BROWN SCHOOL STATEMENT OF INTEREST 2023
The following Priorities have been included in the Statement of Interest:
1. Replacement or renovation of a building which is structurally unsound or otherwise in
a condition seriously jeopardizing the health and safety of school children, where no
alternative exists.
2. Elimination of existing severe overcrowding.
3. Prevention of the loss of accreditation.
4. Prevention of severe overcrowding expected to result from increased enrollments.
5. Replacement, renovation or modernization of school facility systems, such as roofs,
windows, boilers, heating and ventilation systems, to increase energy conservation and
decrease energy related costs in a school facility.
6. Short term enrollment growth.
7. Replacement of or addition to obsolete buildings in order to provide for a full range of
programs consistent with state and approved local requirements.
8. Transition from
SOI Vote Requirement
I acknowledge that I have reviewed the MSBA’s vote requirements for submitting an SOI
which are set forth in the Vote Tab of this SOI. I understand that the MSBA requires
votes from specific parties/governing bodies, in a specific format using the language
provided by the MSBA. Further, I understand that the MSBA requires certified and
signed vote documentation to be submitted with the SOI. I acknowledge that my SOI will
not be considered complete and, therefore, will not be reviewed by the MSBA unless the
required accompanying vote documentation is submitted to the satisfaction of the MSBA.
SOI Program: Core Program
Potential Project Scope:
Extensive Repair
Possible New School
Renovation / Addition
Is this SOI the District Priority SOI? No
School Name of the District Priority SOI? Winter Hill Community Innovation School
Is this part of a larger facilities plan? No
If YES, please provide the following:
● Facilities Plan Date: N/A
● Planning Firm: N/A
● Please provide a brief summary of the plan, including its goals and how the
school facility that is the subject of this SOI fits into that plan. N/A
BROWN SCHOOL STATEMENT OF INTEREST 2023
Please provide the current student to teacher ratio at the school facility that is the
subject of this SOI: 14.5 to 1
Please provide the originally planned student to teacher ratios at the school facility that
is the subject of this SOI: 15 to 1
Does the District have a Master Educational Plan that includes facility goals for this
building and all school buildings in the District? Yes.
Does the District have related report(s)/document(s) that detail its facilities,
student configuration at each facility, and District operational budget information,
both current and proposed? No
If YES, please provide title, author, and date of report in the area below.
Please include a hard copy of these report(s)/document(s).
Because the Somerville School Committee believes that no group of students should be
disproportionately impacted by district enrollment policies and that all students should have
access to support they need, by 2025, we will 1) conduct a district enrollment study to
understand the prospective future population of the district and 2) create and begin
implementing a strategy for school building development, school assignment, and programming
that aligns with the district’s equity policy, and which is based on results of the enrollment study
and the projected 10+ year plan for school facilities. We will engage students and families in this
process to design a school assignment policy grounded in equity and in the values of our
community.
Is there overcrowding at the school facility? No
If YES, please describe in detail, including specific examples of the overcrowding. N/A
Has the district had any recent teacher layoffs or reductions? No
If YES, how many teaching positions were affected? N/A
At which schools in the district?
Please describe the types of teacher positions that were eliminated (e.g. art, math,
science, physical education, etc.).
Has the district had any recent staff layoffs or reductions? No
If YES, how many staff positions were affected? N/A
At which schools in the district?
Please describe the types of staff positions that were eliminated (e.g. guidance,
administrative, maintenance, etc.).
BROWN SCHOOL STATEMENT OF INTEREST 2023
Please provide a description of the program modifications as a consequence of these
teacher and/or staff reductions, including the impact on district class sizes and
curriculum. N/A
Please provide a description of the local budget approval process for a potential capital
project with the MSBA. Include schedule information (i.e. Town Meeting dates, city
council/town council meetings dates, regional school committee meeting dates). Provide,
if applicable, the District’s most recent budget approval process that resulted in a budget
reduction and the impact to the school district (staff reductions, discontinued programs,
consolidation of facilities).
The SPS budget is subject to approval by the School Committee, typically in April or May. The
budget is then subject to final vote by the City Council during the City’s budget process that
culminates in a series of public meetings and public hearings in June.
Building and capital projects in the Somerville Public Schools fall under the purview of the City
of Somerville’s Capital Projects management and overall Infrastructure and Asset Management
Department for the City. The City maintains a 5-year Capital Investment Plan that helps drive
Somerville’s overall capital investment strategy and takes into account both internal and
external fiscal factors. Though the City continues to have a strong bond rating and strong fiscal
management and performance, we would be prepared to utilize a number of tools to finance a
potential new school building within our district that could include a combination of public
municipal funds as well as the possibility of a Proposition 2 ½ vote.
