Matters ▸ Attachment
Committee Report - T&P - 10-20-21 — File 212585
Traffic and Parking Committee
Page 1 of 12
Printed 11/3/2021
October 20, 2021
REPORT OF THE TRAFFIC AND PARKING COMMITTEE
Attendee Name
Title
Status
Arrived
Mark Niedergang
Chair
Present
Jesse Clingan
Vice Chair
Present
Katjana Ballantyne
Ward Seven City Councilor
Present
Others present: Hannah Carrillo -Mayor’s Office, Brad Rawson-OSPCD, Eric Weisman-DPW,
Jill Lathan-DPW, Brian Postlewaite-Engineering, Councilor JT Scott-Ward 2, Adam Portney-
Resident and Erika Uyterhoeven-State Rep
The meeting was held virtually and was called to order at 6:03 p.m. by Chairperson Niedergang
and adjourned at 7:53 p.m.
Approval of the September 20, 2021 Minutes
RESULT:
ACCEPTED
Traffic Signals, Crosswalks and Pedestrian Safety
212254: That the Director of Mobility replace the HAWK signal at Buckingham and
Beacon Streets with a standard RYG stoplight signal.
Chair Niedergang stated this issue has been before the Committee for two years with similar
issues on Beacon Street. He read a statement from Lt. Polito that was sent to the committee
members re: the HAWK light at Buckingham and Beacon. It is attached to the agenda.
The Chair sponsored Ward 2 Councilor JT Scott to speak. He stated his first order on
Buckingham was in 2018. Councilor Scott stated that not a single person has stated they
appreciate the light. He also stated that Senator Pat Jehlen could not join the meeting tonight but
would like this light changed.
Chair Niedergang read a email from Senator Jehlen that she feels this is problematic and is in
support of changing the light.
Mr. Adam Portney was sponsored by the Chair. He stated the intersection is extremely
dangerous for bikers, pedestrians and cars. In 2019, a non-traditional HAWK signal was
installed and no one understands the signal. He stated the federal guidelines do not recommend
Traffic and Parking Committee
Page 2 of 12
Printed 11/3/2021
this signal for an urban two-lane road. He stated the walk sign comes on and the pedestrians and
cars are confused by the signal.
State Representative Erika Uyterhoeven was sponsored by the Chair and stated that she was
reached out to a few months ago about the danger to pedestrians crossing the street at this
location. They organized a petition and got 143 signatories to remove the HAWK signal. The
constituents she has spoken to hate the signal and do not feel safe and need to dodge vehicles
when crossing the cross walk. (NOTE: The petition text and list of signers and an email in
support from Mr. Portney are attached to the agenda for the meeting.)
Mr. Rawson stated that a review is ongoing and the City will continue to monitor this area. The
City has recently staffed up the Engineering division. Mr. Postlewaite stated traffic engineering
staff has improved over the past year and is working to understand the full scope of options for
this intersection. The federal highway administration states that a HAWK signal is a
recommended solution for two lane road, he said. They are looking at what other signals could
be installed at this location. There are specific regulations that must be followed to install a
RYG (red yellow green) standard light. He said there are approximately 95 pedestrians a day at
this location and according to the guidelines there would need to be over 250 pedestrians to
justify changing to a RYG light at this location.
Mr. Postlewaite stated that federal regulations have strict guidelines that have been around for
decades where RYG signal can go.
Chair Niedergang commented that he agrees with the people who spoke tonight. The residents
who have every day experience are the experts in what is safe, he said.
Mr. Rawson stated the Administration is taking this seriously and has assigned resources to
work on it
RESULT:
WORK COMPLETED
209148: That the Commissioner of Public Works immediately replace the HAWK signals
on Beacon Street with more suitable and effective RYG pedestrian-activated signals.
See item #212254
RESULT:
WORK COMPLETED
207903: That the Director of SPCD discuss with this Council the use of "concurrent with
leading interval" pedestrian crossing timing at major intersections that see high usage by
school and pre-school children, particularly at the intersection of Beacon and Washington
Streets, and consider reversion to pedestrian-exclusive crossing timing at several relevant
intersections.
RESULT:
WORK COMPLETED
209616: That the Director of Engineering install a crosswalk on Somerville Avenue at Kent
Street and Spring Street.
Traffic and Parking Committee
Page 3 of 12
Printed 11/3/2021
Chair Niedergang stated there is a petition that was circulated by the Girl Scouts asking for a
new crosswalk at this location.
Mr. Rawson stated there have been plans to install a crosswalk in this area for some time now
and there is a private development project nearby in the works and they are willing to construct
the crosswalk as part of their development. There will be more dialog in the coming months.
