CPC Funding Recommendation Central Hill Emergency Funding — File 210299
COMMUNITY PRESERVATION COMMITTEE CHANGE OF SCOPE RECOMMENDATION FOR
FY21 AWARD FOR CENTRAL HILL PLAYGROUND, PUBLIC SPACE & URBAN FORESTRY DIVISION
PROJECT DESCRIPTION
In FY20, the Community Preservation Committee recommended, and the City Council approved, a
$300,000 award of Community Preservation Act funds for the rehabilitation of the Central Hill Campus.
Central Hill Park is Somerville’s oldest park (1870) and one of its largest (6.58 acres), located on Highland
Avenue between Walnut and School Streets. It is a key element in Somerville’s “civic center on the hill,”
which includes City Hall, Somerville High School, and Somerville Public Library’s main branch.
The Public Space and Urban Forestry Division also received a $400,000 PARC grant to support the
project. To take advantage of this grant, construction of the project can commence in July 2020 and the
$400,000 from the Commonwealth must be fully spent in FY21. Due to the COVID-19 pandemic, the full
Central Hill Phase 1 project has been delayed and the price of constructing the playground has
increased. However, to take advantage of the PARC grant, the City of Somerville requested additional
emergency CPA funding to allow the project to move forward.
ELIGIBILITY
Open space/recreation land: This project will rehabilitate an existing park.
RECOMMENDATION
On June 10, 2020 by a vote of 7-0 the Community Preservation Committee recommended appropriating
$206,080 for this project from the open space/recreational land reserve budget, using FY21 funds, to
the control of the Public Space & Urban Forestry Division for the overall purposes summarized in this
document.
JOSEPH A. CURTATONE
MAYOR
CITY OF SOMERVILLE, MASSACHUSETTS
COMMUNITY PRESERVATION COMMITTEE
Project Budget
Recommended funding amount:
Expenses
Amount
Study
$0
Soft costs
(Owners Project Manager and Conceptual Design)
$0
Construction
$930,350
Total $930,350
Sources
CPA funding awarded
$300,000
PARC Grant
$400,000
CPA Emergency Funding (requested)
$230,350
Total $930,350
ALIGNMENT WITH COMMUNITY PRESERVATION PLAN
The Community Preservation Plan prioritizes rehabilitating existing recreational land.
MEASURES OF SUCCESS
The goals of this project are to:
• Achieve a historically appropriate and unified sense of space
• Improve accessibility within the campus
• Respectfully incorporate and relocate numerous war memorials
• Integrate the Central Library into the civic experience
• Systematically mitigate stormwater impacts
• Utilize landscape and urban design elements and wayfinding to enhance the visitor experience
Success of this project will be measured by the following:
1. Install site elements with materials appropriate to the historic context of the buildings
2. Deliver new walkways that meet or exceed accessibility standards
3. Install war memorials as directed by the Veterans Committee
4. Support exterior learning moments and library events across the Central Hill Park and Playground
5. Measure stormwater quality and quantity
FUNDING CONDITIONS
Upon commencement of the Project and as appropriate, the City of Somerville agrees to post a sign
stating that the Project was funded through the City of Somerville’s Community Preservation Act
program.
The full original proposal is available at: https://www.somervillema.gov/sites/default/files/2019-09-
24_CENTRALHILL_CPA_APPLICATION_print.pdf