Committee Report - PUPW - 9-27-21 — File 212512
Public Utilities and Public Works Committee
Page 1 of 5
Printed 10/4/2021
September 27, 2021
REPORT OF THE PUBLIC UTILITIES AND PUBLIC WORKS COMMITTEE
Attendee Name
Title
Status
Arrived
Jesse Clingan
Chair
Present
William A. White Jr.
Vice Chair
Present
Katjana Ballantyne
Ward Seven City Councilor
Present
Others present: Lauren Racaniello-Mayor’s Office, Luisa Oliveira-OSPCD, Eric Weisman-
DPW, Councilor Mark Niedergang, Councilor JT Scott, Jay Hayden-Water & Sewer, Brian
Postlewaite-Engineering, Nick Antanavica-ISD, Jill Lathan-DPW, Joel Diagostino-Eversource,
Cate Mingoya-Mothers Out Front, Randi Soltysiak-Mothers Out Front and Chris Dwan-resident.
The meeting was held virtually and was called to order at 6:03 p.m. by Chairperson Clingan and
adjourned at 7:57 p.m.
Approval of the March 30, 2021 Minutes
RESULT:
ACCEPTED
Eversource
212225: That Eversource representatives be requested to appear before the next meeting of
this Council’s Committee on Public Utilities and Public Works to respond to the gas leak
data along Somerville Avenue.
Discussed with 210739
Mr. Joel Diagostino from Eversource appeared before the committee to provide updates on this
matter. He stated that Eversource sent two crews out to 721 and 725 Somerville Avenue to fix
two leaks. After the last call, they fixed more leaks down the street. They will get their survey
crews out there to check for more leaks and ask if Mothers Out Front and HEET would like to
join them.
The chair allowed Councilor Scott to speak on this matter. There are other leaks on Somerville
that makes it impossible to put in trees. Councilor Scott asked for a systemic fix that would
provide lasting solution.
Public Utilities and Public Works Committee
Page 2 of 5
Printed 10/4/2021
Councilor Ballantyne asked if Eversource has gone out before with Mothers Out Front and
HEET. Mr. Diagostino stated this was done about four years ago and they are willing to go out
with the community again.
Ms. Cate Mingoya from Mothers Out Front lives at the intersection of Somerville Ave in the
Porter Square area and was disappointed with the issue. She is thankful that Eversource is
willing to go out and looking forward to doing this as soon as possible. They went out with
HEET and found more gas leaks.
Mr. Chris Dwan stated there is a memo on the city’s website complaining about this matter. He
stated that the city staff have told him that they are not planting trees on the heat island because
they just die. He also stated that everywhere they checked in the area has a gas leak.
Ms. Randi Soltysiak from Mothers Out Front stated they would love to go out and measure with
Eversource. She stated there is a long pipe with lots of leaks coming off of it.
Councilor White questioned how can one expert say there are leaks and others say there are no
leaks. Mr. Diagostino stated there are different tools that may give different readings and they
should be calibrated. Some times other devices may pick up sewer gases.
Councilor White would like a record made if there are any discrepancies highlighted in a report.
He asked if there is a plan in place to replace the old pipes that are over 100 years old. Mr.
Diagostino stated the bell joints are what have been leaking which are every 12 feet. They have
a pilot using a robot to inspect the pipes. Councilor White suggests working with the city’s
engineering department on this matter that has been an ongoing issue.
Councilor Ballantyne asked about the pilot using the robot and will have to look at how many
joints in the area. She asked when Mr. Diagostino can get started. He stated it will take about a
month to get quotes and then they can start doing they surveys. Mr. Diagostino stated the
process would include inserting a sleeve inside the pipe that coats the inside of the pipe and
would take the pipe out of service. The robot would get inside the main area and fill any holes in
the pipe.
Chair asked if Eversource could come back for the October meeting with any updates.
Mr. Brian Postlewaite (engineering) stated that Eversource has been working well with the city.
