Copy of Poplar Street Pump Station _Pump House and Facilities Pre-Con_Capital Program Request Sheet_FY22 — File 212549

File 212549·2 pages·📄 Original PDF (city portal)·sha256 ec6c4ffb1e0a…
Project Title: Project Address: Department: Project Mgr.: Email: New Project or Modification: Department Priority: Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth. Project Description/Scope of Work: Justification: Relationship to Other Projects: Category: Please check all appropriate boxes Architectural/Engineering Feasibility Study Architectural/Engineering Construction Document Services & Construction Admin Building Alteration/Repair/Renovation/Addition/New Construction Building Improvements (non-construction) Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.) Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.) Street/Sidewalk/Monument Improvements Water Improvements Sewer Improvements Land Development Land Acquisition Land Disposition Parks and Open Space Other Operational Impact: What impact will this project have on operational costs? Reduce Cost (greater than 5%) Reduce Cost (less than 5%) Cost Unchanged Increase Cost (less than 5%) Increase Cost (greater than 5%) Various FORM A - DESIGN & PRE-CONSTRUCTION CAPITAL IMROVEMENT PROJECT (CIP) REQUEST - FY22 - Pump House & Facilities Jonathan Smith jsmith@somervillema.gov The Pump Station and associated facilities will improve the Water and Sewer Department’s management of catch basin grit, as well as serve as a nerve center for stormwater management through system monitoring equipment and infrastructure controls. Poplar Street Pump Station Project - Pump House & Facilities The Pump Station will serve as a restoration of a century-old drainage pathway for the greater Union Square area, taking advantage of excess capacity in the GLX drainage system, redirecting stormwater flow from the MWRA system to a stormwater storage tank and 50MGD pump array designed to optimize the flood-reduction and I/I offset benefits of the GLX connection. Project includes final design services for the Poplar Street Pump Station, 4 million-gallon stormwater storage tank, catchbasin grit handling, odor control, connection to the Somerville Avenue Utility and Streetscape Improvements box culvert, and connection to the MBTA GLX drainage system. Project includes OPM services and CM@Risk for preconstruction services including construction feasibility analysis, scope management, proposing cost-effective construction alternatives, and validating applicability of selected design elements. IAM - Engineering The Pump Station relates to the SAUSI project, Spring Hill Sewer Separation project and future system improvements, allowing for diversion of stormwater flows to the proposed facilities. The overall site development at 10 Poplar Street supports the longer term Brickbottom Vision Planning, serving as a community hub and transit-oriented public space. Necessary New Project First
Design and Construction Project Funding Total Estimated Cost Prior Years Funding FY 22 FY 23 FY 24 FY 25 FY26 Capital Costs: Feasibility Study Land Acquisition/Appraisal $ - - - - - - - Environmental Remediation/LSP $ - Demolition & Site Clearance $ - - - - - - - Owner's Proj. Mgr./Clerk of the Works $ 531,408 231,408 300,000 Designer Services (Design Phase) $ 4,151,265 2,351,265 1,800,000 Designer Services (ESDC) - Construction - - Insurance (builder's risk, addtl. Polices) - - - Furniture & Equipment (FFE) - - Police Details - - - Contingency - - Other (Specify) $ 1,200,000 - 1,200,000 - - - - Other (Specify) $ - - - - - - - Total: $ 5,882,673 $ 2,582,673 $ 3,300,000 $ - $ - $ - $ - Please provide suggested sources. This section will be finalized jointly by Finance and the Department. Funding Sources: Prior Years Funding FY 21 FY 22 FY 23 FY 24 FY25 Stabilization Fund $ - GO Bonds - GF $ - - - - GO Bonds - Sewer $ 5,882,673 2,582,673 3,300,000 - GO Bonds - Water - Retained Earnings $ - General Fund $ - Special Assmnt. $ - - - - - - - Ch. 90 $ - Grants $ - - - - - - - Receipts Reserved $ - Other - existing GF Bonds $ - - - - Other - existing Sewer Bonds $ - - - - Other - existing Water Bonds $ - - - - Total: $ 5,882,673 $ 2,582,673 $ 3,300,000 $ - $ - $ - $ - Evaluation Committee Use Only: Reviewed and Approved By: Version Requesting Department Date Draft Auditing Date Revised Purchasing Date Accepted Final Approval Funding for $2,582,673 has already been obtained and approved for the OPM and Designer through FY21. This request is for $3,300,000 which will provide funding for OPM and Design services through the Design Phase of the PSPS Project ($2.1M); and fund the estimated costs for Pre-Construction Services which will be provided by the selected CM@Risk firm ($1,200,000).