Introduction
A key component of the City of Somerville’s (City’s) selected combined sewer overflow (CSO) control plan
is a determination of financial burden of such controls on the community. As part of the City’s Updated CSO
Control Plan, the United States Environmental Protection Agency (EPA) requires a financial capability
assessment (FCA). FCAs evaluate the capability of a community and its households to undertake additional
water quality-related capital improvements. FCAs provide information useful in negotiating schedules to
meet CSO control requirements.
The FCA process completed for the City’s Amended LTCP is as follows:
•
Determine the Baseline affordability results for the City’s wastewater and stormwater systems
•
Evaluate effect of the selected CSO control plan on financial burden
•
Review affordability metrics when evaluating alternative plans and summarize overall financial
capability for CSO control
•
Determine impacts on ratepayers’ bills and affordability
The purpose of this section is to provide a summary FCA for the City’s residential customers as evaluated
under the EPA 2024 Clean Water Act Financial Capability Assessment Guidance (herein referred to as
EPA Guidance)1. Affordability of the City’s Baseline wastewater CIP and Selected CSO Control Plan was
evaluated using EPA Guidance
The EPA Guidance outlines two approaches that can be used to complete an FCA. To provide a
comprehensive assessment, both approaches have been evaluated for the City. The EPA FCA approach
utilized in the City’s Amended LTCP considers the following factors for each approach:
1 EPA. March 2024 Revision. Office of Water. Clean Water Act Financial Capability Assessment Guidance, EPA 800-B-24-001.
June 30, 2025
Gina Cortese, City of Somerville
Page 2 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Alternative 1 Approach:
•
Residential Indicator (RI) calculated as Cost per Household (CPH) as a percentage of Median
Household Income (MHI)
•
Financial Capability Indicators including Bond Rating and Net Debt
•
Socioeconomic Indicators including Unemployment and Household Income
•
Financial Management Indicators including Property Tax Revenues and Tax Collection Efficiency
•
Lowest Quintile Poverty Indicator (LQPI)
Alternative 2 Approach:
•
Financial and Rate Models
•
Annual RI calculations including water rate impacts
2
Background
The City’s baseline financial condition is based on its current 11-year (2025 through 2036) wastewater and
stormwater system capital improvement programs (CIPs), estimated long-term capital needs beyond 2036
as well as ongoing wastewater and stormwater operations and maintenance (O&M) costs. This scenario is
referred to as the Baseline. The CSO Control Plan scenarios evaluated in this analysis include additional
CIP costs associated with CSO mitigation and costs associated with Somerville’s 1/43rd share of
Massachusetts Water Resources Authority (MWRA) increases. The specific CSO control plan scenarios
include the following:
•
Limited 2050 TY: Limited CSOs in the 2050 Typical Year
•
2050 TY: Zero CSOs in 2025 Typical Year
•
2050 5-YR: Zero CSOs in the 2050 5-Year Storm
•
2050 25-YR: Zero CSOs in the 2050 25-Year Storm, and
•
Full Sewer Separation: Overflows resulting from Full Sewer Separation
Table 2-1 CSO Control Plan Scenarios
Name
Description
Duration
Cost Current FY
2025 Dollars
Baseline
Existing Capital Plan2
2025 – 2050
$628,371,504
Limited 2050 TY
Limited CSOs
2028 - 2045
+ $171,200,000
2050 TY
2025 Typical Year
2028 - 2042
+ $257,300,000
2050 5-YR
2050 5-Year Storm
2028 -2042
+ $380,000,000
2050 25-YR
2050 25-Year Storm
2028 - 2042
+ $530,000,000
Full Sewer Separation
Full Sewer Separation
2028 - 2057
+ $2,640,000,000
2 All control plans scenarios are evaluated as additions to the baseline existing capital plan
June 30, 2025
Gina Cortese, City of Somerville
Page 3 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
The City maintains a practice of evaluating the financial needs of the sewer system on an annual basis.
