Matters ▸ Attachment
LOI Exhibit D - Conceptual Drawings of Encroachment of DPW Facility on MBTA ... — File 207949
40
40
36
36
36
36
38
38
38
38
42
42
44
44
46
46
46
46
312+00.00
313+00.00
314+00.00
312+00.00
313+00.00
314+00.00
168+00.00
169+00.00
170+00.00
J
J
D
D
D
D
D
S
S
S
DIV
TEMP ROW
EASEMENT
4" HDPE UNDERDRAIN
DRAINAGE NIP (DP 11)
UTILITY POLE TO BE
REMOVED
4" HDPE UNDERDRAIN
INVERT=45.80
PORTION OF EXISTING 12"
WATER MAIN TO BE RELOCATED.
SEE SHEET RWS-U-6001.
NOISE BARRIER N-10 NIP (DP19)
4" HDPE UNDERDRAIN
ROW
RETAINING WALL ME-2
SOLDIER PILE WITH
DRILLED SHAFT TYP
DRAINAGE NIP (DP 11)
SANITARY SEWER SIPHON NIP
(DP 11)
OCS FOUNDATION TYP NIP
(DP 54)
DRAINAGE NIP (DP 11)
ROW
PROPOSED C NH-T1
L
PROPOSED C NH-T2
L
PROPOSED C MB-EB
L
PROPOSED C MB-WB
L
10'-0"
TYP
UNO
UTILITY POLE TO BE
REMOVED
12'-0"
11"
4.72'
3.09'
3.84'
3.01'
8'-0"
11 3/4"
SOMERVILLE DEPARTMENT OF
PUBLIC WORKS BUILDING
SOMERVILLE DEPARTMENT OF
PUBLIC WORKS BUILDING
EXISTING SANITARY SEWER
SIPHON TO BE RELOCATED
KINK POINT
MB-EB STA 312+98.22
OFFSET 42.62
N: 2969321.98
E: 762246.76
11.41'
8.50' MIN
REQUIRED
KINK POINT
MB-EB STA 311+89.14
OFFSET 43.21
N: 2969225.43
E: 762299.45
11.90'
2.84'
SEE NOTE 5
SEE NOTE 5
45
44
4" HDPE UNDERDRAIN
INVERT=42.8
PERMANENT GROUND ANCHOR TYP
45'-0" MAX
TYP
SPL RETAINING WALL ME-2 PLAN
ISSUE
DATE
DESCRIPTION
BY
CHK'D
APP.
SCALE:
DATE:
DRAWN
BY
DESIGN
BY
CHECK
BY
ISSUE
SHEET:
PLAN NO.:
MBTA CONTRACT NO. E22CN07
CAMBRIDGE / SOMERVILLE / MEDFORD,
MASSACHUSETTS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
GREEN LINE EXTENSION PROJECT
PLOTTED: 01/11/19 4:18PM BY:PFEIFECM
DRAWING: I:\PROJECTS\4019139\4019139_0001\90_CAD MODELS AND SHEETS\18B RET & NOISE WALL MB_SEG 4\06_S_STRUCTURAL\SHEETS\RWS-S-2012.DWG [RWS-S-2012] 01/11/19 3:49PM
PRE-RELEASE FOR CONSTRUCTION
DESIGN PACKAGE:
18B (RWS)
WALL ME-2 PLAN
SHEET 2 OF 5
RWS-S-2012
CMP
ARG
ARG
12/19/18
AS NOTED
NOT
AUTHORIZED
FOR
CONSTRUCTION
B
S-4013
MATCHLINE - SEE SHEET RWS-S-2013 FOR CONTINUATION
MATCHLINE - SEE SHEET RWS-S-2011 FOR CONTINUATION
BERWICK ST
0
10'
5'
10'
1.
SEE SHEETS RWS-G-0501, RWS-S-1001, AND RWS-S-1002 FOR GENERAL
NOTES.
2.
SEE SHEET RWS-S-3014 FOR RETAINING WALL ELEVATION.
3.
SEE SHEET RWS-S-4001 FOR RETAINING WALL TYPICAL SECTIONS.
4.
SEE SHEETS RWS-S-8001 AND RWS-S-8002 FOR RETAINING WALL DETAILS.
5.
A 250 PSF SURCHARGE LOADING WAS USED IN THE DESIGN OF THIS WALL TO
ACCOUNT FOR RESIDENTIAL BUILDINGS WITHIN THE WALL'S ZONE OF
INFLUENCE.
6.
