SAUSI Somerville Ave_GF Supplemental Project Request Form_FY23_CIP — File 23-0530

File 23-0530·2 pages·📄 Original PDF (city portal)·sha256 758d68d788fc…
Project Title: Project Address: Department: Project Mgr.: Email: New Project or Modification: Date Created: Date Revised: 3/1/2023 Department Priority: Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth. Project Description/Scope of Work: Justification: Relationship to Other Projects: Category: Please check all appropriate boxes Architectural/Engineering Feasibility Study Architectural/Engineering Construction Document Services & Construction Admin Building Alteration/Repair/Renovation/Addition/New Construction Building Improvements (non-construction) Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.) Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.) Street/Sidewalk/Monument Improvements Water Improvements Sewer Improvements Land Development Land Acquisition Land Disposition Parks and Open Space Other Operational Impact: What impact will this project have on operational costs? Reduce Cost (greater than 5%) Reduce Cost (less than 5%) Cost Unchanged Increase Cost (less than 5%) Increase Cost (greater than 5%) Union Square and associated area around Somerville Ave FORM A - DESIGN & CONSTRUCTION CAPITAL IMROVEMENT PROJECT (CIP) REQUEST - FY23 Dan Amelin damelin@somervillema.gov This project will require additional operational and maintenance costs for items such as, but not limited to, new irrigation systems, new separated cycle tracks, new traffic signal controls, etc. Somerville Ave Utility and Streetscape Improvements (SAUSI) - General Fund Supplemental This project was originally intended to address historical, localized flooding in the Union Square area, caused by an over taxation on the City's combined sewer system. With upgrades to the sewer and drainage systems, the goal of this project is to reduce the volume of combined sanitary flows being treated by the MWRA, reduce risk associated with aging infrastructure, resolve existing system deficiencies, improve stormwater management, and improve the area's multi-modal transportation network. Supplemental appropriation request to fund 5164 General Fund. Will fund contractor's additional work related to contaminated soil removal, project delays, and extended overhead costs related to the streetscape construction portion of the Somerville Avenue Utility and Streetscape Improvements project. The SAUSI project encompasses a portion of Somerville Ave from Union Square to McGrath Highway, in addition to sections of adjacent side streets. The intent of this project is to separate combined sewers into two dedicated sewer and drain lines, upgrade the City's water, sewer, and drainage systems, and reconstruct the surface streetscape to include new ADA compliant sidewalks, new bicycle facilities, new green infastructure, and improved street lighting and traffic signalization. IAM - Engineering The SAUSI project is directly related to the Poplar Street Pump Station project (in design), the Spring Hill Sewer Separation Phase 1 project (in construction), Spring Hill Sewer Separation Phase 2B project, and Highland Avenue Reconstruction project. These projects, including SAUSI, make up the five-part Union Square Infrastructure Improvement program. Select Project Priority Modification to Existing Project Select Priority Order
Design and Construction Project Funding Total Estimated Cost Prior Years Funding FY 23 FY 24 FY 25 FY 26 FY 27 Capital Costs: Feasibility Study $ - Land Acquisition/Appraisal $ - Environmental Remediation/LSP $ - Demolition & Site Clearance $ - Owner's Proj. Mgr./Clerk of the Works $ - Designer Services (SD through CA) $ - Construction $ 4,200,000 $ 3,200,000 $ 1,000,000 Insurance (builder's risk, addtl. Polices) $ - Furniture & Equipment (FFE) $ - Police Details $ - Construction Contingency $ - Design Contingency $ - Other (Specify) $ - Total: $ 4,200,000 $ - $ 3,200,000 $ 1,000,000 $ - $ - $ - Please provide suggested sources. This section will be finalized jointly by Finance and the Department. Funding Sources: Prior Years Funding FY 23 FY 24 FY 25 FY 26 FY 27 Stabilization Fund $ - GO Bonds - GF $ 4,200,000 3,200,000 1,000,000 GO Bonds - Water $ - GO Bonds - Sewer $ - Retained Earnings $ - General Fund $ - Special Assmnt. $ - - - - - - - Ch. 90 $ - Grants $ - - - - - - - Receipts Reserved $ - Other - MassWorks Sewer Grant $ - - - - - - Other - MassWorks Water Grant $ - - - - - - Total: $ 4,200,000 $ - $ 3,200,000 $ 1,000,000 $ - $ - $ - Evaluation Committee Use Only: Reviewed and Approved By: Version Requesting Department Date Draft Auditing Date Revised Purchasing Date Accepted Final Approval Existing General Fund bond on fund 5146. Request that the original authorization be increased by $4,200,000. Debt service to be paid from the General Fund.