This financial planning process allows the City to evaluate the needs of the system in the near-term and
long-term and adjustments to sewer rates are proposed to meet the funding needs of the system. Over the
past five years the City has increased sewer rates each year, except for FY 2025, when rates were held
constant. Over this period the average increase in a typical Single Family Residential (SFR) customers bill
has been approximately 7%. It should be noted that in FY 2026, the City adopted a new rate structure
which minimized the impact of bill adjustments for SFR customers and simplified the rate structure. To
address the City’s CIP and the CSO Control Plan Scenarios presented in 2050 25-YR: Zero CSOs in the
2050 25-Year Storm, and
•
Full Sewer Separation: Overflows resulting from Full Sewer Separation
Table 2-1, the future sewer rate increases are expected to exceed the increases that have been adopted
over recent years.
Table 2-2 Historical Sewer Rate Increases for Single Family Residential (SRF)
Item
FY 2022
FY 2023
FY 2024
FY 2025
FY 2026
(Current)
Base (5/8” Meter)
$40.00
$40.00
$40.00
$40.00
$40.00
Tier 1
$8.82
$9.92
$11.26
$11.26
$12.51
Tier 2
$9.80
$11.03
$12.52
$12.52
$15.63
Tier 3
$12.51
$14.07
$15.97
$15.97
$18.76
Tier 4
$13.12
$14.76
$16.75
$16.75
N/A
Tier 5
$13.58
$15.28
$17.34
$17.34
N/A
Typical SFR Bill3
$666.33
$734.58
$817.59
$817.59
$851.70
Percent Change
from Prior Year
10.6%
10.2%
11.3%
0.0%
4.17%
3
Somerville Socio-Economic Setting
When considering financial capability and affordability, it is beneficial to understand the historical trends and
current socio-economic setting of a community. Understanding the socio-economic setting for the City
provides clarity on the fiscal burden facing citizens, now and into the future. The following sections include
data concerning the City’s economic conditions. Dollar values representing demographic information in this
section are expressed in nominal dollars for the year in which they were reported.
3 Total annual bill for the “typical” Single Family Residential (SRF) consuming 18 CCF, tri-annually.
June 30, 2025
Gina Cortese, City of Somerville
Page 4 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
3.1
Population
The City’s population during the 2020 census4 was 81,045. Although the census occurs every 10 years, the
US Census Bureau updates their estimates every year to get a more accurate depiction of the population.
Based on the five-year average census, the City’s population has been steady from 2018 to 20235. Figure
3-1 shows the population trend in the City over the past 6 years.
Figure 3-1 City of Somerville Population Trend
3.2
Cost of Housing
Housing costs, particularly for renters, present a significant and growing financial challenge for many
households within the City of Somerville. Of the approximately 37,600 occupied rental units in the City,
more than one-quarter of renters spend over 35% of their household income on rent6. This exceeds the
accepted affordability benchmark, which recommends that rent should not surpass 30% of household
income7.
This means that over 10,000 renter households in Somerville are experiencing a level of housing cost
burden that can be classified as moderate to severe. With the City’s median household income estimated at
4 U.S. Census Bureau, Profile of General Demographic Characteristics: 2020, Table DP-1, Somerville City, PA
5 U.S. Census Bureau, City and Town Population Totals Datasets: 2020-2023. Somerville City, PA
6 U.S. Census Bureau, Selected Housing Characteristics; Table: DP04: 2023 5-Year Estimates. Somerville City, MA
7 U.S. Census Bureau. Nearly half of renter households are cost-burdened, proportions differ by race [Press release]. U.S. Department
of Commerce. https://www.census.gov/newsroom/press-releases/2024/renter-households-cost-burdened-race.html
June 30, 2025
Gina Cortese, City of Somerville
Page 5 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
about $127,000 in 2023, many of these renters are likely paying in excess of $3,700 in rent per month. This
is more than double the national average rent of approximately $1,4508.
Affordability pressures are not evenly distributed across the City. In four census tracts, more than 40% of
renter households spend over 35% of their income on rent. There are 25 total census tracts in the City.
Figure 3-2 presents a comparison of the percentage of households within each census tract in the City
whose rent comprises 35% or more of their annual incomes.
Figure 3-2 Percentage of Households with Rent More Than 35% of Incomes, by Census Tract
Table 3-1 presents the number of renter-occupied households within the City by census tract.
