Matters ▸ Attachment
9-11 Allen St. - CIP — File 212266
Project Title:
Project Address:
Department:
Project Mgr.:
Email:
New Project or Modification:
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Project Description/Scope of Work:
Justification:
Relationship to Other Projects:
Category: Please check all appropriate boxes
Architectural/Engineering Feasibility Study
Architectural/Engineering Construction Document Services & Construction Admin
Building Alteration/Repair/Renovation/Addition/New Construction
Building Improvements (non-construction)
Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.)
Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.)
Street/Sidewalk/Monument Improvements
Water Improvements
Sewer Improvements
Land Development
Land Acquisition
Land Disposition
Parks and Open Space
Other:
Operational Impact:
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
9 & 11 Allen St. (Lots 82-D-10 and 82-D-11)
FORM A ‐ DESIGN & CONSTRUCTION
CAPITAL IMROVEMENT PROJECT (CIP) REQUEST ‐ FY21
Thomas Galligani
tgalligani@somervillema.gov
The operational impact of this project is both short and temporary in nature. Upon acquiring the lots the plan would be to dispose of the
property via RFP to an affordbable housing developer that can meet the stated public need of the city. The only additional cost would be
the minor administrative costs of the disposition process.
9-11 Allen St. Acquisition
Acquiring 9-11 Allen Street makes the whole greater than the sum of the parts. It makes the SRA land far more valuable for redevelopment
than as a freestanding alley-loaded lot. Instead, together, the lots permit significant development under the UR zoning. After acquiring this
lot, the City and SRA can work together to dispose of these lots to a partner and achieve a public purpose. Most significantly, the combined
site can be used either as affordable housing in the existing properties (with an extensive back yard), or – with demolition of the houses –
as an affordable apartment building to round out the street with forthcoming market-rate apartment buildings along the west side of Allen
The long term plan will be to use this property as affordable housing, either in its current form, or by building a new affordable housing
building on this site and adjacent land. Allen Street in Somerville serves as a buffer between high density 10+ story development along
Prospect Street in Union Square, and the 2-3 story buildings on streets to its east. Along the west (odd numbered) side of Allen Street are a
series of lots zoned Urban Residence. This zone was designed to encourage redevelopment into 4 story apartment buildings. Each of these
lots is approximately 150 feet in depth The city is receiving applications to build apartment buildings on lots on the odd side of Allen
OSPCD- Economic Development
As the city nears the end of the Greenline extension project this acquisition will pave the way to create additional affordable housing in the
immediate vicinity of both the new Green Line Transit station and the transformative new development being brought online by US2
Associates. The acquisition would provide a vital piece of developable land dedicated for affordable housing purposes.
Urgent
First
Building Acquisition
What impact will this project have on operational costs?
Design and Construction Project Funding
Total Estimated Cost
Prior Years
Funding
FY 21
FY 22
FY 23
FY 24
FY 25
Capital Costs:
Feasibility Study
$ -
-
-
- -
-
Land Acquisition/Appraisal
$ 1,509,600
- 1,509,600
- -
-
Environmental Remediation/LSP
$ -
-
- -
-
Demolition & Site Clearance
$ -
-
-
- -
-
Owner's Proj. Mgr./Clerk of the Works
$ -
-
-
- -
-
Designer Services (SD through CA)
$ -
-
-
- -
-
Construction
$ -
-
Insurance (builder's risk, addtl. Polices)
$ -
-
Furniture & Equipment (FFE)
$ -
-
Police Details
$ -
-
Contingency
$ -
-
Other:
$ -
-
Other:
$ -
- - - - -
Total:
$ 1,509,600
$ ‐ $ 1,509,600 $ ‐ $ ‐ $ ‐
Please provide suggested sources. This section will be finalized jointly by Finance and the Department.
Funding Sources:
Prior Years
Funding
FY 21
FY 22
FY 23
FY 24
FY 25
Stabilization Fund
$ -
-
-
- -
-
GO Bonds
$ 1,509,600
-
1,509,600
-
Retained Earnings
$ -
-
General Fund
$ -
-
Special Assmnt.
$ -
-
Ch. 90
$ -
-
Grants
$ -
-
Receipts Reserved
$ -
-
Other:
$ -
- - - - -
Other:
$ -
- - - - -
Total:
$ 1,509,600
$ ‐ $ 1,509,600 $ ‐ $ ‐ $ ‐
Evaluation Committee Use Only:
Reviewed and Approved By:
Version
Requesting Department
Date
Draft
Auditing
Date
Revised
Purchasing
Date
Accepted
Final Approval
The cost was derived from a professional appraisal of the property plus anticipated recording and closing costs.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
$ ‐
-
-
$ ‐
-
-
-
-
-