FY21 Museum CPC Funding Recommendation (Reappropriation of funds) — File 211403

File 211403·2 pages·📄 Original PDF (city portal)·sha256 609b6d0e99a7…
    COMMU PROJECT D The Some Build, hit  Collection construct   ELIGIBILITY Historic re   RECOMME On Februa reapprop construct   Project B Recomme     JOSEPH A. CUR MAYOR NITY PRESER DESCRIPTION   erville Museu a stone ledge n Care project ion project.   Y  esources: The ENDED FUNDIN ary 24, 2021  riating $87,11 ion project to Budget  ended funding Expens Study  Soft co Constru   Source CPA his Capital          RTATONE R RVATION COM COLL m informed t e while drillin t will be amen e Somerville M NG  by a vote of 7 14 awarded t o construct an g amount:   ses  sts  uction  s  storic resourc Campaign Co CITY O COMMU MMITTEE FY LECTION CAR the CPC that a g beneath the nded to allow Museum is a l 7‐1 the Comm o the Somerv n elevator ad ces funds‐ req ontribution   OF SOMERV UNITY PRE Y21 REAPPRO FOR   RE, SOMERVI around Janua e Museum’s W w for CPA fund ocal historic d munity Preser ville Museum dition.   quested  VILLE, MA ESERVATIO OPRIATION F LLE MUSEUM ary 29th, thei Westwood Ro ds to be used district and is rvation Comm  for Collectio Tot Tot ASSACHUS ON COMM FUNDING RE M  r contractors oad porch. Th d exclusively f s currently no mittee recomm on Care, to the Amount  $0  $0  $87,114  tal $87,114      $100,608 $ 535,00         tal $635,608 SETTS MITTEE COMMENDA , Stack Design he scope of th for the elevat ot ADA access mended  e elevator  8  00  8  ATION  n  he  tor  sible. 
      ALIGNMENT WITH FY21 COMMUNITY PRESERVATION PLAN  The Somerville Museum collections and the interior of the building cannot currently be enjoyed by all  Somerville residents because the building is not currently ADA accessible.    FUNDING CONDITIONS  1. Execution, and recording, of an historic preservation restriction, which includes a provision for  public access, that was required by the FY15 CPA grant.  2. Upon commencement of the Project and as appropriate, the Somerville Museum agrees to post  a sign stating that the Project was funded through the City of Somerville’s Community  Preservation Act program.   3. CPA funds will only go towards the construction of the elevator addition.    MEASURES OF SUCCESS  The goal of this project is to make the Somerville Museum building, events, exhibitions, and other  cultural offerings accessible to all.    The success of the ADA project will be physically evident when visitors in wheelchairs are able to access  the building’s cultural events and with the increased number of public organizations that can hold their  cultural events at the Museum. Once the Palladian window is installed as described, it will be a success.    The full proposal is available at: https://www.somervillema.gov/cpa