A 1.4 KSF FOUNDATION SURCHARGE LOADING AND A 250 PSF GROUND
FLOOR LIVE LOAD SURCHARGE LOADING WAS USED IN THE DESIGN OF THIS
WALL TO ACCOUNT FOR THE SOMERVILLE DPW BUILDING WITHIN THE WALL'S
ZONE OF INFLUENCE.
7.
SPL RETAINING WALL ME-2 SEQUENCE OF CONSTRUCTION IN FRONT OF
SOMERVILLE DPW BUILDING:
7.1.
INSTALL DRILLED SHAFT FOUNDATIONS AND THEN WALL PILES.
7.2.
INSTALL TEMPORARY WALL BRACING TO SUPPORT REQUIRED
EXCAVATION FOR DRAINAGE PIPES IN FRONT OF WALL. ONCE THIS
EXCAVATION HAS BEEN SUITABLY BACKFILLED, TEMPORARY WALL
BRACING WILL BE REMOVED.
8.
SEQUENCE OF CONSTRUCTION FOR SEGMENTS OF WALL NOT IN FRONT OF
DPW BUILDING SIMILAR, BUT NO TEMPORARY WALL BRACING IS REQUIRED
DURING INSTALLATION OF DRAINAGE IN FRONT OF WALL.
NOTES:
41' MAX
300 SF
EXHIBIT D - CONCEPTUAL DRAWINGS OF
ENCHROACHMENT OF DPW FACILITY ON MBTA ROW
SHEET 1 OF 5
40
34
34
34
34
36
36
38
38
42
44
D
315+00.00
316+00.00
315+00.00
316+00.00
171+00.00
172+00.00
J
J
ROW
TEMP ROW
EASEMENT
REMOVE EXISTING 18"
PVC AND MANHOLE
4" HDPE UNDERDRAIN
NOISE BARRIER
N-10 NIP (DP19)
SOLDIER PILE WITH
DRILLED SHAFT TYP
DRAINAGE NIP (DP 11)
RETAINING WALL ME-2
OCS FOUNDATION TYP NIP (DP 54)
DRAINAGE NIP (DP 11)
ROW
FOR DRAINAGE OUTLET
TO DPW BUILDING, SEE
SHEET RWS-U-2002
PROPOSED C NH-T1
L
PROPOSED C NH-T2
L
PROPOSED C MB-EB
L
PROPOSED C MB-WB
L
8'-0"
TYP
UNO
6'-0"
6'-0"
2.93'
2.61'
0.20'
END NOISE BARRIER N-10
MOUNTED ATOP RETAINING WALL ME-2
MB-EB STA 314+51.94
N: 2969455.79
E: 762170.83
SOMERVILLE DEPARTMENT
OF PUBLIC WORKS BUILDING
8.50' MIN
REQUIRED
KINK POINT
MB-EB STA 315+67.87
OFFSET 40.94
N: 2969556.56
E: 762113.10
9.70'
2.53'
KINK POINT
MB-EB STA 314+91.94
OFFSET 41.54
N: 2969490.63
E: 762150.89
9.77'
2.23'
SOMERVILLE DEPARTMENT OF
PUBLIC WORKS BUILDING
KINK POINT
MB-EB STA 314+35.94
OFFSET 41.61
N: 2969441.85
E: 762178.39
9.70'
2.20'
4" HDPE UNDERDRAIN
INVERT=38.7
CONNECT TO TRACK
DRAINAGE
PERMANENTGROUND ANCHOR TYP
45'-0" MAX
TYP
SPL RETAINING WALL ME-2 PLAN
ISSUE
DATE
DESCRIPTION
BY
CHK'D
APP.
SCALE:
DATE:
DRAWN
BY
DESIGN
BY
CHECK
BY
ISSUE
SHEET:
PLAN NO.:
MBTA CONTRACT NO. E22CN07
CAMBRIDGE / SOMERVILLE / MEDFORD,
MASSACHUSETTS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
GREEN LINE EXTENSION PROJECT
PLOTTED: 01/11/19 4:20PM BY:PFEIFECM
DRAWING: I:\PROJECTS\4019139\4019139_0001\90_CAD MODELS AND SHEETS\18B RET & NOISE WALL MB_SEG 4\06_S_STRUCTURAL\SHEETS\RWS-S-2013.DWG [RWS-S-2013] 01/11/19 3:56PM
PRE-RELEASE FOR CONSTRUCTION
DESIGN PACKAGE:
18B (RWS)
WALL ME-2 PLAN
SHEET 3 OF 5
RWS-S-2013
CMP
ARG
ARG
12/19/18
AS NOTED
NOT
AUTHORIZED
FOR
CONSTRUCTION
A
S-4013
MATCHLINE - SEE SHEET RWS-S-2014 FOR CONTINUATION
MATCHLINE - SEE SHEET RWS-S-2012 FOR CONTINUATION
1.