He stated that trees are being seen as part of our infrastructure. He referenced a previous
meeting when someone from Eversource stated the repairs probably would not happen until
2025. Mr. Diagostino stated that Eversource is committed to resolving this issue.
RESULT:
KEPT IN COMMITTEE
210739: That the Director of Engineering and the Director of Infrastructure and Asset
Management urge Eversource to fix gas leaks at 721 Somerville Avenue and nearby, as
identified by HEET, and appear with Eversource staff at the next meeting of the Council’s
Committee on Public Utilities and Public Works to discuss this matter.
Discussed with 212225
RESULT:
KEPT IN COMMITTEE
Public Utilities and Public Works Committee
Page 3 of 5
Printed 10/4/2021
Items for updates
210587: That the Commissioner of Public Works submit a recycling plan for all buildings
that do not receive city solid waste collection services, pursuant to Ordinance 11-40.
Mr. Weisman stated he was hoping to roll out this summer but there was another COVID spike.
They are now hoping to have this rolled out by the October meeting.
RESULT:
KEPT IN COMMITTEE
209691: That the Superintendent of Inspectional Services inform the Committee on Public
Utilities and Public Works whether the newspaper boxes throughout the city are permitted.
Mr. Antanavica stated the newspaper boxes are not currently permitted. Mr. Long was working
on putting this together to permit the boxes. He was not able to complete and he will continue to
work with the clerk’s office on this matter. They are planning on getting this in in time for an
update for the October meeting.
Councilor White updated the committee on the purpose of this request. The concern was regarding
people putting boxes in, not tending to them and they had trash inside.
RESULT:
KEPT IN COMMITTEE
210996: That the Director of SPCD, the Director of Parks and Recreation, or the
Commissioner of Public Works discuss with this Council the installation of electrical
outlets in parks, playgrounds and other public places to charge cell phones, computers, and
other such equipment.
Ms. Oliveira provided an update that their dept does not recommend retrofitting older parks with
this process. If they retrofit older parks, they would have to cut into the hardscape to put in
electrical conduits. She has reached out to Cambridge who has used a special bench, but she
heard it does not hold up well with the weather and they are not using anymore. When the city
designs parks, it’s in compliance with ADA, and could be the pathway for ADA or playground
regulations. Newer parks have electrical outlets.
The Chair sponsored Councilor Niedergang to speak on this matter and he does not see it as a top
priority for the city. He is satisfied with the response from the administration that they have not
heard from anyone in the community meetings that an area is needed to charge phones as being a
priority.
RESULT:
WORK COMPLETED
211449: That the Administration create clean, safe, and permanent public restrooms in
several outdoor locations, similar to the "Portland Loos" that have been installed in
Cambridge.
Ms. Lathan reached out to the Portland Loos and set up a meeting with ISD and Water & Sewer.
It can be placed in Somerville once a location has been identified. She is looking at how many
and where to locate the loos. Maybe pilot one or two initially. The company is willing, ready
Public Utilities and Public Works Committee
Page 4 of 5
Printed 10/4/2021
and will need some lead time which could be 8-12 months, especially since these are made per
order.
Chair Clingan asked what can the city do to move this forward by the next meeting in October.
Ms. Lathan stated the preliminary work has been done and will update the committee in the next
meeting. Ms. Racaniello asked the city councilors to reach out to Ms. Lathan and Mr. Kress, if
they have any potential locations. Ms. Lathan stated these loos have a maintenance component
that will require daily cleaning.
RESULT:
KEPT IN COMMITTEE
211595: That the Director of Mobility and the Commissioner of Public Works work with
the State Delegation to remove the hostile architecture public benches from the Davis
Square MBTA station.
The chair talked to Mr. Rawson who reached out to the state delegation and to the MBTA.