Table 3-1 Renter-occupied Households by Census Tract
Census Tract
Total Renter-Occupied Units
No. Paying >35% of Income on Rent
3501.05
543
89
3501.06
1,232
500
3501.07
480
209
3501.08
1,813
573
3501.09
963
96
3502.01
1,327
279
3502.02
1,764
332
3503
1,517
620
3504
2,520
801
3505
833
155
8 U.S Census Bureau, (2025, September 11). The cost of homeownership continues to rise. Census.gov.
https://www.census.gov/newsroom/press-releases/2025/acs-1-year-estimates.html
June 30, 2025
Gina Cortese, City of Somerville
Page 6 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Census Tract
Total Renter-Occupied Units
No. Paying >35% of Income on Rent
3506
1,092
259
3507.01
1,619
466
3507.02
1,648
666
3508
955
185
3509
1,789
315
3510.01
2,011
690
3510.02
1,304
309
3511.01
1,607
275
3511.02
1,104
296
3512.03
2,306
650
3512.04
2,099
812
3513
2,193
452
3514.03
1,793
699
3514.04
1,607
525
3515
1,464
468
Total
37,583
10,721
3.3
Cost of Utilities
The annual increase in the cost of sewer service has exceeded the growth in household incomes over the
past five years. In 2023, the cost of sewer service for single-family households increased by over 21% since
2021;9 while the MHI has only increased about 16 percent10.
9 Assuming a usage of 18 CCF tri-annually for the typical single family residential customer.
10 U.S. Census Bureau, Selected Housing Characteristics; Table: S1901: 2023 5-Year Estimates. Somerville, MA
June 30, 2025
Gina Cortese, City of Somerville
Page 7 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Figure 3-3 Cumulative Percent Increase in Single Family Residential Annual Sewer Bills and Median
Household Income, Relative to 2021
The disparity between the increase in sewer bills and MHI is expected to increase over time (see Figure 3-
3). By 2026, sewer bills were about 36% higher in comparison to 2021; whereas, the MHI is projected to be
27% higher. As a result, utility bills are becoming a larger share of household budgets, making sewer bills a
greater burden for the average single-family household in the City of Somerville. The rate increases
associated with the CSO Control Plan scenarios will likely exacerbate the gap between sewer bill increases
and the growth in household incomes.
4
FCA - Alternative 1 Approach
The Alternative 1 approach uses residential metrics like the residential indicator (RI) and cost per
household (CPH) and permittee financial capability indicators. This approach has limitations as it does not
accurately reflect the impact on the ratepayers that are most economically vulnerable in a particular
community due to its reliance on national averages. It also provides a snapshot in time without
consideration of how financial health can vary over time for both ratepayers and the permittee.
4.1
Residential Indicator (RI)
The findings presented reflect Phase 1 of the full analysis which determines the RI, or a measure of the
financial impact of current and proposed wastewater management and CSO controls on residential users.
EPA’s RI scoring criteria are presented in Table 4-1. If the CPH is less than 1% of the median household
income (MHI), the RI is assigned a low Financial Impact score. If the CPH is between 1 and 2% of MHI, the
RI is assigned a mid-range Financial Impact score. If CPH is more than 2% of MHI, the RI is assigned a
June 30, 2025
Gina Cortese, City of Somerville
Page 8 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
high Financial Impact score. If a community’s RI is calculated as greater than 1%, Phase 2 analysis of six
financial capability indicators is required.
Table 4-1 EPA's Residential Indicator Scoring Criteria
Financial Impact
Cost Per Household
Low
Less than 1.0% of MHI
Mid-Range
1.0 - 2.0% of MHI
High
Greater than 2.0% of MHI
MHI = Median Household Income
As part of the analysis, the CPH was evaluated for the wastewater system. The residential share of costs is
calculated by dividing the residential flow by the total flow. CPH is determined by dividing the residential
share of costs by the number of households, following EPA guidance. Flows are allocated between
residential and non-residential classes based on billed flows. Table 4-2 below presents the preliminary CPH
for the wastewater system for the Baseline and the CSO Control Plan scenarios.
