Matters ▸ Attachment
Passive House Presentation — File 208316
PASSIVE HOUSE:
THE WORLD’S MOST ENERGY EFFICIENT PERFORMANCE STANDARD
WHAT IT IS
THE HIGHEST ENERGY STANDARD
WE CAN INFLUENCE THE FUTURE
WHY ARE BUILDINGS SO IMPORTANT?
PASSIVE HOUSE:
THE WORLD’S MOST ENERGY EFFICIENT PERFORMANCE STANDARD
Goal: lower consumption
Radically reduce energy demand
Requirements: measurable criteria
Meet a specifically low energy budget
THE STANDARD How does this Compare?
WHAT IT IS NOT
HOLISTIC SUSTAINABLE DESIGN:
LEED, Living Building Challenge
Site
18%
Materials
13%
Water
12%
Location
8%
Energy
32%
IEQ
17%
WHAT IT IS
FOUNDATION FOR NET ZERO :
Minimize Load + Produce
#1
#2
with with
Passive House Renewable Energy
CONSUMPTION GENERATION
EXAMPLES
International Commercial
EXAMPLES
International School/University
EXAMPLES
International Multifamily/Hotel
EXAMPLES
International Retrofit
EXAMPLES
US Multifamily
EXAMPLES
US Commercial/Educational
ROCKY MOUNTAIN INSTITUTE
CENTER FOR DESIGN RESEARCH – UNIV OF KANSAS
CORNELL TECH RES. HALL - NY
THE STANDARD Radical Simplicity
Credit: Albert Righter Tittmann Architects
THE STANDARD Measurable Criteria
= Miles Per Gallon for the Building
= Durability
= Carbon Footprint
Annual Space Heating/Cooling Demand
Airtightness
Primary Energy Demand
Heating and Cooling makes up
nearly 50% energy Demand
Distillery
Concord
High Performance Design– Building Inherent Value
LEED SCORE
BENEFITS
•
Reduced Carbon Footprint: Radically low energy
•
Comfortable: No drafts or temperature swings
•
Healthy: High Quality, Continuously filtered Air
•
Resilient: Extreme Thermal Stability
•
Affordable to Operate: Low Utility Bills for life
HOW DO YOU GET THERE?
Thermal Control
Air Tightness
Mechanical Systems
Lighting/Appliances/
Plug Loads
Drive Down Loads
Eliminate Infiltration
Test
Minimize thermal bridging
Optimize solar heat gain
Balanced Ventilation
Plan for Renewables
HOW DO YOU GET THERE? Drive Down Loads
Thermal Control
Air Tightness
Brooklyn Hts Passive House
Taken on a Freezing night, Winter 2012
HOW DO YOU GET THERE?
Thermal Control
BUILDING INHERENT VALUE
Re-Prioritize Costs
More $ - Envelope
Less $ - Mechanical Systems/ductwork
Always Saving- Low Operational Costs for the life of the Building
BUILDING INHERENT VALUE
Re-Prioritize Process
Integrated Design: Parts work together to maximize the whole
Builder as Partner: Attention to the CRAFT of building
Testing/Verification: To ensure execution/performance meets the intent
Commissioning/Reporting: Hold buildings accountable
BUILDING INHERENT VALUE
Re-Prioritize Values
Think Long Term: What is the life cycle of a building?
Policy and Financing: Incentives to help bridge the resource gap
Build for People: Healthy, Comfortable, Resilient
QUESTIONS?
Michelle Apigian
ICON Architecture
[email removed]