He stated that 2023 would be realistic and the earliest for the crosswalk.
Councilor Ballantyne stated this area has a lot of pedestrians with little kids. She would like a
safe way for pedestrians to cross, even if it is temporary road painting or flex posts for the bus
stop. Mr. Rawson will work with the team to look into deploying some quick-build traffic
calming methods for this area. Councilor Ballantyne suggested maybe using yellow bollards to
cause people to slow down in the area. Chair Niedergang suggested to condition the crosswalk
as a first step to be completed at the same time as the foundation on the project. Maybe the
Zoning or Planning board could require this be done early on as part of the deal for the project?
Mr. Postlewaite stated he will explore requiring an interim crosswalk that would be put in place
at the beginning of construction.
RESULT:
WORK COMPLETED
205831: That the Director of Engineering share with this Board the feasibility of creating a
pedestrian crossing on Somerville Avenue, between Belmont and Spring Streets.
See item #209616
RESULT:
WORK COMPLETED
209482: That the Director of Engineering construct a pedestrian crosswalk across
Washington Street in front of the Public Safety Building. (2nd request)
Mr. Rawson stated he did not have any major updates from the last time it was discussed. There
are a series of site constraints that have stymied every test plan. Chair Niedergang said that he
hopes that this crosswalk gets done as part of redevelopment of the D-1 block that now has the
Public Safety Building on it.
RESULT:
WORK COMPLETED
City Employees Driver Safety Training
210975: That the Administration and the Commissioner of Public Works discuss the
vehicle training process for all DPW employees and contractors whose job requires them to
drive city vehicles.
Mr. Weisman said that the City has contracted with a driver safety program and will roll out the
program over the next month. Ms. Carrillo met with Human Resources and the “Safer Trucking
in Changing Cities” video has been incorporated in the driver safety training. Every City staff
will go through the training within a month. Also, all new staff members will go through this
online and video training in the future. Human Resources is still trying to work out details for
refresher training program.
Traffic and Parking Committee
Page 4 of 12
Printed 11/3/2021
Chair Niedergang asked if the training is the same for all City staff such as truck vs. those
driving cars. Mr. Weisman stated that the program used for DPW drivers is longer for people
who drive more intensively.
Chair Niedergang asked about city contractors such garbage and recycling trucks, if there are any
plans to do training or check with companies on what type of training they are offered.
Ms. Carrillo stated the City will not start training private contractors.
Chair Niedergang asked about speed limiters. Mr. Weisman is waiting for samples to come in
that would be a plug-in version of vehicle speed limiters.
RESULT:
WORK COMPLETED
212251: That the Commissioner of Public Works and the Director of Mobility report to this
Council whether the video "Safer Trucking in Changing Cities" is being used to train City
truck drivers in safe driving techniques.
See item #210975
Mr. Weisman stated this is being bundled into the training that HR is setting up.
RESULT:
WORK COMPLETED
211128: That the Commissioner of Public Works discuss installing speed limiters on the
city's vehicles to monitor speed and ensure that employees are observing speed limits.
See item #210975
RESULT:
WORK COMPLETED
Traffic Calming Around GLX Stations and CPX Crossings
211814: That the Director of Engineering install raised crosswalks rather than standard
crosswalks for each at-grade crossing of the Community Path Extension, including Central,
Sycamore, and Walnut Streets.
Mr. Rawson gave a refresher update following the Committee’s last discussion on this matter.
The Community Path (CPX) street crossings are close to the bridge decks and they have been
working with MBTA on them. The proximity to the bridges present major problems for
constructing crosswalks there due to drainage issues and the challenges and cost of making
changes to bridges. Plus the bridges are not under control of the City but of MassDOT or the
MBTA.
Mr. Postlewaite stated they worked with the GLX team and MassDot bridge team to find
compromises for Central and School Street crossings. Due to the complexity of those areas, and
the fact that there is City-owned infrastructure all around them, the GLX and the City agreed that
those two crossings would be the responsibility of the City to address. City staff are looking at
other traffic calming measures up and down stream, perhaps installing some bump outs wherever
possible. The Walnut, Sycamore, Medford and Lowell Streets are the responsibility of the GLX
Team to address safety issues.
Traffic and Parking Committee
Page 5 of 12
Printed 11/3/2021
Councilor Clingan stated he is most concerned about Sycamore Street with the number of cars
coming down the hill.
Mr. Rawson stated the CPX will be one of the last portions of work by the GLX Team and
should be completed in the summer.