June 30, 2025
Gina Cortese, City of Somerville
Page 9 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Table 4-2 Cost per Household Determination, in Millions of 2025 USD
Item
Baseline
Limited
2050 TY
2050 TY
2050 5-YR 2050 25-YR Full Sewer
Separation
Annual O&M (Excluding
Depreciation)
$22.6 M
$22.6 M
$22.6 M
$22.6 M
$22.6 M
$22.6 M
Annual Capital and
Annual Debt Service11
$8.0 M
$8.0 M
$8.0 M
$8.0 M
$8.0 M
$8.0 M
Total Current Costs
$30.6 M
$30.6 M
$30.6 M
$30.6 M
$30.6 M
$30.6 M
Estimated Future Annual
Debt Service12
$38.6 M
$49.1 M
$54.4 M
$61.9 M
$71.1 M
$200.7 M
Total Projected Costs
$38.6 M
$49.1 M
$54.4 M
$61.9 M
$71.1 M
$200.7 M
Total Costs
$69.2 M
$79.7 M
$80.0 M
$92.6 M
$101.8 M
$231.3 M
Residential Share of Total
Costs13 (%)
82.2%
82.2%
82.2%
82.2%
82.2%
82.2%
Total Number of
Households (No.)
35,427
35,427
35,427
35,427
35,427
35,427
Annual Cost per
Household ($)
$1,607
$1,851
$1,974
$2,149
$2,362
$5,370
The RI computation divides CPH, as determined in Table 4-2 above, by MHI.
Table 4-3 provides the City’s MHI for 2025 adjusted based on five-year average change in Consumer Price
Index (CPI) adjustment factor of 4.3%14.
11 Existing debt service and pay-go capital in FY 2025
12 Based on sewer projects identified for debt financing in the capital improvement plans
13 Based on residential flow per EPA guidance
14 Source: US Bureau of Labor Statistics: Consumer Price Index, All Urban Consumers - (CPI-U), U.S. city average, All items -
CUUR0000SA0
June 30, 2025
Gina Cortese, City of Somerville
Page 10 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Table 4-3 Residential Indicator Determination
Item
Baseline
Limited 2050
TY
2050 TY
2050 5-YR 2050 25-YR Full Sewer
Separation
Median Household
Income (2025)
$138,253
$138,253
$138,253
$138,253
$138,253
$138,253
Annual Cost per
Household
$1,607
$1,851
$1,974
$2,149
$2,362
$5,370
Residential Indicator
1.16%
1.34%
1.43%
1.55%
1.71%
3.88%
The RI for the 2025 Baseline, Limited 2050 TY, 2050 TY, 2050 5-YR, and 2050 25-YR capital plans yield a
medium impact score because the RIs are between 1% and 2%. Only the Full Sewer Separation capital
plan yields a high impact score since the RI is higher than 2%.
4.2
Permittee Financial Capability Indicators
In addition to the RI, the Alternative 1 Approach also considers the financial health of the community. There
are six Permittee Financial Capability Indicators (FCIs):
•
Debt Indicators
o
Bond Ratings
o
Overall Net Debt as a Percent of Full Market Property Value
•
Socioeconomic Indicators
o
Unemployment Rate
o
MHI
•
Financial Management Indicators
o
Property Tax Revenues as a Percent of Full Market Property Value
o
Property Tax Revenue Collection Rate
A summary of the FCIs is presented in Table 4-4. The Baseline capital plan and the CSO Control Plan
scenarios have identical FCI results. EPA Guidance provides that each ‘Weak’ financial capability indicator
shall be assigned a numeric value of ‘1’, ‘Mid-Range’ indicators are assigned ‘2’, and ‘Strong’ indicators are
assigned ‘3’. Somerville scored a ‘2’ on two indicators and a ‘3’ on four of the indicators. The arithmetic
average of the six indicators for the City of Somerville is 2.67.
June 30, 2025
Gina Cortese, City of Somerville
Page 11 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Table 4-4 Summary of Financial Capability Indicators
Item
Sewer Value
(Score)
Bond rating
AAA (3)
Net debt percent of property value
3.2% (2)
Unemployment rate compared with national average
-1.0% (2)
MHI compared with National Average
61.8 (3)
Property tax revenue percent of property value
1.0% (3)
Property tax revenue collection rate
99.0% (3)
City of Somerville Financial Capability Indicator Score
2.67
Table 4-5 Financial Capability Scores
Indicator
Strong
Mid-Range
Weak
Bond Rating
AAA-A (S&P)
or Aia-A (MIS)
BBB (S&P) or Baa
(MIS)
BB-D (S&P) or Ba-C
(MIS)
Net Debt/Property Value
Below 2%
2% - 5%
Above 5%
Unemployment Rate
>1% below
±1% of
>1% above
National Avg.
