention pond, and Maintenance Facility site improvements
as needed.
City, MBTA, MassDOT
Partner with the MBTA and MWRA to perform drainage capacity modelling, and improve in
frastructure as needed, to ensure that the Inner Belt and Brickbottom districts can support the
buildout of transit-oriented development called for in the SomerVision Comprehensive Plan.
City, MBTA, MWRA
Ensure that responsible parties resolve issues related to the blocked Old Stone Culvert at
the Boston Engine Terminal, and convey all upstream flows out of the Inner Belt district via
the MWRA sewer at Roland Street or the MBTA Fitchburg main drain. Coordinate with Green
Line Maintenance Facility design and construction.
City, MBTA, MWRA,
other partners as needed
Reform zoning to include performance standards for on-site stormwater retention for new
buildings, and opportunity for district-scale stormwater management.
City
Develop incentive programs to promote retrofitting of existing buildings for better stormwater
performance, including rooftop storage.
City
Design and build new civic spaces that increase stormwater retention in the district (po
tentially serving district-scale needs) while also providing amenities with aesthetic and/or
recreational value.
City, property owners,
developers
Explore creation of a Citywide stormwater enterprise fund.
City
5.3 Promote
choice in
housing
Partner with the private owner of the Cobble Hill Apartments to extend affordability provi
sions in perpetuity.
City, property owner
Partner with the private owner of the Cobble Hill Apartments to extend affordability provi
sions in perpetuity.
City, property owner
Ensure that new zoning regulations allow multiple residential building types, including town
house buildings and vertical apartment towers
City
Revise the City’s Inclusionary Housing Ordinance to require either a greater percentage of
affordable units in new residential development projects, or a greater number of family-sized
units.
City
5.4 Manage
transporta
tion demand
Create a Transportation Management Association empowered to manage parking resources,
including access coordination, hours of operation, pricing, security, lighting, advertising,
maintenance and insurance.
City, property and
business owners
Partner with the MBTA, MassDOT, other agencies and private sector partners to develop a
business plan for high quality transit service to connect Sullivan Square to Kendall Square
and beyond via a new Inner Belt—North Point bridge. Coordinate with Urban Ring transit
corridor planning to date.
City, MassDOT, MBTA,
private sector/institu
tion partners, Cities of
Boston and Cambridge
5 DELIVER ONGOING VALUE WITH SUSTAINABLE DEVELOPMENT APPROACHES
PUTTING THE PLAN TO WORK | 109
ACTION TIMEFRAME
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024