REPORT OF THE PUBLIC UTILITIES AND PUBLIC WORKS COMMITTEE
Attendee Name
Title
Status
Arrived
Jesse Clingan
Chair
Present
Beatriz GomezMouakad
Vice Chair
Present
Charlotte Kelly
City Councilor At Large
Present
The meeting was held virtually and was called to order at 6:35 p.m. by Chairperson Clingan and
adjourned at 8:04 p.m.
Approval of the October 25, 2021 Minutes
RESULT:
ACCEPTED
DPW
212801: That the Commissioner of Public Works replace any non-working street lights
along Broadway, from McGrath Highway to Main Street.
There is a written response attached to the agenda stating this is not a simple request.
The chair stated that DPW met with the street light contractor this fall and the contractor
provided a estimate which needs trenching. This request is being addressed.
RESULT:
WORK COMPLETED
212842: That the Commissioner of Public Works address reports of trash barrels being
picked up by recycling trucks.
There is a written response to this request stating this fall the city’s trash and recycling contractor
changed its standard operating procedure and dedicated all its vehicles as (including both those
marked as Trash vehicles and those marked as Recycling vehicles) to clearing and dumping all recycling
first and then then shifting all vehicles to clearing and dumping all trash. This is a change from the old
procedure of doing both services simultaneously, but with dedicated equipment. The purpose of this
change is to shorten the time that trash and recycling vehicles are in the street. As a result, it may appear
that sometimes trash is being loaded into a “Recycling” truck, and sometimes that recycling is being
loaded into a trash truck.
The chair noticed there is a delay of when the trash and recycling is picked up.
Public Utilities and Public Works Committee
Page 2 of 5
Printed 2/18/2022
Councilor Gomez Mouakad stated her observation that trash barrels are on the sidewalks longer.
Both Councilors Gomez Mouakad and Kelly expressed interest in receiving additional
information on why the trash barrels are on the sidewalks longer.
Councilor Gomez Mouakad stated that with all the rodent issues, people are very sensitive about
trash.
Chair Clingan would like a representative from Boston Carting to come before the committee to
address a couple of issues.
RESULT:
KEPT IN COMMITTEE
212960: That the Commissioner of Public Works discuss the possibility of removing snow
and ice from playgrounds after snowstorms.
Director Sahni provided some comments from DPW. There would be a lot of risk to the
integrity of the surface given the porous grounds at the playground.
Councilor Kelly talked about the sidewalk snow shoveling pilot. There maybe a delicate way of
shoveling the playground and it would be helpful to get data on the pilot to use to clear the
playground.
Councilor Gomez Mouakad stated a shovel would puncture the material used at the playground.
RESULT:
WORK COMPLETED
212962: That the Commissioner of Public Works report on all school building deferred
maintenance projects completed following the ventilation system assessment, proposed
completion dates, and strategies to assess needs for future deferred maintenance projects.
Councilor Gomez Mouakad stated that in 2020 a study was done to improve ventilation and
assessment of the buildings. There were issues with Honeywell and the maintenance not being
done. She wants the administration to be clear on what was done for the buildings. She
understands there are still some things pending for the building. Councilor Gomez Mouakad
would like a list of what was fixed and what was not fixed. There should be a push on fixing the
schools and libraries and not have the teachers using space heaters.
Director Sahni provided an update from DPW commissioner that all buildings were balanced and
readied for students to come back to school. Several schools were updated for COVID upgrades.
Councilor Kelly asked what type of grant money is the city going after to handle these requests.
Councilor Gomez Mouakad asked who from the city staff is overseeing the school’s buildings.
RESULT:
KEPT IN COMMITTEE
OSPCD/Engineering
212828: That the Executive Director of the Office of Strategic Planning and Community
Development work with this Council to create policies to reduce the length of time that
construction projects block sidewalk access, including the possibility of increasing fees to
Public Utilities and Public Works Committee
Page 3 of 5
Printed 2/18/2022
discourage extended sidewalk closures.