National Avg.
National Avg.
Median Household Income
>25% above
±25% of
>25% below
adj. Natal MHI
adj. Natal MHI
adj. Natal MHI
Prop. Tax/Property Value
Below 2%
2% - 4%
Above 4%
Property Tax Collection
Rate
Above 98%
94% - 98%
Below 94%
"S&P" means Standard & Poor’s Corp. "MIS" means Moody's Investors Service
Key:
= City of Somerville score
4.3
Financial Capability Assessment Alternative 1 Results
Combining the Phase I Residential Indicator and the Phase 2 Financial Capability Indicators for the City’s
CIP scenarios indicates the financial impact of the City’s plans overall. The tables below provide the
Financial Capability Matrix and results pursuant to the EPA Guidance. The Phase 1 Residential Indicator is
determined to be in the “Mid-Range” category for the Baseline, Limited 2050 TY, 2050 TY, 2050 5-YR, and
2050 25-YR capital plans since the scores are between 1% and 2%. The Phase 1 RI is determined to be
‘High” category for the Full Sewer Separation capital plan. The average score of the Phase 2 Permittee
June 30, 2025
Gina Cortese, City of Somerville
Page 12 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Financial Capability Indicators (2.67) is above 2.5 for all scenarios. Table 4-6 shows the Phase 2 Permittee
Financial Capability Indicators to be in the “Strong” category and are shaded accordingly. The intersection
of the Phase 1 and Phase 2 determinations shows that the overall assessment results place the Baseline,
Limited 2050 TY, 2050 TY, 2050 5-YR, and 2050 25-YR capital plans in the “Low Impact” category and the
Full Sewer Separation capital plan in the “Medium Impact” category, shown in Table 4-7.
Table 4-6 Financial Capability Assessment Results – Baseline, Limited 2050 TY, 2050 TY, 2050 5-YR,
and 2050 25-YR Capital Plans
Permittee Financial
Capability
Indicators Score
(Socioeconomic,
Debt, & Financial
Indicators)
Residential Indicator (Cost per Household as % of MHI)
Low (Below 1.0%)
Mid-Range
(Between 1.0 and
2.0%)
High (Greater than
2.0%)
Weak (Below 1.5)
Medium Impact
High Impact
High Impact
Mid-Range
(Between 1.5 and
2.5)
Low Impact
Medium Impact
High Impact
Strong (Above 2.5)
Low Impact
Low Impact
Medium Impact
Table 4-7 Financial Capability Assessment Results – Full Sewer Separation Capital Plan
Permittee Financial
Capability
Indicators Score
(Socioeconomic,
Debt, & Financial
Indicators)
Residential Indicator (Cost per Household as % of MHI)
Low (Below 1.0%)
Mid-Range
(Between 1.0 and
2.0%)
High (Greater than
2.0%)
Weak (Below 1.5)
Medium Impact
High Impact
High Impact
Mid-Range
(Between 1.5 and
2.5)
Low Impact
Medium Impact
High Impact
Strong (Above 2.5)
Low Impact
Low Impact
Medium Impact
June 30, 2025
Gina Cortese, City of Somerville
Page 13 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
4.4
Lowest Quintile Poverty Indicators Analysis
The Lowest Quintile Poverty Indicator (LQPI) combines the lowest quintile income element with five
additional poverty indicators (PIs) to establish a numeric score for poverty prevalence within the
community’s service area, as compared to a national average. Equal weight is provided to the income
element and the sum of the five PIs. Each of the factors in this analysis is evaluated based on the values of
the community served relative to national statistics. Each of the LQPI criteria, except for trends in
household growth, are evaluated using a plus or minus 25% benchmark to national values, like the
methodology used to calculate the FCI. Indicator values within 25% of national average are characterized
as mid-range and scored two, while indicators outside of 25% of the national average are characterized as
weak or strong and scored one or three respectively. The LQPI is then calculated as the weighted average
score of the six indicators. LQPI above 2.5 is characterized as low impact, LQPI between 2.5 and 1.5 is a
mid-range impact, and a LQPI below 1.5 is high impact.
The LQPI calculation for the City of Somerville’s residents is shown in Table 4-8 and indicates that EPA
considers the City to have a low poverty prevalence.
