Matters ▸ Attachment
Committee Report - PUPW - 10-25-21 — File 212583
Public Utilities and Public Works Committee
Page 1 of 4
Printed 10/26/2021
October 25, 2021
REPORT OF THE PUBLIC UTILITIES AND PUBLIC WORKS COMMITTEE
Attendee Name
Title
Status
Arrived
Jesse Clingan
Chair
Present
William A. White Jr.
Vice Chair
Absent
Katjana Ballantyne
Ward Seven City Councilor
Present
Councilor-at-Large William White was not in attendance due to attending Rules Meeting.
Others present: Hannah Carrillo-Mayor’s Office, Eric Weisman-DPW, Brian Postlewaite-
Engineering, Nick Antanavica-ISD, Jill Lathan-DPW, Joel Diagostino-Eversource, Elizabeth
Toner-Eversource, Jean Hortsman-resident, Randi Soltysiak-Mothers Out Front and Karina
Wilkinson-Mothers Out Front.
The meeting was held virtually and was called to order at 6:03 p.m. by Chairperson Clingan and
adjourned at 7:11 p.m.
Approval of the September 27, 2021 Minutes
RESULT:
ACCEPTED
ISD
209691: That the Superintendent of Inspectional Services inform the Committee on Public
Utilities and Public Works whether the newspaper boxes throughout the city are permitted.
Mr. Antanavica stated that under the current ordinance, you need a certificate of compliance. He
also stated there are no current licenses that have been issued. They are trying to track down the
owners of the newspaper boxes. There are several provisions that talk about abandonment and
they will have DPW remove the boxes. Mr. Antanavica will get the process going within the
next couple of months and will update the committee in writing once the process has started.
RESULT:
WORK COMPLETED
DPW
210587: That the Commissioner of Public Works submit a recycling plan for all buildings
that do not receive city solid waste collection services, pursuant to Ordinance 11-40.
Public Utilities and Public Works Committee
Page 2 of 4
Printed 10/26/2021
Mr. Weisman stated they worked with ISD to get a list of all the dumpster permits in the city to
contact in emails. The communication will go out this week as well to large apartment
complexes within the next few days.
Councilor Ballantyne asked that large apartment building owners be required to provide
recycling options for tenants of buildings or condo owners. Mr. Weisman stated the letter will
require owners of buildings to submit a recycling plan to commissioner of DWP with a link to
include their plan. He also confirmed that buildings with 6 or fewer apartments can use the
city’s usual dumpster service.
RESULT:
WORK COMPLETED
211449: That the Administration create clean, safe, and permanent public restrooms in
several outdoor locations, similar to the "Portland Loos" that have been installed in
Cambridge.
Ms. Lathan provided an overview of the process and stated Portland Loos are custom made. She
stated they need to collaborate with Engineering, ISD, DPW and work with purchasing for a
contract. Each unit, including installation is about $200,000. They are looking into locations at
Davis Square and Foss Park. The city owned parking lot area in Union Square could be an
additional location in the future. Two locations will cost about $400,000. The next step is
working with purchasing to develop the scope and put out to bid.
Chair Clingan asked how many companies make this type of unit. Ms. Lathan stated that the
Portland Loos is leading the charge in this area.
Councilor Ballantyne asked if the intent is for public restrooms. She asked about the frequency
of use and who are the target audience for this request. Councilor Ballantyne stated that the city
should look at the new public library in Davis Square as an option, as well as the Baptist Church
building across the street. She asked additional questions about overnight usage and who would
be the target audience. Are there certain times of the days for frequency? Does it have to be this
particular model and/or other models to consider? Councilor Ballantyne also suggested using the
restroom at Foss Park pool area. Ms. Lathan stated the pool is only accessible during the
summer. Councilor Ballantyne suggested the city look at the city owned buildings for restrooms.
Ms. Lathan will continue to work with purchasing on scope and finance on potential funding
source. The chair will talk to Councilor Ewen-Campen on this matter.