No one from OSPCD or Engineering were available to attend tonight’s meeting. Councilor
Kelly asked if there are pedestrian safety plans for private or businesses when planning
construction. She stated far too many sidewalks are closed for weeks. Additionally, she
suggested there should information available at the city if residents ask questions about the
closing of sidewalks. Councilor Gomez Mouakad saw a sidewalk in Ward 5 that was closed and
anyone with a wheelchair would not be able to pass on the sidewalk.
Chair Clingan stated more discussion is needed on this request.
RESULT:
KEPT IN COMMITTEE
Fire/ISD
212961: That the Chief Fire Engineer report on the safety risks for all municipal buildings
not fully equipped with automatic sprinkler systems.
Director Sahni read from the written response from the city that any city building that may not
have sprinkler is because at the time of construction they were not required. He asked the
councilors if there are specific buildings of concern.
Councilor Gomez Mouakad raised the concern about older buildings presenting a risk. She gave
an example that the Brown School is not fully sprinklered. She said the chief fire engineer
should be flagging buildings of higher risk. The city needs to be a little more watchful of the
buildings.
Councilor Kelly is interested in getting a report on which buildings are not equipped with
automatic sprinkler systems. A report would be helpful to identify capital projects. She also
asked if the new committee is just school buildings or if it includes city buildings.
RESULT:
KEPT IN COMMITTEE
212965: That the Director of Inspectional Services and the Chief Fire Engineer report on
all life safety inspections and testing of life safety systems completed for the Armory
building in the past five years, and compliance with testing and inspections following
eminent domain actions.
Director Sahni stated a recent report was issued on January 11 this year on egress light, escape
window and other areas. He will provide the document to the committee.
Councilor Gomez Mouakad was in the Armory and noticed that the fire extinguishers were
expired.
Chair asked Director Sahn to attach the report to the agenda and for the next councilor’s meeting.
RESULT:
WORK COMPLETED
212969: That the Chief Fire Engineer provide this Council with the plan for staffing the
future Assembly Square fire station.
Public Utilities and Public Works Committee
Page 4 of 5
Printed 2/18/2022
Director Sahni stated a recent report was issued on January 11 this year on egress light, escape
window and other areas. He will provide the document to the committee.
Councilor Gomez Mouakad was in the Armory and noticed that the fire extinguishers were
expired.
Chair asked Director Sahni to attach the report to the agenda and for the next councilor’s
meeting.
RESULT:
KEPT IN COMMITTEE
Economic Development
212963: That the Director of Economic Development report on the maintenance plan for
the Armory building, completion of outstanding repairs, and ongoing maintenance and
operational oversight of the building.
Items 212963 and 212964 were discussed together.
Chair asked if there is a maintenance plan. Director Sahni stated its best that Director Galligani
speak on this matter.
Councilor Kelly asked Director Sahni when it would be best to bring these two items up again so
that the appropriate individuals are available to attend the committee meetings.
Director Sahni will coordinate with the key individuals to attend a future meeting to answer the
committee members questions.
RESULT:
KEPT IN COMMITTEE
212964: That the Director of Economic Development report on the status of existing leases
for the Armory building.
Items 212963 and 212964 were discussed together.
Director Sahni will make arrangements for Director Galligani to attend a future committee
meeting to answer questions from the committee members. The chair also asked if it’s common
for the Director of Economic Development to manage leases for the city.
Councilor Gomez Mouakad asked about staffing for the buildings. She also stated the city needs
to be clear and transparent with the lease for this building.
RESULT:
KEPT IN COMMITTEE
Parks and Recreation
212951: That the Director of Parks and Recreation report to this Council on the status of
the Veterans Memorial skating rink following its recent privatization.
The chair stated the intent is to have a conversation about the rink and how the city of Somerville
is longer managing the skating rinks.
Public Utilities and Public Works Committee
Page 5 of 5
Printed 2/18/2022
Director Sahni stated that the commissioner stated back in December that Veterans is DCR rink
and the city did not bid on it. He will share the previous communication from the commissioner
on this matter.
Councilor Kelly asked if DCR could provide a report that shows whether or not there has been a
decrease in participation maybe due to increased rate of .50 to $5.00.
Chair Clingan suggested having the person currently managing the skating rink come before the
committee.
RESULT:
WORK COMPLETED