Councilor Ballantyne asked what are the costs of treatments to go into the sites and are there any
opportunities to use the money that has not been spent for the GLX.
Mr. Postlewaite stated speed humps costs $5-10k and are fairly easy to install. Additionally,
they do not create additional problems with abutters and pedestrians. The costlier elements are
resetting crosswalks, bump outs and raised crosswalks. Flashing lights can be more expensive in
range depending upon location and constraints.
Councilor Clingan asked if the state is putting in any funds for traffic calming for the CPX
crossings.
Mr. Rawson stated the existing community path is owned by the MBTA but they are not putting
in any additional funds beyond the $1.4 million given to the City in the Memorandum of
Agreement signed several years ago (see item 13).
Mr. Postlewaite stated both School and Central streets are adjacent to other projects the City is
working on and they would coordinate between addressing the CPX crossings and those projects.
RESULT:
WORK COMPLETED
211135: That the Director of SPCD report to this Council on traffic management and
calming plans for the streets and neighborhoods around the five Green Line Extension
stations expected to open before the end of this year.
Mr. Rawson was asked if there are any challenges or obstacles. He stated all processes are
moving forward and suggested reading the February 8th City Council meeting notes and viewing
the presentation with diagrams and full details. He gave a brief summary. There is traffic
calming in the Ball Square neighborhood. A new cross walk will be constructed across from
Kelly’s Diner. There are protected bike lanes in Ball Square. In Gilman Square, they are
working hard with the neighborhood and excited with the direction. There are raised crosswalks
in Union Square and they are constructing new traffic calming near Prospect and Webster.
RESULT:
WORK COMPLETED
210968: That the Director of SPCD brief the Traffic and Parking Committee on the work
that will be done on our streets and Community Path pursuant to the Memorandum of
Agreement with the MBTA and MaDOT, which will provide the city with a $1,400,000
payment.
Chair Niedergang asked if everything is going as planned and the work is proceeding.
Mr. Rawson stated the working is proceeding on time and within budget; they are installing
traffic calming, as needed.
Traffic and Parking Committee
Page 6 of 12
Printed 11/3/2021
Councilor Ballantyne asked who’s monitoring the compliance and does the City need to monitor
the MOU. Mr. Rawson replied that Ms. Eileen McGettigan, the City’s Special Counsel is
monitoring and managing the process.
RESULT:
WORK COMPLETED
Speed Bumps and Flex Posts
210966: That the Director of SPCD report to this Council why there are still so few speed
bumps in the city, especially since the ones deployed on Powder House Boulevard seem to
be making a dangerous area safer for pedestrians.
Mr. Rawson stated that speed humps were installed in 2019 on Powderhouse Boulevard and have
been effective. One of the current flagship projects is the College Ave corridor. They will be
installing asphalt speed humps over the next couple of weeks. The City’s contractor is planning
to mobilize crews to come out soon to perform the work. Mr. Rawson stated next year’s flagship
project will be Pearl Street.
Mr. Postlewaite stated the speed humps are more beneficial than speed bumps and are gentle
enough so that the plows can plow over without too much difficulties as well as first responders
are able to go over them without being slowed down significantly.
RESULT:
WORK COMPLETED
210965: That the Director of SPCD report to this Council in writing by December 4, and
discuss with the Traffic and Parking Committee at its next meeting on December 7, what
the plan is for replacing flex posts when they are knocked over or displaced.
Mr. Rawson provided a quick summary. They have been working with DPW on Standard
Operating Procedures (SOPs) for years and have learned a lot. The City selected a different
product this year that is being installed in the street. If damaged the base post stays intact. 311
is also part of the SOP to help identify and route staff to the locations of flex posts to be
replaced. They are working to document the procedures to share with City Councilors.
Chair Niedergang asked what are the standards to replace the damaged flex posts and how are
they monitored.
Mr. Rawson stated 311 works for staff as well as constituents to report damaged flex posts.
The older vintage flex posts are being decommissioned and replaced with new ones.
RESULT:
WORK COMPLETED
Housekeeping - Items to be completed if no objections
202108: That the Administration work with the City of Cambridge to improve pedestrian
safety at the intersections of Elm Street with Beech Street and Willow Avenue, including
consideration of a Pedestrian Hybrid Beacon.
RESULT:
WORK COMPLETED
Traffic and Parking Committee
Page 7 of 12
Printed 11/3/2021
203446: That the Director of Traffic and Parking install additional pedestrian safety
measures at the intersection of Holland Street and Cameron Avenue.
RESULT:
WORK COMPLETED
203479: That the Administration update the Ward 6 Alderman on plans to improve way-
finding for the Community Path through Davis Square.
