CPC Funding Recommendation Central Hill Change of Scope — File 210298
COMMUNITY PRESERVATION COMMITTEE CHANGE OF SCOPE RECOMMENDATION FOR
FY20 AWARD FOR CENTRAL HILL CAMPUS PLAN PHASE I, PUBLIC SPACE & URBAN FORESTRY
DIVISION
PROJECT DESCRIPTION
In FY20, the Community Preservation Committee recommended, and the City Council approved, a
$300,000 award of Community Preservation Act funds for the rehabilitation of the Central Hill Campus.
Central Hill Park is Somerville’s oldest park (1870) and one of its largest (6.58 acres), located on Highland
Avenue between Walnut and School Streets. It is a key element in Somerville’s “civic center on the hill,”
which includes City Hall, Somerville High School, and Somerville Public Library’s main branch.
The Public Space and Urban Forestry Division will complete the first phase of renovating Central Hill
Park, which is the east side of the Central Hill Park property along Highland Avenue between Walnut and
Putnam Streets. The remaining phases of the Central Hill Campus will be fully designed and constructed
as part of the City Hall, 1895 building, and Library renovation planning efforts. The original scope did not
limit the use of CPA funds within the first phase of the Central Hill construction project. The Community
Preservation Committee would now like to limit the use of CPA funds to the reconstruction of the
Central Hill Playground to ensure the playground construction can go forward using funds from the
Commonwealth’s Parkland Acquisitions and Renovations for Communities (PARC) grant.
ELIGIBILITY
Open space/recreation land: This project will rehabilitate an existing park.
RECOMMENDATION
On June 10, 2020 by a vote of 7-0 the Community Preservation Committee recommended changing the
scope of the FY20 funding award for the rehabilitation of the Central Hill Campus to be amended to
allow the use of CPA funds exclusively for the reconstruction of the Central Hill Playground.
JOSEPH A. CURTATONE
MAYOR
CITY OF SOMERVILLE, MASSACHUSETTS
COMMUNITY PRESERVATION COMMITTEE
Project Budget
Recommended funding amount:
Expenses
Amount
Study
$0
Soft costs
(Owners Project Manager and Conceptual Design)
$0
Construction
$4,732,870
Total $4,732,870
Sources
CPA funding awarded
$300,000
PARC Grant
$400,000
City of Somerville
$4,032,870
Total $4,732,870
ALIGNMENT WITH COMMUNITY PRESERVATION PLAN
The Community Preservation Plan prioritizes rehabilitating existing recreational land.
MEASURES OF SUCCESS
The goals of this project are to:
• Achieve a historically appropriate and unified sense of space
• Improve accessibility within the campus
• Respectfully incorporate and relocate numerous war memorials
• Integrate the Central Library into the civic experience
• Systematically mitigate stormwater impacts
• Utilize landscape and urban design elements and wayfinding to enhance the visitor experience
Success of this project will be measured by the following:
1. Install site elements with materials appropriate to the historic context of the buildings
2. Deliver new walkways that meet or exceed accessibility standards
3. Install war memorials as directed by the Veterans Committee
4. Support exterior learning moments and library events across the Central Hill Park and Playground
5. Measure stormwater quality and quantity
FUNDING CONDITIONS
Upon commencement of the Project and as appropriate, the City of Somerville agrees to post a sign
stating that the Project was funded through the City of Somerville’s Community Preservation Act
program.
The full proposal is available at: https://www.somervillema.gov/sites/default/files/2019-09-
24_CENTRALHILL_CPA_APPLICATION_print.pdf