____
GENERAL DESCRIPTION
BRIEF BUILDING HISTORY: Please provide a detailed description of when the original
building was built, and the date(s) and project scope(s) of any additions and renovations
(maximum of 5000 characters).
Built in 1900, the Brown School is the oldest elementary school in Somerville. Six years after the
original construction the school was filled to capacity, necessitating expansion. An addition was
completed to the east in 1907, mirroring the original primary massing and completing the
symmetrical "H" in plan and elevation. The 1901 east secondary stair was demolished, the
corridors were extended, and a new stairwell was included in the addition with an at-grade exit
to the east. In 2015, a flat section of the roof was replaced following a partial collapse. The
collapse was the result of a number of factors including significant snowfall and related weather
conditions and wood rafters that were found today to be weakened by pre-existing partial
rotting. The current building is a two and a half story, 41,000 square foot brick veneer structure.
TOTAL BUILDING SQUARE FOOTAGE: Please provide the original building square
footage PLUS the square footage of any additions.
BROWN SCHOOL STATEMENT OF INTEREST 2023
41,000 square feet
SITE DESCRIPTION: Please provide a detailed description of the current site and any
known existing conditions that would impact a potential project at the site. Please note
whether there are any other buildings, public or private, that share this current site with
the school facility. What is the use(s) of this building(s)? (maximum of 5000 characters).
The Brown School is located on a 0.6-acre (26,733 sq. ft.) site at the intersection of Willow,
Kidder, and Josephine Avenues. It is bordered by these three paved streets and by residential
properties on the fourth side. It is the oldest school building in our school district’s portfolio and
was constructed in 1900 with an addition added in 1907. There are no other buildings that share
space with the school facility on this site. The site includes the two and a half story brick school
building, a large, paved school yard, and small, fenced, perimeter landscaped areas between
the building and the adjacent streets. The Brown School is in the State’s Cultural Resource
Inventory but is not locally designated.
Of note in a 2022 “Building Renovation & Department Relocation Master Plan,” by Beyer,
Blinder, and Belle, were the following issues. The main roof is nearing the end of its useful life.
Floors are not level and foundation wall cracks have appeared due to structural shifting, there is
asbestos flooring that is encapsulated by carpet, and the brickwork needs to be repointed.
ADDRESS OF FACILITY: Please type address, including number, street name and
city/town, if available, or describe the location of the site. (Maximum of 300 characters)
201 Willow Avenue, Somerville, MA 02144
BUILDING ENVELOPE: Please provide a detailed description of the building envelope,
types of construction materials used, and any known problems or existing conditions
(maximum of 5000 characters).
The Brown School consists of structural masonry exterior bearing walls and what are likely
wood-framed structural floors. There is a large stress crack in the masonry on the north
elevation. The roof is a combination of slate and asphalt, both believed to be original. The brick
exterior of the entire structure is trimmed with limestone, and limestone is also used for the
window sills and keystones.
The envelope and MEP systems are antiquated and inefficient. An accessible rear entrance
ramp was added more recently, and various interiors and equipment were updated through the
years, but the building's physical plant has areas of significant age and deterioration that require
a comprehensive building rehabilitation.
Radiating zones of distress in the structure, envelope, and granite foundations are observed on
the north and east facades, with the origination of these issues located at the north facade of
the 1907 addition where it abuts the original structure. There is evidence of cracking in the
BROWN SCHOOL STATEMENT OF INTEREST 2023
foundation walls, in the adjacent slab on grade as well as significant deflection of the floor
structures above.
An estimated 25% of total wall area on the building will need repointing, with limited areas of full
repointing. Chimneys are in fair to poor condition and will require full repointing as well as partial
to full rebuilding from the roof upwards. The existing windows are non-original aluminum inserts,
and the upper third of each masonry opening is infilled with a metal spandrel panel. The
aluminum windows are in fair to good condition. The non-original replacement doors are in fair
to poor condition with numerous areas of corrosion and signs of heavy wear. The east and west
stoops are in very poor condition and require full rebuild. The accessible ramped entrance on
the north facade is constructed of concrete masonry units with a flat roof and should be
removed with the reconfiguration of an accessible entry sequence into the building.