SEE SHEETS RWS-G-0501, RWS-S-1001, AND RWS-S-1002 FOR GENERAL NOTES.
2.
SEE SHEET RWS-S-3013 FOR RETAINING WALL ELEVATION.
3.
SEE SHEET RWS-S-4001 FOR RETAINING WALL TYPICAL SECTIONS.
4.
SEE SHEETS RWS-S-8001 AND RWS-S-8002 FOR RETAINING WALL DETAILS.
5.
A 1.4 KSF FOUNDATION SURCHARGE LOADING AND A 250 PSF GROUND FLOOR
LIVE LOAD SURCHARGE LOADING WAS USED IN THE DESIGN OF THIS WALL TO
ACCOUNT FOR THE SOMERVILLE DPW BUILDING WITHIN THE WALL'S ZONE OF
INFLUENCE.
6.
SPL RETAINING WALL ME-2 SEQUENCE OF CONSTRUCTION IN FRONT OF
SOMERVILLE DPW BUILDING:
6.1.
INSTALL DRILLED SHAFT FOUNDATIONS AND THEN WALL PILES.
6.2.
INSTALL TEMPORARY WALL BRACING TO SUPPORT REQUIRED EXCAVATION
FOR DRAINAGE PIPES IN FRONT OF WALL. ONCE THIS EXCAVATION HAS
BEEN SUITABLY BACKFILLED, TEMPORARY WALL BRACING WILL BE
REMOVED.
NOTES:
0
10'
5'
10'
41' MAX
9,900 SF
EXHIBIT D - CONCEPTUAL DRAWINGS OF
ENCHROACHMENT OF DPW FACILITY ON MBTA ROW
SHEET 2 OF 5
40
32
32
32
32
34
34
36
36
38
42
D
317+00.00
318+00.00
319+00.00
317+00.00
318+00.00
319+00.00
173+00.00
174+00.00
175+00.00
J
J
4" HDPE UNDERDRAIN
4" HDPE UNDERDRAIN
INVERT=40.1
TEMP ROW
EASEMENT
REMOVING EXISTING 18" PVC
AND MANHOLE
4" HDPE UNDERDRAIN
ROW
SOLDIER PILE WITH
DRILLED SHAFT TYP
DRAINAGE NIP (DP 11)
RETAINING WALL ME-2
DRAINAGE NIP (DP 11)
ROW
OCS FOUNDATION TYP NIP (DP 54)
FOR DRAINAGE OUTLET
TO DPW BUILDING, SEE
SHEET RWS-U-2001
PROPOSED C NH-T1
L
PROPOSED C NH-T2
L
PROPOSED C MB-EB
L
PROPOSED C MB-WB
L
8'-0"
TYP
UNO
7'-0"
7'-0"
7'-0"
6'-0"
2.76'
2.78'
SOMERVILLE DEPARTMENT OF
PUBLIC WORKS
KINK POINT
MB-EB STA 318+26.48
OFFSET 40.01
N: 2969780.89
E: 761983.65
9.63'
2.38'
5 3/4"
BUILDING
8.50' MIN
REQUIRED
PERMANENT GROUND ANCHOR TYP
45'-0" MAX
TYP
SPL RETAINING WALL ME-2 PLAN
ISSUE
DATE
DESCRIPTION
BY
CHK'D
APP.
SCALE:
DATE:
DRAWN
BY
DESIGN
BY
CHECK
BY
ISSUE
SHEET:
PLAN NO.:
MBTA CONTRACT NO. E22CN07
CAMBRIDGE / SOMERVILLE / MEDFORD,
MASSACHUSETTS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
GREEN LINE EXTENSION PROJECT
PLOTTED: 01/11/19 4:23PM BY:PFEIFECM
DRAWING: I:\PROJECTS\4019139\4019139_0001\90_CAD MODELS AND SHEETS\18B RET & NOISE WALL MB_SEG 4\06_S_STRUCTURAL\SHEETS\RWS-S-2014.DWG [RWS-S-2014] 01/11/19 4:09PM
PRE-RELEASE FOR CONSTRUCTION
DESIGN PACKAGE:
18B (RWS)
WALL ME-2 PLAN
SHEET 4 OF 5
RWS-S-2014
CMP
ARG
ARG
12/19/18
AS NOTED
NOT
AUTHORIZED
FOR
CONSTRUCTION
MATCHLINE - SEE SHEET RWS-S-2015 FOR CONTINUATION
MATCHLINE - SEE SHEET RWS-S-2013 FOR CONTINUATION
A
S-4013
0
10'
5'
10'
1.
