Project Title:
Project Address:
Department:
Project Mgr.:
Email:
New Project or Modification:
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Project Description/Scope of Work:
Justification:
Relationship to Other Projects:
Category: Please check all appropriate boxes
Architectural/Engineering Feasibility Study
Architectural/Engineering Construction Document Services & Construction Admin
Building Alteration/Repair/Renovation/Addition/New Construction
Building Improvements (non-construction)
Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.)
Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.)
Street/Sidewalk/Monument Improvements
Water Improvements
Sewer Improvements
Land Development
Land Acquisition
Land Disposition
Parks and Open Space
Other
Operational Impact:
What impact will this project have on operational costs?
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
FORM A - DESIGN & CONSTRUCTION
CAPITAL IMPROVEMENT PROJECT (CIP) REQUEST - FY26
Karla Cuarezma
kcuarezma@somervillema.gov
Inspections and remedial work help mitigate long-term risk from pipe collapses and maintenance to failing systems.
FY26 Water Main Improvements
The water distribution system in Somerville was predominantly developed between the late 1800s and mid 1900s, with varied quality of
pipe used between different time periods within that span. Through a comprehensive water distribution system study performed in 2020,
the City has been performing recurring rehabilitations and replacements of the system in most-critical areas. Due to the impending
McGrath Boulevard project by MassDOT, the City has pushed McGrath Highway corridor rehabilitations to the top of our prioritization.
Design and construction of yearly rehabilitation to the water distribution systems, including but not limited to: water mains, hydrants, and
shut-off valves. Design services will prioritize deficiencies found in the water system based on consequence and likelihood of failure.
Design services will include engineering services during construction. Improvements include rehabilitation of existing pipes by clean and
lining, installation of additional shut-off valves, and installation of new pipe as necessary.
IAM - Engineering
This project is a preceding activity to the MassDOT McGrath Boulevard project. While these projects do not directly rely on one another,
the Engineering Division is focusing on a "build once" model for the McGrath corridor. Fixing water distribution system features will
support this approach.
Necessary
New Project
First
Design and Construction Project Funding
Total Estimated Cost
Prior Years
Funding
FY 26
FY 27
FY 28
FY 29
FY 30
Capital Costs:
Feasibility Study
$ -
Land Acquisition/Appraisal
$ -
$ - $ - $ - $ - $ - $ -
Environmental Remediation/LSP
$ -
Demolition & Site Clearance
$ -
$ - $ - $ - $ -
$ - $ -
Owner's Proj. Mgr./Clerk of the Works
$ -
Designer Services (SD)
$ 520,869
$ 200,000 $ 200,000 $ 120,869
Designer Services (CA)
$ 856,061
$ 428,030 $ 428,030
Construction
$ 5,707,070
$ -
$ 2,853,535 $ 2,853,535
$ - $ -
Insurance (builder's risk, addtl. Polices)
$ -
$ - $ - $ - $ -
$ - $ -
Furniture & Equipment (FFE)
$ -
Police Details
$ 400,000
$ -
$ 200,000 $ 200,000
$ - $ -
Contingency - Construction
$ 400,000
$ 200,000 $ 200,000
Contingency - Soft Costs
$ 400,000
$ - $ - $ 200,000 $ 200,000
$ - $ -
Other (Specify)
$ -
$ - $ - $ - $ - $ - $ -
Total:
$ 8,284,000 $ - $ 200,000 $ 4,081,565 $ 4,002,434 $ - $ -
Please provide suggested sources. This section will be finalized jointly by Finance and the Department.
Funding Sources:
Prior Years
Funding
FY 26
FY 27
FY 28
FY 29
FY 30
Stabilization Fund
$ - $ - $ - $ - $ - $ - $ -
GO Bonds
$ 8,284,000 - 200,000 4,081,565 4,002,434 - -
Retained Earnings
$ -
General Fund
$ -
Special Assmnt.
$ - - - - - - -
Ch. 90
$ -
Grants
$ - - - - - - -
Receipts Reserved
$ -
Other (Specify)
$ - - - - - - -
Other (Specify)
$ - - - - - - -
Total:
$ 8,284,000 $ - $ 200,000 $ 4,081,565 $ 4,002,434 $ - $ -
Evaluation Committee Use Only:
Reviewed and Approved By:
Version
Requesting Department
Date
Draft
Auditing
Date
Revised
Purchasing
Date
Accepted
Final Approval
Recurring annual program on Water CIP