Table 4-8 Lowest Quintile Poverty Indicator Calculation
Row
Item
Sewer
LQPI1
Upper Limit of Lowest Income Quintile
1.1
Upper Limit of Lowest Income Quintile for Service Area
$50,558
1.2
Upper Limit of Lowest Income Quintile for Nation
$32,232
1.3
Percent Difference
56.9%
1.4
LQPI1 Score
3
1.5
LQPI1 Weight
50%
LQPI2
Percentage of Population with Income Below 200% of the Federal Poverty Guidelines
2.1
Service area population for whom poverty status is determined
77,965
2.2
Service area population with income below 200% of poverty level
14,921
2.3
Percentage of population with income below 200% of poverty level
19.1%
2.4
National population for whom poverty status is determined
324,567,147
2.5
National population with income below 200% of poverty level
92,357,008
2.6
National Percentage of population with income below 200% of poverty level
28.5%
2.7
Difference in percentage
-32.7%
2.8
LQPI2 Score
3
2.9
LQPI2 Weight
10%
LQPI3
Percentage of Population Receiving Food Stamps / SNAP Benefits
3.1
Percentage of Service Area households receiving Food Stamps / SNAP
8.5%
3.2
Percentage of National households receiving Food Stamps / SNAP
11.8%
3.3
Difference in percentage
-28.0%
3.4
LQPI3 Score
3
June 30, 2025
Gina Cortese, City of Somerville
Page 14 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Row
Item
Sewer
3.5
LQPI3 Weight
10%
LQPI4
Percentage of Vacant Households
4.1
Total Households in Service Area
37,583
4.2
Vacant Households in Service area
2,156
4.3
Percentage of Vacant Households in Service Area
5.7%
4.4
Total Households Nationally
142,332,876
4.5
Vacant Households Nationally
14,850,011
4.6
Percentage of Vacant Households Nationally
10.4%
4.7
Difference in percentage
-45.0%
4.8
LQPI4 Score
3
4.9
LQPI4 Weight
10%
LQPI5
Trend in Household Growth
5.1
Total Households in 2023 Census
35,427
5.2
Total households in 2018 Census
32,851
5.3
Trend
1.52%
5.4
LQPI5 Score
3
5.5
LQPI5 Weight
10%
LQPI6
Percentage of Unemployed Population 16 and Over in Civilian Labor Force
6.1
Percentage of Unemployed Population in Service Area
2.3%
6.2
Percentage of Unemployed Population Nationally
3.3%
6.3
Difference in percentage
-30.3%
6.4
LQPI6 Score
3
6.5
LQPI6 Weight
10%
LQPI
Lowest Quintile Poverty Indicator (LQPI)
3.00
Lowest Quintile Poverty Characterization
Low Impact
Upon completion of the Initial LQPI analysis, the LQPI score and the FCA score were combined in the
Expanded FCA Matrix to provide the final FCA result. The expanded FCA scores are shown in the
following tables and demonstrate a Low Impact for the Baseline, Limited 2050 TY, 2050 TY, 2050 5-YR,
and 2050 25-YR capital plans and a Low Impact for the Full Sewer Separation capital plan.
June 30, 2025
Gina Cortese, City of Somerville
Page 15 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Table 4-9 Expanded Financial Capability Assessment Matrix for the Baseline, Limited 2050 TY, 2050
TY, 2050 5-YR, and 2050 25-YR Capital Plans
Financial
Capability
Assessment Score
Lowest Quintile Poverty Indicator Score
Low Impact
(Above 2.5)
Mid-Range
(Between 1.5 and 2.5)
High Impact
(Below 1.5)
Low Impact
Low Impact
Low Impact
Medium Impact
Mid-Range
Low Impact
Medium Impact
High Impact
High Impact
Medium Impact
High Impact
High Impact
Table 4-10 Expanded Financial Capability Assessment Matrix for the Full Sewer Separation Capital
Plan
Financial
Capability
Assessment Score
Lowest Quintile Poverty Indicator Score
Low Impact
(Above 2.5)
Mid-Range
(Between 1.5 and 2.5)
High Impact
(Below 1.5)
Low Impact
Low Impact
Low Impact
Medium Impact
Mid-Range
Low Impact
Medium Impact
High Impact
High Impact
Medium Impact
High Impact
High Impact
5
FCA – Alternative 2 Approach
The Alternative 2 approach offers a more comprehensive analysis than the Alternative 1 approach. Under
the Alternative 2 approach, permittees can incorporate financial and rate models and approaches to
evaluate affordability burdens on different income levels.