RESULT:
WORK COMPLETED
204247: That the Director of Traffic and Parking and the Chief of Police petition the City
of Cambridge to change Clarendon Avenue to a one way street, so it continues in the same
direction from Somerville to Massachusetts Avenue.
RESULT:
KEPT IN COMMITTEE
206189: That the Director of SPCD provide recommendations to improve pedestrian safety
at the dangerous intersection of Walnut Street, Summit Avenue and Boston Street.
RESULT:
WORK COMPLETED
206407: That the Director of SPCD, the City Engineer, and the Commissioner of Public
Works establish a written policy for deploying temporary safety and visibility materials for
the period between street re-paving and re-painting.
RESULT:
WORK COMPLETED
207326: That the Administration advise the Ward 6 Alderman of the notifications provided
to city and private contractors about anti-idling regulations, and revise such policies to
better ensure compliance.
RESULT:
WORK COMPLETED
207486: That the Director of Engineering and the Director of Traffic and Parking update
the Ward 6 Councilor on requests for crosswalks at locations specified within.
RESULT:
WORK COMPLETED
207487: That the Director of Traffic and Parking update the Ward 6 Councilor on requests
for crosswalk safety improvements at the locations specified within.
RESULT:
WORK COMPLETED
208008: That the Director of SPCD implement traffic calming and pedestrian and cyclist
safety measures on Broadway from Powder House Circle to Teele Square.
Traffic and Parking Committee
Page 8 of 12
Printed 11/3/2021
RESULT:
WORK COMPLETED
208575: That the Director of SPCD and the Director of Parking provide a quarterly update
regarding implementation of deed-based parking permit restrictions.
RESULT:
WORK COMPLETED
208685: That the Director of SPCD explain how decisions are made about Blue Bike rack
placement, including how the public gets informed.
RESULT:
WORK COMPLETED
208781: That the Director of SPCD and the Director of Parking develop a city-wide traffic
signaling policy that includes guidelines for temporary signaling during construction.
RESULT:
KEPT IN COMMITTEE
208782: That the Director of SPCD develop a city-wide signage policy to equitably inform
pedestrians, cyclists and vehicle operators during construction, closing of sidewalks, etc.
RESULT:
WORK COMPLETED
208901: That the Director of SPCD and the Chief of Police update this Council on what is
being done in the wake of the two deaths in two different hit and run incidents on Mystic
Avenue.
RESULT:
WORK COMPLETED
209142: That the Director of SPCD report to the Ward 6 Councilor on plans to improve
cyclist wayfinding through Davis Square.
RESULT:
WORK COMPLETED
209383: That the Director of SPCD update this Council on usage data for the Blue Bike
expansion stations of 2019, and plans for expanding the system in future years.
RESULT:
WORK COMPLETED
209477: That the Director of SPCD consider strategies to reduce the volume and impact of
package delivery vehicles, such as encouraging smaller or electric vehicles and cargo bike
parking, as has been tried in Manhattan and Seattle.
RESULT:
WORK COMPLETED
209758: That the Director of SPCD update this Council on creating a Bicycle Master Plan,
Traffic and Parking Committee
Page 9 of 12
Printed 11/3/2021
and requiring that future road work adhere to this plan.
RESULT:
WORK COMPLETED
209808: That the Director of SPCD develop a plan to create parking-separated bike lanes
on East Broadway.
RESULT:
WORK COMPLETED
210544: That the Chief of Police, the Director of Parking and the Director of SPCD discuss
enforcement to eliminate delivery and other vehicles from parking on protected bike lanes
throughout the city.
RESULT:
WORK COMPLETED
210624: That the Director of Finance, the Director of Parking and the Director of SPCD
discuss scaling parking permit fees with automobile size and efficiency.
RESULT:
WORK COMPLETED
210627: That the Director of SPCD update this Council on the Missatuck/Mystic River
bike and pedestrian bridge project.
RESULT:
WORK COMPLETED
210893: That the Mayor submit a supplemental budget request to immediately add staff
and funding to the Mobility Division for traffic calming, and increase its staff and funding
by at least 50% in FY22.
RESULT:
WORK COMPLETED
210895: That the Director of Capital Projects revise the College Avenue reconstruction
plan to include additional safety measures for pedestrians at both perpendicular and
parallel crossings.
RESULT:
WORK COMPLETED
210896: That the Director of SPCD update the Ward 6 Councilor on the overdue new
equipment necessary to improve signal timing in Davis Square.
