Matters ▸ Attachment
June 2019 General Fund CIP Project List memo — File 208460
To:
H
Re:
Ju
Date: Ju
This mem
to the Cit
CIP proje
format of
Format c
1. P
W
pr
se
re
2. P
sp
en
th
3. T
C
C
(617) 625-66
Honorable Ci
une 2019 Ge
une 13, 2019
mo accompa
ty Council o
ect list conta
f the list – w
changes inc
rojects relate
Water & Sew
roject list. T
eparately as
eceived the W
revious vers
pending on c
ngineering, a
hose column
There are thre
a. Year
added
City C
Unsch
Under
for de
b. Appr
been a
a chec
note th
wheth
Admin
c. Date A
to auth
CITY OF S
J
CITY HALL ● 9
00, EXT. 2100
ity Council
eneral Fund
9
anies the Gen
on June 13, 2
ains significa
which are det
clude:
ed to our wa
wer Enterpris
These will be
the Water C
Water & Sew
sions of the C
construction
and/or const
ns and provid
ee new colum
Added to th
d to the CIP p
Council in N
heduled cate
rway, Recurr
efinitions of t
oved by Cit
approved by
ck mark in th
he portion th
her the projec
nistration ha
Authorized
horize fundi
SOMERVI
JOSEPH A
M
3 HIGHLAND A
0 ● TTY: (866)
E-MAIL: m
Capital Inve
neral Fund C
2019. Compa
ant updates –
tailed below.
ater and sewe
se Funds are
e referred to j
CIP project li
wer CIP proj
CIP project l
or purchase
truction man
des a single e
mns in this v
he CIP: Thi
project list in
November 20
gory but tha
ring, or Reco
the CIP proj
ty Council:
y the City Co
his column. I
hat has been
ct has been a
as not yet req
by City Co
ing for a proj
ILLE, MA
A. CURTA
MAYOR
AVENUE ● SOM
808-4851● FA
mayor@some
estment Plan
Capital Inves
ared to the Ju
– both to the
.
er infrastruc
now in a sep
jointly as the
ist and the S
ject list on M
list had two
es and one fo
nagement (CM
estimated sp
version of th
s column ind
n its current
016. Projects
at are now in
ommended)
ect categorie
This column
ouncil. If the
If a portion o
approved. F
approved for
quested fund
ouncil: The c
ject. If the c
ASSACHU
ATONE
MERVILLE, MAS
AX: (617) 625-
ervillema.gov
n (CIP) Proje
stment Plan (
une 2018 CI
e projects inc
cture that are
parate Capit
e Water & S
ewer CIP pr
March 26, 20
columns for
or estimated
M). This ver
pend for the e
he CIP:
dicates the c
form, which
that were or
n a scheduled
are noted w
es.
n indicates w
full project
of the projec
For recurring
r FY20. If th
ding for the p
column indic
ell is blank,
USETTS
SSACHUSETTS 0
3434● www.s
ect List
(CIP) projec
IP project lis
cluded on th
e primarily fu
tal Investmen
Sewer CIP pr
roject list. Th
019.
r each year: o
spending on
rsion of the
entire projec
calendar year
h was first sh
riginally add
d category (U
with an asteri
whether or no
has been ap
ct has been a
g investment
he cell is blan
project.
cates when t
either the A
02143
omervillema.g
ct list submit
st, the June 2
e list and to
unded out of
nt Plan (CIP
roject list or
he Council
one for estim
n design,
CIP combin
ct in a given
r a project w
hared with th
ded in the
USQ DIF,
isk. See belo
ot a project h
pproved, ther
approved, we
ts, we note
nk, the
the Council v
Administratio
gov
tted
2019
the
f the
P)
r
mated
nes
year.
was
he
ow
has
re is
e
voted
on
2
has not yet requested funding or the Council has not yet voted on the
Administration’s funding request.
4. This version of the CIP project list only includes projects in a scheduled category (USQ
DIF, Recurring, Underway, or Recommended – see definitions below). Unscheduled
projects are tracked separately.
Updates to the projects and/or the project spend schedules include:
1. All spend schedules for projects included in the June 2018 CIP project list have been
updated to reflect our current best projection of when those projects will take place.
