CIP Project List Winter 2019_Water Sewer memo FINAL — File 207768
To:
H
From: Jo
Re:
M
Date: M
This mem
to the Cit
2019 CIP
the forma
Format c
1. IM
fu
In
C
A
2. P
sp
en
th
3. T
Honorable Ci
ohn DeLuca
March 2019 W
March 26, 20
mo accompa
ty Council o
P project list
at of the list
changes inc
MPORTAN
unded out of
nvestment Pl
CIP project li
A General Fu
revious vers
pending on c
ngineering, a
hose column
There are two
a. Year
added
City C
Unsch
Under
for de
b. Appr
been a
a chec
note th
wheth
blank,
CITY OF
ity Council
, Director of
Water & Sew
019
anies the Wat
on March 26,
t contains sig
– which are
clude:
NT: Projects
f the Water &
lan (CIP) pro
ist or separat
und CIP proj
sions of the C
construction
and/or const
ns and provid
o new colum
Added to th
d to the CIP p
Council in N
heduled cate
rway, Recurr
efinitions of t
oved by Cit
approved by
ck mark in th
he portion th
her the projec
, the Admini
SOMERV
JOSEPH
f Water & Se
wer Capital I
ter & Sewer
, 2019. Com
gnificant upd
detailed bel
related to ou
& Sewer Ent
oject list. Th
tely as the W
ect list is for
CIP project l
or purchase
truction man
des a single e
mns in this ve
he CIP: Thi
project list in
November 20
gory but tha
ring, or Reco
the CIP proj
ty Council:
y the City Co
his column. I
hat has been
ct has been a
istration has
VILLE, MA
A. CURTAT
MAYOR
ewer, and Ri
Investment P
r Capital Inv
mpared to the
dates – both
low.
ur water and
terprise Fund
hese will be r
Water CIP pr
rthcoming.
list had two
es and one fo
nagement (CM
estimated sp
ersion of the
s column ind
n its current
016. Projects
at are now in
ommended)
ect categorie
This column
ouncil. If the
If a portion o
approved. F
approved in
not yet requ
ASSACHUS
TONE
ich Raiche, D
Plan (CIP) P
vestment Plan
e June 2018 C
to the projec
d sewer infra
ds are now i
referred to jo
roject list and
columns for
or estimated
M). This ver
pend for the e
CIP:
dicates the c
form, which
that were or
n a scheduled
are noted w
es.
n indicates w
full project
of the projec
For recurring
the current f
uested fundin
SETTS
Director of E
Project List
n (CIP) proj
CIP project
cts included
astructure tha
in a separate
ointly as the
d the Sewer
r each year: o
spending on
rsion of the
entire projec
calendar year
h was first sh
riginally add
d category (U
with an asteri
whether or no
has been ap
ct has been a
g investment
fiscal year. I
ng for the pr
Engineering
ect list subm
list, the Mar
on the list a
at are primar
Capital
e Water & Se
CIP project
one for estim
n design,
CIP combin
ct in a given
r a project w
hared with th
ded in the
USQ DIF,
isk. See belo
ot a project h
pproved, ther
approved, we
ts, we note
If the cell is
roject.
mitted
rch
and to
rily
ewer
list.
mated
nes
year.
was
he
ow
has
re is
e
2
Updates to the projects and/or the project spend schedules include:
1. All spending that occurs in FY20 and beyond has been escalated by 4% per year to reflect
the inflation in horizontal construction costs observed throughout the Greater Boston
region.
2. All spend schedules for projects included in the June 2018 CIP project list have been
updated to reflect our current best projection of when those projects will take place.
3. As Director of Engineering Rich Raiche discussed during the Water & Sewer
Infrastructure Capital Needs presentation on February 26, 2019, the Water Improvements
recurring investment has been increased from $1.5 million to $5 million in construction
costs per year (in 2019 dollars) starting in FY20 plus $1.5 million for design and
construction oversight, for a total of $6.5 million. Similarly, the Sewer Improvements
recurring investment has been increased from $1.5 million to $3 million in construction
costs per year (in 2019 dollars) starting in FY20 plus $900,000 for design and
construction oversight, for a total of $3.9 million.
4. Several projects have been added to the CIP project list in the Recommended category:
Water projects added to the CIP include:
a. Pitman Street – Water improvements. This project will eliminate an existing
dead-end water main in Pitman Street that is causing water quality issues.
b. Water Meter Replacement Program. The vast majority of the City’s water
meters were installed in 2009 or before, and it is an industry best practice to
replace meters every 10 years to ensure accurate readings.
Sewer projects added to the CIP include:
a. Manhole Sealing. Engineering undertook a study in 2017-2018 that demonstrated
significant inflow into and infiltration through the City’s 4,448 manholes. This
project, funded in large part through a MWRA grant, will address any deficiencies
in our manholes identified in that assessment and eliminate this source of inflow
and infiltration.
b. Sewer System Evaluation Survey (SSES) & Inflow/Infiltration (I/I)
Assessment. As discussed in the February 2019 Water & Sewer Infrastructure
Capital Needs presentation noted above, gathering additional data and information
on the deficiencies of our sewer system is essential to informing the Sewer CIP
moving forward. The sewer system evaluation survey (SSES) and inflow and
infiltration (I/I) assessment recommended in the Sewer CIP project list will
provide us with the detailed information needed.
c. Willow to Grove Sewer Replacement. This project will replace the failing sewer
pipe that currently extends along the Community Path on private property
between Willow and Grove Streets with a new sewer pipe in the public right of
way.
d. Flint St. Sewer Replacement. This project will replace a failing sewer pipe that
currently exists on private property with a new sewer pipe in the public right of
way.
3
e. Sewer Separation Projects 1, 2, and 3. Several major sewer separation projects
must be undertaken, and the information that will be provided through the SSES
& I/I Assessment and the system modeling discussed at the February 2019 Water
& Sewer Infrastructure Capital Needs presentation noted above will provide
essential information on which locations are the highest priority and better inform
cost estimates. This version of the Sewer CIP project list therefore includes
placeholder funding amounts for three major sewer separation projects with the
expectation that these projects will be defined through planning efforts in FY2020
and FY2021.
Project category definitions:
When the CIP project list was first introduced in its current form in November 2016, each project
was assigned to a category. Definitions of each of these categories are provided below for
reference.
USQ DIF (formerly Critical) projects are those included in or related to the Union
Square District Improvement Financing (DIF) development program. These projects are a
prerequisite for attracting outside investments in the transformative district in part
because they unlock future revenue that would otherwise go untapped. For Water &
Sewer, this category includes (but is not limited to) the Somerville Ave. Utility &
Streetscape Improvements project as well as Poplar St. Stormwater Pump Station, which
involves the construction of a pump station and associated infrastructure to connect to the
GLX stormwater drain.
Recurring projects are investments the City has made and will continue making to
maintain existing assets. These are considered recurring because they are invested in on a
regular basis, and in any modelled projection the City Council will be asked to make
these appropriations so that the City can continue to provide core services.
Underway projects are currently ongoing but not yet completed. These projects have
been authorized in full or in part by the City Council or have received funding from other
sources. Note that USQ DIF projects can also be Underway.
Recommended projects are those identified by the Administration as important projects
to undertake in the coming years because they respond to a community need, address a
public health or safety issue, or advance Underway or USQ DIF projects.
Unscheduled projects are community priorities and identified needs or liabilities that
currently have no assigned timetable. These projects have been put forth by the
community, the City Council, or the Administration.