Has there been a Major Repair or Replacement of the EXTERIOR WALLS? No
Year of Last Major Repair or Replacement (YYYY)
Description of Last Major Repair or Replacement:
Roof Section
Is the District seeking replacement or the Roof Section? No
Area of Section (square feet)
Type of ROOF (e.g. PVC, EPDM, Shingle, Slate, Tar & Gravel, Other (please
describe)) EPDM
The main roof is a moderately sloped, hipped design with deep overhanging eaves on all
sides of the building. The ancillary shorter two-story toilet wing has a flat roof with
parapets. The west wing of the roof is covered with slate shingles. The central and east
wings are covered with composite asphalt shingles. There are five large brick masonry
chimneys with multiple flues and risers.
The areas of slate roof look to be in fair to good condition overall. The composite asphalt
roofing looks to be in fair condition, with visible patched areas where penetrations were
re-flashed, and surface wear elsewhere. On the toilet wing, the low-slope membrane and
parapet flashing looks to be in good condition, and is presumed to date from the last five
years after the roof collapsed in this area circa 2015.
Age of Section (number of years since the Roof was installed or replaced): 8 years
Description of repairs, if applicable, in the last three years. Include year of repair:
In 2015, a flat section of the roof was replaced following a partial collapse. The collapse
was the result of a number of factors including significant snowfall and related weather
conditions and wood rafters that were found today to be weakened by pre-existing partial
rotting.
BROWN SCHOOL STATEMENT OF INTEREST 2023
Window Section
Is the District seeking replacement of the Windows Section? No
Windows in Section (count)
Type of WINDOWS (e.g. Single Pane, Double Pane, Other (please describe))
Description of repairs, if applicable, in the last three years. Include year of repair:
Under a DCAM Emergency Waiver, the roof was replaced in-kind with new wooden
joists and a flat roofing system, and the damage to bathrooms and utility rooms below
was repaired.
MECHANICAL and ELECTRICAL SYSTEMS: Please provide a detailed description of the
current mechanical and electrical systems and any known problems or existing
conditions (maximum of 5000 characters).
The main electrical service panel consists of 400 amperes, which feeds a sub panel on each
corridor. There is no sign of surge protection in the building. The heating system is a steam
system providing heat through cast iron radiators. The primary heating source for the building is
steam radiators. There are two gas-fired low-pressure steam boilers in the first floor mechanical
room, which are nearing the end of their service life. The boiler has a Honeywell control system.
The condensate receiver and pumps are also nearing the end of their service life. The third floor
is not served by the main heating system. Two gas-fired boilers are abandoned in place in the
attic, and these spaces, including the library and storage areas, are heated and cooled with
Fujitsu mini-split heat pumps with outdoor units on the flat roof.
Only the Basement and Third Floor levels are sprinklered. A "major alteration" will require
providing an automatic sprinkler system throughout.
There is no accessible route to any level apart from the basement currently, and no existing
elevator.
Boiler Section
Is the District seeking replacement of the Boiler? No
Is there more than one boiler room in the School? No
What percentage of the School is heated by the Boiler? 100%
Type of heating fuel (e.g. Heating Oil, Natural Gas, Propane, Other) Natural Gas
Age of Boiler (number of years since the Boiler was installed or replaced) 6-7
years
Description of repairs, if applicable, in the last three years. Include year of repair:
N/A
Has there been a Major Repair or Replacement of the HVAC SYSTEM? Yes. 5
Supplemental mini-split systems, window A/C units in each classroom.
Year of Last Major Repair or Replacement: (YYYY) 2018
BROWN SCHOOL STATEMENT OF INTEREST 2023
Description of Last Major Repair or Replacement: A/C units installed in each
classroom.
Has there been a Major Repair or Replacement of the ELECTRICAL SERVICES
AND DISTRIBUTION SYSTEM? Yes. panel replacement in 2015. Installed additional
panels and transformer in 2018/2019
Year of Last Major Repair or Replacement: (YYYY) 2018
Description of Last Major Repair or Replacement: N/A
BUILDING INTERIOR: Please provide a detailed description or the current building
interior including a description of the flooring systems, finishes, ceilings, lighting, etc.
(maximum of 5000 characters).
The school suffers from several program deficits, including the lack of a dedicated cafeteria or
gymnasium, and no building-wide accessibility.