2. Funding sources have been expanded to more accurately capture the diversity of sources
we use to fund projects as well as our intention to incorporate more spending for our
recurring investments, especially those currently funded through Capital Stabilization, in
the General Fund operating budget over time. In FY20, for example, we are proposing to
increase our annual investment in street tree planting from $150,000 to $250,000, with
$150,000 proposed in the Public Space & Urban Forestry operating budget, and $100,000
proposed to come from Capital Stabilization.
3. Spring Hill Sewer Separation – Complete Streets Design has been added as a USQ DIF
project. The Spring Hill Sewer Separation project has historically been considered solely
a sewer project, and the Council approved design funding for the sewer portion of the
project in December 2017. However, given that the project will require disrupting
multiple streets in the Spring Hill area, the Administration decided it would be a missed
opportunity not to consider traffic calming and other streetscape improvements in the
project area. The design for the streetscape portion of the project is being funded out of
unused bond proceeds. As the design progresses and we receive construction costs
estimates, the Administration will make a recommendation to the Council about how to
fund the streetscape construction.
4. The cost estimate for the public safety building has been updated to reflect the high
construction costs present throughout the Greater Boston region, especially for vertical
construction.
5. The Building Accessibility Improvements and Building Improvements lines have been
escalated by 6% per year starting in FY21, with a base year of FY17, to reflect the
inflation in vertical construction costs observed throughout the region. The purpose of
doing so is for real spending to reflect the investment made in FY17 when these recurring
lines were first introduced. The project list does not include values for FY20 since these
dollars have been earmarked for the West Branch Library renovation.
6. The ADA Ramps, Sidewalks & Signals and the Street Repairs recurring lines have been
combined into a single line, and this value has been escalated by 4% per year starting in
FY20, with a base year of FY14, to reflect the inflation in horizontal construction costs
observed throughout the region. The purpose of doing so is for real spending to reflect the
investment made in FY14 when these recurring lines were first introduced. We have also
added to the spend schedule annual funding received from the state Chapter 90 program
($1.2 million) and correspondingly included Chapter 90 as a funding source for that
recurring investment. Regarding the spend schedule in FY19 and FY20: Engineering is
3
assumed to complete the FY19 street package in FY20 (in the calendar year 2019
construction season).
7. Several projects have been added to the CIP project list in the Recommended category:
a. Healey Schoolyard & Field Construction. The design for the schoolyard has
been funded through the CPA, and the design for the field was approved by the
Council in FY19 as part of the Schoolyard Field Improvements funding request.
b. Central Hill Campus Plan Phase 1. As discussed at Finance Committee on
April 23, 2019, the design for this project is funded out of an unissued bond
authorization. The Administration intends to seek approval for construction
funding in FY20.
c. ArtFarm. The Community Preservation Committee recommended funding for
ArtFarm in the spring of 2019.
d. ArtBarn. The Administration anticipates coming in with a construction funding
request for ArtBarn in the fall of 2019.
e. Building Master Plan OPM. The Administration submitted a funding request for
owner’s project manager (OPM) services on March 14, 2019. Procuring these
services will provide critical information for determining how to proceed with the
Building Master Plan.
f. Davis Square Interim Streetscape Improvements. Major infrastructure and
streetscape improvements are anticipated for Davis Square in the future. The
purpose of this project is to repair several deficiencies in pedestrian areas
including sidewalks, crosswalks and paths through the parks to address safety-
related issues in the interim.
Project category definitions:
When the CIP project list was first introduced in its current form in November 2016, each project
was assigned to a category. Definitions of each of these categories are provided below for
reference.
USQ DIF (formerly Critical) projects are those included in or related to the Union
Square District Improvement Financing (DIF) development program. These projects are a
prerequisite for attracting outside investments in the transformative district in part
because they unlock future revenue that would otherwise go untapped. For the General
Fund, this category includes (but is not limited to) the streetscape portion of the
Somerville Ave. Utility & Streetscape Improvements project as well as the acquisition of
land for a new public safety building and the construction of that building.
Recurring projects are investments the City has made and will continue making to
maintain existing assets. These are considered recurring because they are invested in on a
regular basis, and in any modelled projection the City Council will be asked to make
these appropriations so that the City can continue to provide core services.
4
Underway projects are currently ongoing but not yet completed. These projects have
been authorized in full or in part by the City Council or have received funding from other
sources. Note that USQ DIF projects can also be Underway.
Recommended projects are those identified by the Administration as important projects
to undertake in the coming years because they respond to a community need, address a
public health or safety issue, or advance Underway or USQ DIF projects.