PowderHouse Interim Measures — File 211733
Project Title:
Project Address:
Department:
Project Mgr.:
Email:
New Project or Modification:
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Project Description/Scope of Work:
Justification:
Relationship to Other Projects:
Category: Please check all appropriate boxes
Architectural/Engineering Feasibility Study
Architectural/Engineering Construction Document Services & Construction Admin
Building Alteration/Repair/Renovation/Addition/New Construction
Building Improvements (non-construction)
Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.)
Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.)
Street/Sidewalk/Monument Improvements
Water Improvements
Sewer Improvements
Land Development
Land Acquisition
Land Disposition
Parks and Open Space
Other:
Operational Impact:
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
New Project
Urgent
First
What impact will this project have on operational costs?
College Avenue @ Broadway
FORM A - DESIGN & CONSTRUCTION
CAPITAL IMROVEMENT PROJECT (CIP) REQUEST - FY21
Adam Polinski
apolinski@somervillema.gov
The Powder House Circle project is anticipated to reduce collisions in the high-crash intersection, reducing emergency reponse calls. It will
utilize low-cost flexible traffic delineators, which are anticipated to experience a modest annual attrition rate and will require intermittent
replacement. High-durability pavement markings will be used to reduce maintenance costs over time.
Powder House Circle Quick-Build Safety Upgrades
Powder House Circle is consistently ranked as having the highest crash rate of any City-owned interesection in Somerville. It is commonly
cited as an impediment to middle-school and high-school students' ability to safely walk or bike to school.
This quick-build project will use pavement markings, flexible delineator posts and signage changes to transform the high-crash, City-
owned Powder House Circle into a slower, safer New England roundabout design featuring continuous protected bike lanes.
OSPCD- Mobility
This project will leverage the City's current College Avenue sidewalk & street reconstruction project, which has a project limit just south of
Powder House Circle. The combination of these two projects will transform street safety on a major regional commuter cut-through route
in Somerville. Furthermore, the City's sidewalk and street reconstruction program is anticipated to rebuild upper College Avenue (north of
the Circle) as well as Broadway (on either side of the Circle) between 2022 and 2024. Powder House Circle sits at the nexus between these
critical local and regional links.
Design and Construction Project Funding
Total Estimated Cost
Prior Years
Funding
FY 21
FY 22
FY 23
FY 24
FY 25
Capital Costs:
Feasibility Study
$ -
-
-
-
-
-
Land Acquisition/Appraisal
$ -
-
-
-
-
-
Environmental Remediation/LSP
$ -
-
-
-
-
Demolition & Site Clearance
$ -
-
-
-
-
-
Owner's Proj. Mgr./Clerk of the Works
$ -
-
-
-
-
-
Designer Services (SD through CA)
$ -
-
-
-
-
-
Construction
$ 200,000
50,000
150,000
-
Insurance (builder's risk, addtl. Polices)
$ -
-
Furniture & Equipment (FFE)
$ -
-
Police Details
$ -
-
Contingency
$ -
-
Other:
$ -
-
Other:
$ -
-
-
-
-
-
Total:
$ 200,000
$ 50,000 $ 150,000 $ - $ -
$ -
Please provide suggested sources. This section will be finalized jointly by Finance and the Department.
Funding Sources:
Prior Years
Funding
FY 21
FY 22
FY 23
FY 24
FY 25
Stabilization Fund
$ 200,000
50,000
150,000
-
-
-
GO Bonds
$ -
-
Retained Earnings
$ -
-
General Fund
$ -
-
Special Assmnt.
$ -
-
Ch. 90
$ -
-
Grants
$ -
-
Receipts Reserved
$ -
-
Other:
$ -
-
-
-
-
-
Other:
$ -
-
-
-
-
-
Total:
$ 200,000
$ 50,000 $ 150,000 $ - $ - $ -
Evaluation Committee Use Only:
Reviewed and Approved By:
Version
Requesting Department
Date
Draft
Auditing
Date
Revised
Purchasing
Date
Accepted
Final Approval
-
-
$ -
-
-
-
-
-
-
-
-
-
-
-
$ -
-
-
-
-
-
-
-
-
-
-
The project schedule anticipates a summer construction start, with a small possibility that a contractor could begin work in June 2021. The majority of project
activities are anticipated for July and August 2021, with the goal of completing the project in August 2021.