Copy of CIP Form Healey Schoolyard Field and ADA Access 1.7.20.._ (3) — File 209483
Project Title:
Project Address:
Department:
Project Mgr.:
Email:
New Project or Modification:
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Project Description/Scope of Work:
Justification:
Relationship to Other Projects:
Category: Please check all appropriate boxes
Architectural/Engineering Feasibility Study
Architectural/Engineering Construction Document Services & Construction Admin
Building Alteration/Repair/Renovation/Addition/New Construction
Building Improvements (non-construction)
Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.)
Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.)
Street/Sidewalk/Monument Improvements
Water Improvements
Sewer Improvements
Land Development
Land Acquisition
Land Disposition
Parks and Open Space
Other
Operational Impact:
What impact will this project have on operational costs?
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
5 Meacham Street
FORM A - DESIGN & CONSTRUCTION
CAPITAL IMROVEMENT PROJECT (CIP) REQUEST - FY20
Arn Franzen
AFranzen@somervillema.gov
The new schoolyard will require additional maintenance and snow removal by the School Department and DPW. The new synthetic turf
field will require regular care and maintenance by the DPW Parks Staff, and the new ADA ramp will require additional snow removal by
the City DPW. New tree plantings, irrigation and lighting systems will also require regular maintenance, which is not currently provided.
Arthur D. Healey Schoolyard, U-12 Recreation Field, and ADA Access to Mystic Housing
This EJ neighborhood is over 70% LMI and is lacking quality recreation spaces. The existing schoolyard is an expanse of uneven cracked
asphalt used by hundreds of student daily. It is unshaded, divided up by chain link fence, and devoid of trees and play features. The new U-
12 field will provide new recreation opportunities for the school, neighborhood and community. Recent studies document that
recreational programming needs for the City's youth are unmet because of a critical shortage of large recreation fields, and that this site is
one of the only locations in the city that can accommodate a new field of this size. The new ADA ramp will provide a long overdue code
compliant connection to Mystic Housing, helping to overcome the physical barrier of the slope and providing more social equity for Mystic
Housing families where over 50% of the Healey students live.
Renovation of the existing 65,000 square foot schoolyard will include: 1) A new schoolyard incorporating new recreational, educational,
and natural features. 2) Construction a new U-12 sized Synthetic Turf Soccer Field with large support walls, adjacent to the schoolyard
and over the slope decesding to Mystic Housing(SHA), and 3) Construction of a new ADA accessible route transitioning the barrier of the
rocky slope between the school and Mystic Housing (SHA) below. The work is targeted to achieve the goals of the Healey Mystic Master
Plan, and the schoolyard and the U-12 field will become a new public park and recreation resource during non-school hours.
Public Space & Urban Forestry
Research has shown that increased access to recreation and nature can play a crucial role in improving students physical and mental
health, relieving stress and improving classroom performance, self-esteem and personal growth. The construction of the new recreation
field is called for in the 2016 Fields Master Plan, and the new schoolyard and field construction are included in the CIP.
Urgent
New Project
First
Design and Construction Project Funding
Total Estimated Cost
Prior Years
Funding
FY 20
FY 21
FY 22
FY 23
FY 24
Capital Costs:
Feasibility Study
$ -
Land Acquisition/Appraisal
- - - - - -
Environmental Remediation/LSP
Demolition & Site Clearance
- - - - - -
Owner's Proj. Mgr./Clerk of the Works
Designer Services (SD through CA)
Construction
6,100,000 -
300,000 2,850,000 2,950,000 - -
Insurance (builder's risk, addtl. Polices) - -
-
- -
Furniture & Equipment (FFE)
Police Details
- -
-
- -
Contingency
Other (Specify)
400,000 -
200,000 200,000 - -
Other (Specify)
- -
- -
Total:
$ 6,500,000 $ - $ 300,000 $ 3,050,000 $ 3,150,000 $ - $ -
Please provide suggested sources. This section will be finalized jointly by Finance and the Department.
Funding Sources:
Prior Years
Funding
FY 20
FY 21
FY 22
FY 23
FY 24
Stabilization Fund
$ - $ - $ - $ - $ - $ - $ -
GO Bonds
6,000,000 - 6,000,000
- - -
Retained Earnings
General Fund
Special Assmnt.
- - - - - - -
Ch. 90
Grants
500,000
CDBG - 250,000 250,000 - -
Receipts Reserved
Other (Specify)
- - - - - - -
Other (Specify)
- - - - - - -
Total:
$ 6,500,000 $ - $ 6,000,000 $ 250,000 $ 250,000 $ - $ -
Evaluation Committee Use Only:
Reviewed and Approved By:
Version
Requesting Department
Date
Draft
Auditing
Date
Revised
Purchasing
Date
Accepted
Final Approval
These estimates assume a single construction contract and uninterupted construction cycle from statt to finish, starting in the late Spring or early Summer of
calander year 2020. Construction cost contingencies are included in our construction estimates, and we have included an additional contingency of $400,00 for
potential soil testing and risk. Costs cover three years starting in FY20, assuming some mobilization costs ($200,000) prior to the start of work in the summer.
Department:
Project Mgr.:
Email:
New Project or Modification:
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Equipment/Asset Description:
Justification:
Relationship to Other Projects:
Operational Impact:
What impact will this project have on operational costs?
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
FY20
FY21
FY22
FY23
FY24
Average Annual Repair Costs
$ - $ - $ - $ - $ -
Average Annual Maintenance Costs - - - - -
Other (Specify) - - - - -
Implementation
- - - - -
Other (Specify) - - - - -
Total:
$ - $ - $ - $ - $ -
Estimated useful life:
Cost Per Unit:
# of Units Requested:
Total Cost:
-
see other side
Please detail any additional operational costs or revenues, if any, that may be the result of this purchase e.g. the new equipment will
reduce emergency repair costs by $10,000 per year. Or the new equipment will lead to $5,000 in additional fee revenue collected. Please
enter these dollar amounts on the table below.
Please describe how you came up with your cost estimate.
Please describe what the equipment or asset does; what it will be used for; etc.
Please indicate the need for the project and what it is expected to accomplish and its anticipated useful life. Include how much the project
will impact city operations. Support your case for why the proposed project is urgent, necessary or desirable.
Describe the relationship between proposed CIP and other projects or plans (e.g. SomerVision, Green Line Extension,
Sustainaville/Climate Forward, VisionZero, inclusionary/affordable housing, etc.)
Equipment
Requested:
CAPITAL IMROVEMENT PROJECT (CIP) REQUEST - FY20
FORM B - EQUIPMENT & ASSETS
S l
P
j
l
S l
O d
Equipment Being Replaced (if any):
Make
Age
Avg. Maint.
Cost
Avg Repair
Costs
Rental Cost
A.
B.
C.
D.
E.
Recommended disposition of items being replaced:
Evaluation Committe Use Only:
Reviewed and Approved By:
Requesting Department
Date
Version
Auditing
Date
Draft
Purchasing
Date
Revised
Final Approval
Accepted
Possible use by other departments, trade-in, surplus sale, etc.
Item
New ProjecFirst
Urgent
ModificatioSecond
Necessary
Third
Desirable
Fourth
Fifth
Sixth
Seventh
Eighth
Ninth
Tenth