MBTA is balancing ADA compliances. Ms. Lathan stated she has not been a part of the
conversations and will reach out to Mr. Rawson. Councilor Ballantyne reached out to State
Senator Pat Jehlen stating it would have been nice if the MBTA had reached out to them. She
also spoke to the Homeless Coalition executive director who said they had not heard any
complaints from the MBTA and it’s not a problem with people sleeping inside the T station.
RESULT:
KEPT IN COMMITTEE
211596: That the Commissioner of Public Works ensure that no hostile architecture public
benches are installed in the city.
Ms. Lathan stated they do not install these benches nor do they have a policy. Mr. Weisman
stated that the benches installed by the cityare standard non-hostile and do not have any
intermediate armrests.
Councilor Ballantyne stated she did not believe it was the city who install these benches. Some of the
parks are not city owned, but state owned. She wanted to make sure the city speaks to the city councilors
before installing any such benches which would need the Disabilities Commission input before installing.
RESULT:
WORK COMPLETED
211718: That the Director of Water and Sewer discuss with the Committee on Public
Utilities and Public Works the notification process regarding non-emergency work.
Mr. Jay Haydan explained the process for non-emergency water shutdown. They research the
outrage area, then create a map of the area affect that is emailed to engineering, health human,
and other city departments along with Eversource. The foreman creates a flyer to notify the
residents of any shutdowns. They have a dedicated person who sends out an email to the
communications dept with a city alert to all those affected by shutdown. The alert will arrive via
text or phone call. If they cannot complete within 48 hours they will send the notification on the
Friday before shutdown. The contractor that is hired is also responsible for alerting the resident.
Councilor Ballantyne asked about work being done during the day, what happens if the work is
not complete during normal hours, are residents notified if they work is continued later in day.
Public Utilities and Public Works Committee
Page 5 of 5
Printed 10/4/2021
She stated that residents would like to get calls if the work continues later in the day, to let them
know about the unexpected circumstances. Mr. Hayden stated he and his team discuss these
matters and most of the time, they are able to complete the work within the given time. They
knock on doors and some times use reverse 311 calls to let residents know about the issue.
Councilor Ballantyne suggested a quick call to the Ward councilor to let them know that work
will not be completed on time so they are able to answer questions from the community.
Councilor White suggested to maybe use police car blow horns to announce the issues, as is done during
snow emergencies. Mr. Hayden said they may start using the message boards that is used for paving
work.
RESULT:
WORK COMPLETED
212321: That the Commissioner of Public Works replace all the open garbage cans in city
parks and on the Community Path with closed rat-proof garbage cans.
Ms. Lathan stated they have been looking at this request city wide, with the understanding that
rats are issues. They have had discussions with ISD and will discuss with the rats’ czar, once
that position is filled. Mr. Weisman has been looking at costs to replace barrels. They are trying
to be more systematic about replacing the barrels. He met with Big Belly company on Friday
walking through the community paths, discussed data on the parks and existing decorative barrel
inventory.
Councilor White asked what the frequency of when the trash is picked up on the paths. Mr.
Weisman stated that during the busy season, the trash is picked up every other day. Ms. Lathan
talked to the grounds crew and the pick up of trash is very frequent, especially on weekends.
Chair Clingan sponsored someone from the community to speak, Ms. Juana Jean Horstman. Ms.
Horstman asked the city to report on open trash barrels and would like the compacting solar
cans. She said that sometimes the city does not have enough staff and the trash barrels are not
emptied regularly. She also asked the city to be highly effective to price out the compacting
barrels, start with 15 larger parks in the neighborhoods.
Chair Clingan asked Mr. Weisman if he could have pricing for the Big Belly for the October
meeting. Ms. Lathan needs to review where the money will come from to provide the barrels.
Ms. Racaniello stated they are still going through the hiring process for the environmental health
coordinator.
RESULT:
KEPT IN COMMITTEE
Housekeeping
211719: That the Commissioner of Public Works repair the street lights at 31-33 Bailey
Road.
RESULT:
WORK COMPLETED