Matters ▸ Attachment
RESOLUTION - GLX-2 — File 207736
WHEREAS:
The Green Line Extension through Cambridge, Somerville and Medford is
a long-awaited transformative project for these communities, bringing
seven new stations to underserved, low- and moderate-income
neighborhoods, thereby connecting them to the economic, cultural and
educational institutions of Boston, and bringing long-delayed promised
environmental improvements; and
WHEREAS:
New England winter weather is challenging with snow, sleet, freezing
rain, ice, and wind; and
WHEREAS:
Future riders will have a variety of predictable and unpredictable
accessibility needs, such as use of wheelchairs, walkers, strollers, canes,
and limited sight, balance and strength; and
WHEREAS:
Due to hilly sidewalks, narrow rights-of-way, steeply sloped bridges over
the tracks, and other existing conditions, this project presents unique
design and engineering challenges; and
WHEREAS:
Significant cuts were made to elements of the stations that provided
accessibility to those riders with mobility impairments or limitations, as
well as protection from the weather and safety for those and other riders;
and
WHEREAS:
Specific ADA-compromised design decisions were made to save money,
such as:
• Staircases have roofs, but lack enclosures to make them safe and to
protect users from the elements;
• Entrances to the stations are serpentine and unduly long and not in
the best or even reasonable locations;
• Entrances are sited on steep, non-ADA-compliant streets;
• Pathways, station approaches and entrance walkways are often too
narrow for the level of ridership and for people with mobility
issues;
• Elevators were cut from the plans and replaced with long, steep
ramps that will be unworkable for some riders with disabilities;
• Station platforms and staircases are in close proximity to the
commuter rail/Amtrak tracks with trains that are permitted to travel
up to 60 MPH, exposing riders to noise, wind, startle factors, dust,
particulate matter and vibrations from passing trains; NOW,
THEREFORE, BE IT
RESOLVED:
That the Somerville City Council urges MassDOT, the MBTA, the GLX
Project Team, GLX Constructors and the City of Somerville to work
collaboratively with residents and community groups to improve the
accessibility, safety, and usability -- especially for people with mobility
impairments -- of the seven new GLX stations; AND BE IT FURTHER
RESOLVED:
That a copy of this Resolution be presented to John Dalton, Program
Manager of the MBTA GLX Project, Governor Charles D. Baker,
Somerville Mayor Joseph Curtatone, Secretary of Transportation
Stephanie Pollack, Congresswoman Ayanna Pressley and the MBTA’s
Fiscal Control Board, and the Somerville delegation in the State
Legislature on behalf of the Somerville City Council.