RESULT:
WORK COMPLETED
212321: That the Commissioner of Public Works replace all the open garbage cans in city
parks and on the Community Path with closed rat-proof garbage cans.
Mr. Weisman stated he received a quote from Big Belly who proposed to break up the parks into
small and big parks. The small parks need 14 small containers and will cost $80,000 and larger
parks will cost $710,000 for a total of $790,000.
The chair asked if there are barrels that are rat resistant. Mr. Weisman stated that someone had
concerns about the handles on the barrels regarding rats climbing into it.
Public Utilities and Public Works Committee
Page 3 of 4
Printed 10/26/2021
He will come up with a plan where it makes the most sense to have the barrels. Additionally,
Mr. Weisman would like to work with the newly hired rat czar on options for barrels.
Councilor Ballantyne asked why Big Belly barrels vs. any other design that may be out there on
the market. Are they doing what we want them to do. Mr. Weisman stated Big Belly offers
technology to collecting trash and compacting the trash for a smaller footprint.
Councilor Ballantyne asked what is the advantage to compacting the trash. Is there a wash
maintenance for barrels? Mr. Weisman stated there is a quote to clean the entire fleet of Big
Belly trash compactors which can be carefully power washed and the baskets inside can be
swapped out.
The chair sponsored a resident, Ms. Horstman, who talked about the cost and timeliness of
figuring this out for the barrels. She also talked about kids and city employees being exposed to
rat feces. Chair Clingan asked how many barrels are around the city. Mr. Weisman stated we
have about 280 non-big belly and not sure how many Big Belly units. Big Belly quoted 109
barrels would cost $791,364 and to replace everything city wide legacy barrels would cost
$1.5M.
RESULT:
KEPT IN COMMITTEE
Mobility/Housekeeping
211595: That the Director of Mobility and the Commissioner of Public Works work with
the State Delegation to remove the hostile architecture public benches from the Davis
Square MBTA station.
Ms. Carrillo was not able to provide an update on this item. Chair Clingan would like a response
from the MBTA.
RESULT:
KEPT IN COMMITTEE
Eversource
212225: That Eversource representatives be requested to appear before the next meeting of
this Council’s Committee on Public Utilities and Public Works to respond to the gas leak
data along Somerville Avenue.
Mr. Postlewaite stated they had a visit with Eversource helping to better understand the natural
conditions. Understanding the specifics of the testing systems work. A couple of elements
where the diversity of places were non-pipeline issues. They do know there much older 48-inch
sewer pipe that is very deep, under the railroad and looking to see if there is any work needed on
the city side. He stated there is different technology to repairing and maintaining gas lines.
There is also concerns that may not include perfectly clean materials in the past.
Ms. Toner and Mr. Diagostino from Eversource appeared before the committee to address the
city’s concerns.
Mr. Diagostino talked about the holes drilled near the car wash that were probed and the tree
lawns. There were a lot of non-pipe gas line readings. They drilled some deeper holes and still
saw very low gas readings as non-pipe line gas. They are planning to meet to do more
Public Utilities and Public Works Committee
Page 4 of 4
Printed 10/26/2021
investigative work using the robotic system discussed at the previous meeting. There were some
readings of natural gas through their findings.
The chair sponsored members from Mothers Out Front to speak. Ms. Soltysiak stated she was
out there during the drilling and appreciates Eversource’s effort. Also Ms. Wilkinson agreed
with Ms. Soltysiak’s comments. Ms. Solysiak talked about a GEOThermal pilot to get the city
off using gas.
RESULT:
WORK COMPLETED
210739: That the Director of Engineering and the Director of Infrastructure and Asset
Management urge Eversource to fix gas leaks at 721 Somerville Avenue and nearby, as
identified by HEET, and appear with Eversource staff at the next meeting of the Council’s
Committee on Public Utilities and Public Works to discuss this matter.
See item #212225
RESULT:
WORK COMPLETED