The original architect’s floor plan rendering called for three classrooms per floor on the two
principal floors with a secondary passageway, intended to function as both a coat room and
second means of egress for each classroom. Two play rooms were located in the raised
basement level. Currently there are classrooms in the basement level, and these original
passageways work as swing spaces for any services students might receive throughout the day,
whether occupational therapy, language, or reading assistance. Lunch is held in student
classrooms, as are specialist classes such as music, and physical education. The school library
is now in the attic space. The school is not ADA accessible.
The interior walls are a combination of gypsum and horsehair plaster. Classroom ceilings are
2’x4’ acoustical tiles with suspending grid patterns. The music room and teacher’s room are
located in the basement next to the boiler room. Most hallway and classroom floors consist of
vinyl asbestos and composition tile. Some classrooms have carpeting. Many of the exterior and
interior doors need to be replaced. Most fixtures and millwork is consistent with the 1900 model
schools décor. Third floor library was renovated in the late 1980s, with built-in skylight
throughout.
PROGRAMS and OPERATIONS: Please provide a detailed description of the current
grade structure and programs offered and indicate whether there are program
components that cannot be offered due to facility constraints, operational constraints,
etc. (maximum of 5000 characters).
The Brown School is the oldest school in the district and also the district’s only K-5 school. It is
home to 211 students:
● First language not English: 28%
BROWN SCHOOL STATEMENT OF INTEREST 2023
● Economically Disadvantaged: 15.2%
● Multilingual learner: 6.2%
● Students with Disabilities: 8.1%
● High Needs: 26.1%
● Student Population: 211
There is no gymnasium, cafeteria, or areas for full school assemblies. Physical education
classes must be held in the school yard, classrooms, or in the library. Students receiving OT or
PT services in the school must do so in the hallways due to lack of common space. There is no
dedicated art, music, computer lab, or science room. This creates challenges with scheduling
and storage. Due to the lack of cafeteria area, students must eat lunch in their classroom, and
carry trays of hot food up and down stairs, creating a potentially unsafe situation. Space in the
basement floor of the building has been renovated into classroom space, however recent leaks
in the basement required the closure of a space designated as an art classroom. The building is
not handicapped accessible, and there are limited existing universal accessible routes and
entrances. There is no intercom system in the building.
Temperature dysregulation leads to extreme temperatures in the early fall and late spring in
third floor classrooms and library space, which is also used for indoor physical education, lunch,
and family meetings. There is no private space available for confidential conversations between
students and counselors. Loss of rooms due to leaks, temperature dysregulation, and other
facility needs has led to a need for art and music teachers to travel throughout the building or
offsite to host classes for Brown School students. There is also no dedicated space for
afterschool programming at the Brown School, despite significant and increasing over-
enrollment in the district’s afterschool programs, meaning we cannot provide critical programs
for students and families who need afterschool care and child care.
A building addition and/or improvements planned for this site offer a major opportunity to
improve site programming for the school. Currently, the school doesn’t have a gym and play
space is limited to the paved courts (no play structures).
EDUCATIONAL SPACES: Please provide a detailed description of the Education Spaces
within the facility, a description of the number and sizes (in square feet) of classrooms, a
description of science rooms/labs including ages and most recent updates, a description
of the cafeteria, gym and/or auditorium and a description of the media center/library
(maximum of 5000 characters).
The basement houses 3 classrooms (each approximately 750 square feet), a food service area,
the teacher's room, a boys’ bathroom, storage, and the Boiler room. The first floor houses 5
classrooms (each approximately 880 square feet), the girls’ bathroom, front office, and a staff
restroom. The second floor houses 5 classrooms (each approximately 880 square feet) plus the
nurse's office. The third floor has 2 classrooms (each approximately 700 square feet), a library
area, and a Resource room. There is no dedicated science lab or classroom, no dedicated
BROWN SCHOOL STATEMENT OF INTEREST 2023
computer lab, no gym or physical education space, no dedicated art or music classroom, and no
common area for assemblies or family meetings. The building is not ADA accessible and
presents challenges for students needing OT, PT, or other services. These services are
provided in the hallways.
CAPACITY and UTILIZATION: Please provide the original design capacity and a detailed
description of the current capacity and utilization of the school facility. If the school is
overcrowded, please describe steps taken by the administration to address capacity
issues. Please also describe in detail any spaces that have been converted from their
intended use to be used as classroom space (maximum of 5000 characters).
Every classroom in the building is occupied and classes are at full capacity, including three
modified spaces in the basement. Storage space is very limited, and at times, hallways are used
to store equipment or other materials, creating a potential fire hazard.
