IAM School Building Readiness Memo 8.25 — File 25-1333
Infrastructure & Asset Management
Work to Benefit Somerville Public
Schools, Summer 2025
a.k.a. What IAM did during school summer vacation
Report for Somerville City Council and School Committee
Katjana Ballantyne, Mayor
Richard E. Raiche, Director of Infrastructure & Asset Management
Ralph Henry, Director of Capital Projects
August 25, 2025
Argenziano Kitchen
Expansion Project
IAM-Capital Projects completed expansion work to the main
kitchen. Work included installation of a new 88 sq. ft. walk-in
freezer, one new electric-ventless double oven and
relocation/installation of equipment from the Winter Hill
school such as a tilting kettle and 3 blast chiller units.
2
New Walk- In Freezer
New 88 square foot walk-in freezer. Approximate dimensions are 11’ L x 7’ W x 9’ H
3
New Blodgett Electric Double Oven
New additional electric oven has essentially doubled the cooking capacity for the kitchen
4
Relocated Items from Winter Hill
Additional items from Winter Hill; tilting kettle and 3 blast freezers. Existing floor mixer was nudged over to fit the tilting
kettle. 3rd blast freezer (not shown) is located across from new walk-in freezer.
5
Argenziano School
Classroom Addition
This project, the construction of a new 850 square foot classroom
in the existing atrium area on the 3rd floor of the school is in
progress. The work includes new technology, storage cabinetry,
sink, lockers and updated fire safety devices.
Anticipated completion: End of September/Early October.
6
Before Construction Activity
Atrium area prior to construction activity.
7
Construction Activity to Date
Metal stud wall fabrication and rough electrical, plumbing
and fire protection systems.
8
Construction Activity to Date - Continued
Wall blocking, sound insulation and drywall installation. Next steps, joint compound, primer & paint!
9
Winter Hill @ Edgerly ADA
Improvements
IAM-Engineering performed accessibility improvements
on Bonair Street including widening the curb cut, new
concrete sidewalks and signage.
10
Construction Activity: WH @ Edgerly
Views of the construction activity for the accessibility improvements on Bonair Street. This provides a new accessible
ramp and parking space on Bonair St., and a repaved walkway to the building entrance.
11
Construction Activity: WH @ Edgerly
Views of the completed accessibility improvements on Bonair Street. PSUF will plant a new tree in the planter area in
the fall. Engineering will then return to place Flexi-Pave (a rubber surfacing) around the tree, which includes the gate
entrance. In the meantime, we have loamed the area, similar to its preconstruction conditions.
12
Kennedy School Chiller
Replacement & BMS upgrades
IAM-Capital Projects is nearly complete with the replacement of the
failed chiller at the Kennedy School. The chiller system is fully
operational.
An added element to the project is upgrading the existing BMS
system which will enable the DPW to have an additional building
under a more modern system.
13
What is a BMS System?
BMS = Building Management System
14
A BMS system allows people, like facility managers and building
operations staff to monitor, in real time how a facility is preforming.
The system monitors space temperatures, energy consumption,
equipment alarms and can trend multiple data points.
It also allows DPW operations staff to adjust occupancy schedules
and activate energy saving curtailments under a program with the
Office of Sustainability and Environment (OSE) and Eversource.
New BMS Graphics
IAM/Capital projects staff are working closely with the DPW team on fully integrating new bac-net JCI BMS controls
which will eliminate the existing out of date Honeywell proprietary system
15
New BMS Graphics - Continued
IAM/Capital projects staff are working on fully integrating new bac-net JCI BMS controls which will eliminate an existing
out of date proprietary system (Honeywell)
16
Somerville High School
Reavis Plaque Installation
IAM-Capital Projects completed one final detail for the
Reavis Field. This beautiful plaque was installed in
June.
17
New SHS Reavis Field Plaque
One final aspect of honoring Mr. Philip Reavis was adding this well-deserved commemorative plaque to further
recognize his contributions to the City of Somerville.
18
Somerville High School Solar
System Start Up
The final steps to activating the SHS solar system were
completed in June. The system is now fully operational!
The system can generate annually up to 330.65 MWh
via 778 panels across multiple roof areas on SHS.
19
SHS Solar Panel System
20
Infrastructure & Asset Management
work to benefit Somerville Public
Schools, summer 2025
a.k.a. What IAM did during summer school vacation
Report for Somerville City Council and School Committee
Katjana Ballantyne, Mayor
Richard E. Raiche, Director of Infrastructure & Asset Management
Ralph Henry, Director of Capital Projects
August 25, 2025