McGrath Sewer_Capital Program Request Sheet_FY26 CIP — File 26-0516
Project Title:
Project Address:
Department:
Project Mgr.:
Email:
New Project or Modification:
Department Priority:
Rank your project(s) in order of priority from your point of view. If you propose four projects, rank them 1, 2, 3, 4, with 1 being the highest, and so forth.
Project Description/Scope of Work:
Justification:
Relationship to Other Projects:
Category: Please check all appropriate boxes
Architectural/Engineering Feasibility Study
Architectural/Engineering Construction Document Services & Construction Admin
Building Alteration/Repair/Renovation/Addition/New Construction
Building Improvements (non-construction)
Purchase of Equipment (incl. vehicles, office equipment, hardware, etc.)
Information Technology Systems/Platforms (e.g. cloud based, internet based, etc.)
Street/Sidewalk/Monument Improvements
Water Improvements
Sewer Improvements
Land Development
Land Acquisition
Land Disposition
Parks and Open Space
Other
Operational Impact:
What impact will this project have on operational costs?
Reduce Cost (greater than 5%)
Reduce Cost (less than 5%)
Cost Unchanged
Increase Cost (less than 5%)
Increase Cost (greater than 5%)
TBD
FORM A - DESIGN & CONSTRUCTION
CAPITAL IMPROVEMENT PROJECT (CIP) REQUEST - FY26
Jonathan Smith
jsmith@somervillema.gov
Inspections and remedial work help mitigate long-term risk from pipe collapses and maintenance to failing systems.
FY26 Sewer System Rehabilitation
Through Engineering Division's ongoing efforts to catalogue conditional assessments on the entire sewer system, CCTV inspections have
been performed on the majority of the existing pipes. These inspections are further refined into a prioritization list based on both physical
condition and the relative importance of each pipe. This package of work will focus on fixing critical system issues.
This project will focus on rehabilitations of sewer infrastructure that has been observed to be in critical condition and high importance to
the function of the overall sewer system. Rehabilitations will be comprised of sewer system improvements, spot repair excavations and
replacements, CIPP lining of pipes, and full manhole-to-manhole replacements of existing pipes.
IAM - Engineering
This project is a preceding activity to the MassDOT McGrath Boulevard project. While these projects do not directly rely on one another,
the Engineering Division is focusing on a "build once" model for the McGrath corridor. Fixing water distribution system features will
support this approach.
Necessary
New Project
First
Design and Construction Project Funding
Total Estimated Cost
Prior Years
Funding
FY 25
FY 26
FY 27
FY 28
FY 29
Capital Costs:
Feasibility Study
$ -
Land Acquisition/Appraisal
$ -
$ - $ - $ - $ - $ - $ -
Environmental Remediation/LSP
$ -
Demolition & Site Clearance
$ -
$ - $ - $ - $ -
$ - $ -
Owner's Proj. Mgr./Clerk of the Works
$ -
Designer Services (SD)
$ 200,000
$ - $ 200,000
Designer Services (CA)
$ 200,000
$ 200,000
Construction
$ 1,250,000
$ -
$ 1,250,000
$ - $ -
Insurance (builder's risk, addtl. Polices)
$ -
$ - $ - $ - $ -
$ - $ -
Furniture & Equipment (FFE)
$ -
Police Details
$ 100,000
$ -
$ 100,000
$ - $ -
Contingency - Construction
$ 120,000
$ 120,000
Contingency - Soft Costs
$ 130,000
$ - $ -
$ 130,000
$ - $ -
Other (Specify)
$ -
$ - $ - $ - $ - $ - $ -
Total:
$ 2,000,000 $ - $ - $ 200,000 $ 1,800,000 $ - $ -
Please provide suggested sources. This section will be finalized jointly by Finance and the Department.
Funding Sources:
Prior Years
Funding
FY 25
FY 26
FY 27
FY 28
FY 29
Stabilization Fund
$ - $ - $ - $ - $ - $ - $ -
GO Bonds
$ 2,000,000 - - 200,000 1,800,000 - -
Retained Earnings
$ -
General Fund
$ -
Special Assmnt.
$ - - - - - - -
Ch. 90
$ -
Grants
$ - - - - - - -
Receipts Reserved
$ -
Other (Specify)
$ - - - - - - -
Other (Specify)
$ - - - - - - -
Total:
$ 2,000,000 $ - $ - $ 200,000 $ 1,800,000 $ - $ -
Evaluation Committee Use Only:
Reviewed and Approved By:
Version
Requesting Department
Date
Draft
Auditing
Date
Revised
Purchasing
Date
Accepted
Final Approval
Recurring annual program on Water CIP