MAINTENANCE and CAPITAL REPAIR: Please provide a detailed description of the
district’s current maintenance practices, its capital repair program, and the maintenance
program in place at the facility that is the subject of this SOI. Please include specific
examples of capital repair projects undertaken in the past, including any override or debt
exclusion votes that were necessary (maximum of 5000 characters).
The facility is maintained by the Department of Public Works, Scheduled maintenance of the
HVAC system is by outside contracted vendor (J.C. Cannistraro). All other systems receive
annual in-house maintenance during summer months when the facility is less active.
Unscheduled maintenance is initiated by reports from school or custodial staff to a computerized
work order system. Capital improvements such as the aforementioned roof and new boilers are
conducted as part of a continually evolving five-year Capital Improvements Plan. All projects are
subject to funding availability. No previous work has required overrides or debt exclusion.
The Brown School is under an aggressive mechanical preventative maintenance program
including quarterly filter changes, seal and fluid inspections and changes. Capital projects are
budgeted based on the subject item’s End of Useful Life (EUL) schedule. Currently the building
is not slated for any large-scale capital projects.
Capital Projects over the past ten years have include replacement of the electrical system,
installation of 5 mini-split systems, boiler replacement, and electrical panel and transformer
updates.
_____
BROWN SCHOOL STATEMENT OF INTEREST 2023
PRIORITY 7: Replacement of or addition to obsolete buildings in order to provide for a
full range of programs, consistent with state and approved local requirements.
Question 1: Please provide a detailed description of the programs not currently available
due to facility constraints, the state or local requirement for such programs, and the
facility limitations precluding the programs from being offered.
The Brown School does not have consistent, dedicated spaces for art, music, physical
education, a computer lab, or science in specialized learning environments. State Requirements
for these programs are for dedicated classrooms consistent with MSBA guidelines. The Brown
School is not ADA accessible, prohibiting any specialized program in the district from being
located at the Brown. There is no gym which severely restricts the Physical Education program.
P.E. classes are held in classrooms or the library, or when weather permitting, outside in a
paved school yard. No P.E. equipment is available at the Brown School. While the school
department does meet the local and state requirement for P.E. at the Brown School, the
program is not able to provide the same type of activities as at other schools in the district.
There is no kitchen or cafeteria at the Brown School. Lunches are prepared off-site and
students eat lunch in their classrooms. The Brown School is limited in the menu served; for
example, all elementary schools in the district provide a fresh salad bar. The Brown School is
not able to provide this service. While the school foodservice department is able to meet all
state and local requirements, the foodservice department is not able to provide the same type of
meals as at other schools in the district.
Question 2: Please describe the measures the district has taken or is planning to take in
the immediate future to mitigate the problem(s) described above.
The Brown School does not have consistent, dedicated spaces for art, music, physical
education, a computer lab, or science in specialized learning environments. Physical education
is taught outside on an asphalt playground during acceptable weather or in the library or
classrooms during inclement weather. Lunches are prepared off site, then transported to the
school. Students eat lunch in their respective classrooms. Due to the age and condition of the
building, opportunities for renovation are limited and will not allow for adequate expansion of
operations to accommodate the student population. There are no existing facilities to house
students and staff; previously-utilized buildings for other school projects have been exhausted.
The former Edgerly School building currently houses the SPS Central Administration Offices,
Somerville Parks & Recreation offices and programs for youth of all ages, and a dedicated Teen
Center and gymnasium. The former Cummings School houses offices and other spaces for
construction projects. Space previously allocated at Somerville High School for temporary
classrooms is no longer available with the school’s reconstruction. The only available option at
this time would be the use of modular units.
BROWN SCHOOL STATEMENT OF INTEREST 2023
Question 3: Please provide a detailed explanation of the impact of the problem described
in this priority on your district’s educational program. Please include specific examples
of how the problem prevents the district from delivering the educational program it is
required to deliver and how students and/or teachers are directly affected by the problem
identified.
For art, music, and science, lack of dedicated space prevents teachers from offering a full
complement of subject activities that would be equitable and similar to those offered in schools
which have such dedicated spaces. The same issues apply to physical education. As stated
above, the Physical Education program does not have a dedicated space. The P.E. teacher
must provide instruction in classroom spaces that are not large enough or equipped to hold P.E.
classes. The inside classrooms are not large enough for students to participate in physical
activity. The outside space has no equipment. The school lunch program has worked to bring in
attractive and nutritious meals. Special baskets were purchased by the foodservice department
to enable lunches to be more easily carried by young students to their classrooms.