SEE SHEETS RWS-G-0501, RWS-S-1001, AND RWS-S-1002 FOR GENERAL NOTES.
2.
SEE SHEET RWS-S-3012 FOR RETAINING WALL ELEVATION.
3.
SEE SHEET RWS-S-4001 FOR RETAINING WALL TYPICAL SECTIONS.
4.
SEE SHEETS RWS-S-8001 AND RWS-S-8002 FOR RETAINING WALL DETAILS.
5.
A 1.4 KSF FOUNDATION SURCHARGE LOADING AND A 250 PSF GROUND FLOOR
LIVE LOAD SURCHARGE LOADING WAS USED IN THE DESIGN OF THIS WALL TO
ACCOUNT FOR THE SOMERVILLE DPW BUILDING WITHIN THE WALL'S ZONE OF
INFLUENCE.
6.
SPL RETAINING WALL ME-2 SEQUENCE OF CONSTRUCTION IN FRONT OF
SOMERVILLE DPW BUILDING:
6.1.
INSTALL DRILLED SHAFT FOUNDATIONS AND THEN WALL PILES.
6.2.
INSTALL TEMPORARY WALL BRACING TO SUPPORT REQUIRED EXCAVATION
FOR DRAINAGE PIPES IN FRONT OF WALL. ONCE THIS EXCAVATION HAS
BEEN SUITABLY BACKFILLED, TEMPORARY WALL BRACING WILL BE
REMOVED.
NOTES:
41' MAX
9,350 SF
EXHIBIT D - CONCEPTUAL DRAWINGS OF
ENCHROACHMENT OF DPW FACILITY ON MBTA ROW
SHEET 3 OF 5
30
30
40
32
32
34
34
36
36
38
38
42
D
D
D
D
320+00.00
320+00.00
176+00.00
177+00.00
J
NOISE BARRIER N-11 NIP (DP 16)
4" HDPE UNDERDRAIN
INVERT=37.2
TEST PIT EXISTING WATER MAIN.
IF THERE IS A CONFLICT WITH
PROPOSED WALL, CUT AND CAP MAIN
BEHIND WALL.
REMOVE EXISTING 18"
PVC AND MANHOLE
4" HDPE UNDERDRAIN
TEMP ROW
EASEMENT
ROW
END RETAINING WALL ME-2
MB-EB 320+62.75
OFFSET 40.19
N: 2969985.64
E: 761865.74
OCS FOUNDATION TYP
NIP (DP 54)
RETAINING WALL ME-2
DRAINAGE NIP
(DP 11)
DRAINAGE NIP (DP 11)
ROW
FOR DRAINAGE OUTLET
TO DPW BUILDING, SEE
SHEET RWS-U-2001
PROPOSED C NH-T1
L
PROPOSED C NH-T2
L
PROPOSED C MB-EB
L
PROPOSED C MB-WB
L
9.83'
SOLDIER PILE IN DRILLED SHAFT TYP
3.74'
8'-0"
TYP
2.13'
BEGIN NOISE BARRIER N-11
MOUNTED ATOP RETAINING WALL ME-2
MB-EB STA 320+18.48
N: 2969947.09
E: 761887.49
2.50'
KINK POINT
MB-EB 320+10.48
OFFSET 39.69
N: 2969940.12
E: 761894.42
9.33'
2.02'
SOMERVILLE DEPARTMENT OF
PUBLIC WORKS BUILDING
SEE NOTE 5
PERMANENT
GROUND ANCHOR
SPL RETAINING WALL ME-2 PLAN
ISSUE
DATE
DESCRIPTION
BY
CHK'D
APP.
SCALE:
DATE:
DRAWN
BY
DESIGN
BY
CHECK
BY
ISSUE
SHEET:
PLAN NO.:
MBTA CONTRACT NO. E22CN07
CAMBRIDGE / SOMERVILLE / MEDFORD,
MASSACHUSETTS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
GREEN LINE EXTENSION PROJECT
PLOTTED: 01/11/19 4:25PM BY:PFEIFECM
DRAWING: I:\PROJECTS\4019139\4019139_0001\90_CAD MODELS AND SHEETS\18B RET & NOISE WALL MB_SEG 4\06_S_STRUCTURAL\SHEETS\RWS-S-2015.DWG [RWS-S-2015] 01/11/19 4:18PM
PRE-RELEASE FOR CONSTRUCTION
DESIGN PACKAGE:
18B (RWS)
WALL ME-2 PLAN
SHEET 5 OF 5
RWS-S-2015
CMP
ARG
ARG
12/19/18
AS NOTED
NOT
AUTHORIZED
FOR
CONSTRUCTION
MATCHLINE - SEE SHEET RWS-S-2014 FOR CONTINUATION
A
S-4001
B
S-4001
6
S-8012
0
10'
5'
10'
1.