RESULT:
WORK COMPLETED
210898: That the Director of SPCD update the Ward 6 Councilor on any plans to further
improve pedestrian safety at the intersection of Willow Avenue, Elm Street and Beech
Street, possibly with a center island and bump outs.
Traffic and Parking Committee
Page 10 of 12
Printed 11/3/2021
RESULT:
WORK COMPLETED
210932: That the Director of SPCD replace the NO BICYCLES ON SIDEWALK decals in
the city's business districts and work with the Pedestrian and Transit Advocacy Committee
to reduce conflicts between cyclists and pedestrians on sidewalks.
RESULT:
WORK COMPLETED
210985: That the Director of Parking discuss with the appropriate committee,
implementing income-based parking ticket fines for residents, as well as "day-fine" scales
to set ticket penalties according to an individual's daily income.
RESULT:
WORK COMPLETED
210988: That the Directors of Finance, Infrastructure and Asset Management, and SPCD
provide a progress report for the Vision Zero Action Plan 2020 as outlined in the attached
spreadsheet.
RESULT:
WORK COMPLETED
210989: That the Director of SPCD advise the Ward 7 Councilor when they will implement
the Mobility Plan for West Broadway (from Route 16 to Holland Street), to create a
dedicated bus lane.
RESULT:
WORK COMPLETED
210992: That the Mayor and the Chief of Police discuss with this Council why there is so
little traffic enforcement conducted by the Police Department, why its Traffic Division has
so few officers, and how it plans to address the public safety crisis made obvious with 4
pedestrians killed by motor vehicles in the past 2 years.
RESULT:
WORK COMPLETED
211227: That the Commissioner of Public Works install a temporary speed bump on
Sycamore Street between the main entrance and the schoolyard entrance of the Winter Hill
School.
RESULT:
WORK COMPLETED
211243: That the Director of Mobility and the Director of Infrastructure and Asset
Management collaborate to write responses to the questions contained within regarding the
Spring Hill separation project.
RESULT:
WORK COMPLETED
Traffic and Parking Committee
Page 11 of 12
Printed 11/3/2021
211256: That the Mayor direct department heads to prioritize the rapid construction of
physical infrastructure to slow traffic, protect our most vulnerable residents, and bring our
streets into compliance with the ADA, to address the killing of four pedestrians by motor
vehicles in the last two years and prevent further traffic fatalities.
RESULT:
WORK COMPLETED
211307: 221 citizens from the Somerville Alliance for Safe Streets submitting a Declaration
and Call to Action re: safe streets.
RESULT:
WORK COMPLETED
211327: That the Traffic Commission examine using the "psych trick" pedestrian safety
method, deployed in St. Paul, MN, to encourage drivers to stop for pedestrians crossing the
street.
RESULT:
WORK COMPLETED
211339: That Director of Mobility and the Chief Fire Engineer discuss the potential
impacts to the Teele Square Firehouse from the proposed Holland Street/Teele Square
infrastructure and repaving work.
RESULT:
WORK COMPLETED
211710: That the Directors of SPCD and Communications work with the Police, the Bicycle
Advisory Committee and the Pedestrian Transit Advisory Committee to implement a “Stop
on the Line Every Time” traffic safety public education and enforcement campaign.
RESULT:
WORK COMPLETED
211711: That the Director of SPCD work with the Police Department, especially the Traffic
Division, to train all Officers on Vision Zero.
RESULT:
WORK COMPLETED
211712: That the Chief of Police report to this Council on steps taken to train and
incentivize Detail Officers to enforce traffic laws when they observe motorists driving
unsafely.
RESULT:
WORK COMPLETED
211713: That the Administration advise this Council on a plan to improve the consistency
of staffing attendance for especially dangerous Traffic Management Plans, including the
current Belmont Street traffic detour.
Traffic and Parking Committee
Page 12 of 12
Printed 11/3/2021
RESULT:
WORK COMPLETED
211815: That the Director of SPCD re-convene the High School Parking Working Group
and provide an update on what is being done to understand and address parking issues for
teachers, staff, and residents.
RESULT:
WORK COMPLETED
211823: Sharing with the Council, the Administration and the public a 6-page blogpost
from State Representative Mike Connolly.
RESULT:
WORK COMPLETED
Referenced Material:
•
Beacon & Buckingham HAWK - Lt. Polito Email 10-20 (with 212254, 209148)
•
Email re Petition (with 212254, 209148)
•
Online Petition to replace the HAWK signal on Beacon St near Buckingham St (with 212254,
209148)
•
Petition signers HAWK Signal Buckingham and Beacon Sts (with 212254, 209148)