Matters ▸ Attachment
Healey Remediation - Final — File 213081
Project Title:
Project Address:
Department:
Project Mgr.:
Email:
New Project or Modification:
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Project Description/Scope of Work:
Justification:
Relationship to Other Projects:
Category: Please check all appropriate boxes
Architectural/Engineering Feasibility Study
Architectural/Engineering Construction Document Services & Construction Admin
Building Alteration/Repair/Renovation/Addition/New Construction
Building Improvements (non-construction)
Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.)
Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.)
Street/Sidewalk/Monument Improvements
Water Improvements
Sewer Improvements
Land Development
Land Acquisition
Land Disposition
Parks and Open Space
Other:
Operational Impact:
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
Modification to Existing Project
Urgent
First
Remediation
What impact will this project have on operational costs?
5 Meacham Rd.
FORM A ‐ DESIGN & CONSTRUCTION
CAPITAL IMROVEMENT PROJECT (CIP) REQUEST ‐ FY22
Luisa Oliveira
Please note any additional operational costs that may be the result of this project, e.g. the enlargement of a new building will require
additional heating and cooling costs, additional custodial help, etc.
Healey School Remediation
The discovery of the contaminated soil requires immediate remediation and delay would cause signifcant project delay and additional cost
overruns
During Contruction of the Healey fields project unknown contaminated soil was discovered on the project. The contaminated soil must be
excavated and disposed of to an approved site in accordance with MADEP standards
PSUF
This project is a result of contamination discovered during the ongoing Healey fields project. Delay in remediation would cause significant
delays
Design and Construction Project Funding
Total Estimated Cost
Prior Years
Funding
FY 22
FY 23
FY 24
FY 26
FY 26
Capital Costs:
Feasibility Study
$ -
-
-
- -
-
Land Acquisition/Appraisal
$ -
-
-
- -
-
Environmental Remediation/LSP
$ 964,344
964,344
-
- -
-
Demolition & Site Clearance
$ -
-
-
- -
-
Owner's Proj. Mgr./Clerk of the Works
$ -
-
-
- -
-
Designer Services (SD through CA)
$ -
-
-
- -
-
Construction
$ -
-
-
- -
-
Insurance (builder's risk, addtl. Polices)
$ -
-
-
- -
-
Furniture & Equipment (FFE)
$ -
-
-
- -
-
Police Details
$ -
-
-
- -
-
Contingency
$ -
-
-
- -
-
Other:
$ -
- - - - -
Other:
$ -
- - - - -
Total:
$ 964,344
$ 964,344 $ ‐ $ ‐ $ ‐ $ ‐
Please provide suggested sources. This section will be finalized jointly by Finance and the Department.
Funding Sources:
Prior Years
Funding
FY 22
FY 23
FY 24
FY 25
FY 26
Stabilization Fund
$ -
-
-
- -
-
GO Bonds
$ -
-
- -
-
Retained Earnings
$ -
-
-
- -
-
General Fund
$ -
-
-
- -
-
Special Assmnt.
$ -
-
-
- -
-
Ch. 90
$ -
-
- -
-
Grants
$ -
-
-
- -
-
Receipts Reserved
$ -
-
-
- -
-
Other:
$ 964,344
964,344 - - - -
Other:
$ -
- - - - -
Total:
$ 964,344
$ 964,344 $ ‐ $ ‐ $ ‐ $ ‐
Evaluation Committee Use Only:
Reviewed and Approved By:
Version
Requesting Department
Date
Draft
Auditing
Date
Revised
Purchasing
Date
Accepted
Final Approval
-
-
$ ‐
-
-
-
-
-
-
-
-
-
-
-
$ ‐
-
-
-
-
-
-
-
-
-
-
Please describe how you developed these cost estimates. Include references to any supporting appraisals, studies, or other relevant background information that
bolsters the cost estimates. How long is tge estimate valid? Have you retained the services of an independent cost estimator?
Specify
Specify
Free Cash
Specify