Conway CIP Cost and Cash Flow Projection — File 210645
Project Title:
Project Address:
Department:
Project Mgr.:
Email:
New Project or Modification:
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Project Description/Scope of Work:
Justification:
Relationship to Other Projects:
Category: Please check all appropriate boxes
Architectural/Engineering Feasibility Study
Architectural/Engineering Construction Document Services & Construction Admin
Building Alteration/Repair/Renovation/Addition/New Construction
Building Improvements (non-construction)
Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.)
Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.)
Street/Sidewalk/Monument Improvements
Water Improvements
Sewer Improvements
Land Development
Land Acquisition
Land Disposition
Parks and Open Space
Other:
Operational Impact:
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
553 Somerville Ave, Somerville, MA, 02143
FORM A ‐ DESIGN & CONSTRUCTION
CAPITAL IMROVEMENT PROJECT (CIP) REQUEST ‐ FY21
Andrew Louww
alouw@somervillema.gov
It is anticipated that the cost of operating the project once complete will be unchanged or slightly reduced (less than 5%)
Conway Field Remediation and Rehabilitation Project
As it currently exists, this site currently poses a risk to human health and the clean up of the site is required by federal law. Due to risk to
human health the EPA will be contributing approximately $3,000,000 in funding for their scope of clean up action, this project is both
urgent and PSUF's top priority project. Once the remediation is compete, the new multi-use synthetic turf and sports lighting system will
allow for an increased intensity of use of the field over traditional natural grass fields. With routine mantenance, the life expectancy of the
project should be approximately 50 years.
This project includes the environmental cleanup of the PCB contaminated soils under the existing Conway Park and the construction of a
new U-14 multi-use synthetic turf field including two softball fields, an LED sports lighting system, and the redevelopment of the splash
pad that will be removed to provide access for the remediation work.
PSUF, OSPCD
The conversion of the field to synthetic turf is idetified as a goal in the City's Open Space and Recreation Plan.
New Project
Urgent
First
Environmental Conditions Remediation
What impact will this project have on operational costs?
Design and Construction Project Funding
Total Estimated Cost
Prior Years
Funding
FY 21
FY 22
FY 23
FY 24
FY 25
Capital Costs:
Feasibility Study
$ -
-
-
- -
-
Land Acquisition/Appraisal
$ -
-
-
- -
-
Environmental Remediation/LSP
$ 325,000
325,000
-
- -
-
Demolition & Site Clearance
$ -
-
-
- -
-
Owner's Proj. Mgr./Clerk of the Works
$ -
-
-
- -
-
Designer Services (SD through CA)
$ -
-
-
- -
-
Construction
$ 7,544,000
7,544,000
-
- -
-
Insurance (builder's risk, addtl. Polices)
$ -
-
-
- -
-
Furniture & Equipment (FFE)
$ -
-
-
- -
-
Police Details
$ -
-
-
- -
-
Contingency
$ 1,217,250
1,217,250
-
- -
-
Other:
$ -
- - - - -
Other:
$ -
- - - - -
Total:
$ 9,086,250
$ 9,086,250 $ ‐ $ ‐ $ ‐ $ ‐
Please provide suggested sources. This section will be finalized jointly by Finance and the Department.
Funding Sources:
Prior Years
Funding
FY 21
FY 22
FY 23
FY 24
FY 25
Stabilization Fund
$ -
-
-
- -
-
GO Bonds
$ 6,086,250
6,086,250
-
- -
-
Retained Earnings
$ -
-
-
- -
-
General Fund
$ -
-
-
- -
-
Special Assmnt.
$ -
-
-
- -
-
Ch. 90
$ -
-
- -
-
Grants
$ 3,000,000
3,000,000
-
- -
-
Receipts Reserved
$ -
-
-
- -
-
Other:
$ -
- - - - -
Other:
$ -
- - - - -
Total:
$ 9,086,250
$ 9,086,250 $ ‐ $ ‐ $ ‐ $ ‐
Evaluation Committee Use Only:
Reviewed and Approved By:
Version
Requesting Department
Date
Draft
Auditing
Date
Revised
Purchasing
Date
Accepted