SEE SHEETS RWS-G-0501, RWS-S-1001, AND RWS-S-1002 FOR GENERAL NOTES.
2.
SEE SHEET RWS-S-3011 FOR RETAINING WALL ELEVATION.
3.
SEE SHEET RWS-S-4001 FOR RETAINING WALL TYPICAL SECTIONS.
4.
SEE SHEETS RWS-S-8001 AND RWS-S-8002 FOR RETAINING WALL DETAILS.
5.
A 1.4 KSF FOUNDATION SURCHARGE LOADING AND A 250 PSF GROUND FLOOR LIVE
LOAD SURCHARGE LOADING WAS USED IN THE DESIGN OF THIS WALL TO
ACCOUNT FOR THE SOMERVILLE DPW BUILDING WITHIN THE WALL'S ZONE OF
INFLUENCE.
6.
FOR RETAINING WALL ME-2, DRAINAGE TO BE PROVIDED AFTER RETAINING WALL
CONSTRUCTION WITHOUT THE USE OF TEMPORARY EXCAVATION SUPPORT.
7.
SPL RETAINING WALL ME-2 SEQUENCE OF CONSTRUCTION IN FRONT OF
SOMERVILLE DPW BUILDING:
7.1.
INSTALL DRILLED SHAFT FOUNDATIONS AND THEN WALL PILES.
7.2.
INSTALL TEMPORARY WALL BRACING TO SUPPORT REQUIRED EXCAVATION
FOR DRAINAGE PIPES IN FRONT OF WALL. ONCE THIS EXCAVATION HAS BEEN
SUITABLY BACKFILLED, TEMPORARY WALL BRACING WILL BE REMOVED.
8.
SEQUENCE OF CONSTRUCTION FOR SEGMENTS OF WALL NOT IN FRONT OF DPW
BUILDING SIMILAR, BUT NO TEMPORARY WALL BRACING IS REQUIRED DURING
INSTALLATION OF DRAINAGE IN FRONT OF WALL.
NOTES:
45'-0" MAX
TYP
41' MAX
3,600 SF
EXHIBIT D - CONCEPTUAL DRAWINGS OF
ENCHROACHMENT OF DPW FACILITY ON MBTA ROW
SHEET 4 OF 5
TEMP ROW
EASEMENT
ROW
SOMERVILLE DPW
BUILDING EDGE OF
FOOTING
SOMERVILLE DPW
BUILDING
ISSUE
DATE
DESCRIPTION
BY
CHK'D
APP.
SCALE:
DATE:
DRAWN
BY
DESIGN
BY
CHECK
BY
ISSUE
SHEET:
PLAN NO.:
MBTA CONTRACT NO. E22CN07
CAMBRIDGE / SOMERVILLE / MEDFORD,
MASSACHUSETTS
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
GREEN LINE EXTENSION PROJECT
PLOTTED: 10/11/18 2:49PM BY:PFEIFECM
DRAWING: I:\PROJECTS\4019139\4019139_0001\90_CAD MODELS AND SHEETS\18 RET & NOISE WALL MB_SEG 4\06_S_STRUCTURAL\WORKING\RWS-S-2144_FOOTING ROW.DWG [RWS-S-2144] 10/11/18 2:12PM
INTERMEDIATE
DESIGN PACKAGE:
18 (RWS)
SOMERVILLE DPW BLDG PLAN
MB-EB STA 317+00
XXXXXX
CMP
ARG
ARG
10/01/18
AS NOTED
NOT
AUTHORIZED
FOR
CONSTRUCTION
1.
FOR TYPICAL SECTION AT THIS LOCATION SHOWING LIMITS OF TIEBACK
BEYOND THE RIGHT-OF-WAY, SEE ATTACHED CROSS SECTION FROM MB-EB
STA 317+00.
2.
PLAN VIEW SHOWN AT LOCATION WHERE TRANSITION OF DPW BULDING
FOOTING DEPTH WAS ENCOUNTERED.
NOTES:
SOMERVILLE DPW BUILDING / RIGHT-OF-WAY PLAN
0
1"=10'
10'
5'
10'
SOMERVILLE DPW FOOTING
ENCROACHMENT ONTO MBTA ROW
VARIES FROM 2 1/2" TO 10 7/8" FOR 600'
EXHIBIT D - CONCEPTUAL DRAWINGS OF
ENCHROACHMENT OF DPW FACILITY ON MBTA ROW
SHEET 5 OF 5