SAUSI Somerville Ave_GF Supplemental Project Request Form_FY23_CIP — File 23-0530
Project Title:
Project Address:
Department:
Project Mgr.:
Email:
New Project or Modification:
Date Created:
Date Revised:
3/1/2023
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Project Description/Scope of Work:
Justification:
Relationship to Other Projects:
Category: Please check all appropriate boxes
Architectural/Engineering Feasibility Study
Architectural/Engineering Construction Document Services & Construction Admin
Building Alteration/Repair/Renovation/Addition/New Construction
Building Improvements (non-construction)
Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.)
Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.)
Street/Sidewalk/Monument Improvements
Water Improvements
Sewer Improvements
Land Development
Land Acquisition
Land Disposition
Parks and Open Space
Other
Operational Impact:
What impact will this project have on operational costs?
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
Union Square and associated area around Somerville Ave
FORM A - DESIGN & CONSTRUCTION
CAPITAL IMROVEMENT PROJECT (CIP) REQUEST - FY23
Dan Amelin
damelin@somervillema.gov
This project will require additional operational and maintenance costs for items such as, but not limited to, new irrigation systems, new
separated cycle tracks, new traffic signal controls, etc.
Somerville Ave Utility and Streetscape Improvements (SAUSI) - General Fund Supplemental
This project was originally intended to address historical, localized flooding in the Union Square area, caused by an over taxation on the
City's combined sewer system. With upgrades to the sewer and drainage systems, the goal of this project is to reduce the volume of
combined sanitary flows being treated by the MWRA, reduce risk associated with aging infrastructure, resolve existing system
deficiencies, improve stormwater management, and improve the area's multi-modal transportation network.
Supplemental appropriation request to fund 5164 General Fund. Will fund contractor's additional work related to contaminated soil
removal, project delays, and extended overhead costs related to the streetscape construction portion of the Somerville Avenue Utility and
Streetscape Improvements project. The SAUSI project encompasses a portion of Somerville Ave from Union Square to McGrath Highway,
in addition to sections of adjacent side streets. The intent of this project is to separate combined sewers into two dedicated sewer and
drain lines, upgrade the City's water, sewer, and drainage systems, and reconstruct the surface streetscape to include new ADA compliant
sidewalks, new bicycle facilities, new green infastructure, and improved street lighting and traffic signalization.
IAM - Engineering
The SAUSI project is directly related to the Poplar Street Pump Station project (in design), the Spring Hill Sewer Separation Phase
1 project (in construction), Spring Hill Sewer Separation Phase 2B project, and Highland Avenue Reconstruction project. These projects,
including SAUSI, make up the five-part Union Square Infrastructure Improvement program.
Select Project Priority
Modification to Existing Project
Select Priority Order
Design and Construction Project Funding
Total Estimated Cost
Prior Years
Funding
FY 23
FY 24
FY 25
FY 26
FY 27
Capital Costs:
Feasibility Study
$ -
Land Acquisition/Appraisal
$ -
Environmental Remediation/LSP
$ -
Demolition & Site Clearance
$ -
Owner's Proj. Mgr./Clerk of the Works
$ -
Designer Services (SD through CA)
$ -
Construction
$ 4,200,000
$ 3,200,000 $ 1,000,000
Insurance (builder's risk, addtl. Polices)
$ -
Furniture & Equipment (FFE)
$ -
Police Details
$ -
Construction Contingency
$ -
Design Contingency
$ -
Other (Specify)
$ -
Total:
$ 4,200,000 $ - $ 3,200,000 $ 1,000,000 $ - $ - $ -
Please provide suggested sources. This section will be finalized jointly by Finance and the Department.
Funding Sources:
Prior Years
Funding
FY 23
FY 24
FY 25
FY 26
FY 27
Stabilization Fund
$ -
GO Bonds - GF
$ 4,200,000
3,200,000 1,000,000
GO Bonds - Water
$ -
GO Bonds - Sewer
$ -
Retained Earnings
$ -
General Fund
$ -
Special Assmnt.
$ - - - - - - -
Ch. 90
$ -
Grants
$ - - - - - - -
Receipts Reserved
$ -
Other - MassWorks Sewer Grant
$ -
- - - - -
Other - MassWorks Water Grant
$ -
- - - - -
Total:
$ 4,200,000 $ - $ 3,200,000 $ 1,000,000 $ - $ - $ -
Evaluation Committee Use Only:
Reviewed and Approved By:
Version
Requesting Department
Date
Draft
Auditing
Date
Revised
Purchasing
Date
Accepted
Final Approval
Existing General Fund bond on fund 5146. Request that the original authorization be increased by $4,200,000. Debt service to be paid from the General Fund.