5.1
Financial and Rate Models
Forecasts of affordability over time can be made through long-term financial planning. Rate increases used
to analyze affordability over time were projected in a long-term financial plan consistent with the City’s
practice of evaluating the sewer system needs on an annual basis. The sources and uses of funds are
evaluated and deficits in sources of funds relative to uses yield annual rate revenue increases necessary to
manage the utility and complete implementation of the City’s CIPs.
Rate revenue projections consider targets and requirements such as debt service coverage ratios, and
minimum fund balances. These are items omitted from EPA’s recommended CPH calculation.
June 30, 2025
Gina Cortese, City of Somerville
Page 16 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Table 5-1 depicts the forecasted annual rate increase for the sewer fund for the Baseline and all the
Selected CSO Control plans for the next 30 years.15
Table 5-1 Annual Sewer Rate Increase Comparison Between Asset Renewal & Improvement
Baseline and Selected CSO Control Plans
The CSO Control Plans rate plans are higher than the Baseline in the beginning years of the forecast due to
the additional capital needs shown in Table 2-1.
15 The 2026 fiscal year for the City of Somerville is July 1, 2025, to June 30, 2026.
June 30, 2025
Gina Cortese, City of Somerville
Page 17 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Figure 5-1 depicts a 30-year projection of annual single family residential sewer bills with an annual
consumption of 54 CCF by capital plan scenario.
Figure 5-1 30-Year Projection of Annual Single Family Residential Sewer Bills by Capital Plan
Scenario
The current and projected bills over the 30-year period are summarized for each alternative in Table 5-2.
Table 5-2 Sewer Fund 30-Year Forecast of Single-Family Residential Bills
Alternatives
Current FY
2026 Annual
Bill
Projected FY
2055 Annual Bill
Percent
Change
Baseline
$852
$2,094
+146%
Limited 2050 TY
$852
$2,367
+178%
$800
$1,800
$2,800
$3,800
$4,800
$5,800
$6,800
$7,800
FY 2026
FY 2027
FY 2028
FY 2029
FY 2030
FY 2031
FY 2032
FY 2033
FY 2034
FY 2035
FY 2036
FY 2037
FY 2038
FY 2039
FY 2040
FY 2041
FY 2042
FY 2043
FY 2044
FY 2045
FY 2046
FY 2047
FY 2048
FY 2049
FY 2050
FY 2051
FY 2052
FY 2053
FY 2054
FY 2055
Baseline
Limited 2050 TY
2050 TY
Full Sewer Separation
2050 5-YR
2050 25-YR
June 30, 2025
Gina Cortese, City of Somerville
Page 18 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Alternatives
Current FY
2026 Annual
Bill
Projected FY
2055 Annual Bill
Percent
Change
2050 TY
$852
$2,600
+205%
2050 5-YR
$852
$2,976
+249%
2050 25-YR
$852
$3,109
+265%
Full Sewer Separation
$852
$7,409
+770%
As demonstrated in the figure and table, sewer bills are expected to increase to account for revenue
requirements of the annual expenditures associated with each of the capital plans. Annual expenditures for
the sewer fund are assumed to be the existing sewer debt service, the new debt service associated with
planned capital improvement projects, forecasted Operations and Maintenance (O&M) expenditures, cash
funded capital & capital outlay (CO), the debt service associated with the CSO Control Plan scenarios, and
the increase in MWRA costs associated with the CSO Control Plan scenarios. With the issuance of new
debt each year to fund the costs of capital projects over the 30-year forecast period, the City would require
cumulative annual rate increases to recover the revenue requirements to satisfy the debt service payments
and debt service coverage ratios. Figure 5-2 presents the total projected sewer fund expenses by type and
the projected SFR annual sewer bills for two scenarios: Baseline (Blue) and Limited 2050 TY (Orange). At
the start of the forecast, the average annual single family wastewater bill is $85216 in FY 2026. By 2055, the
annual bill is about $2,100 for the Baseline capital plan.
16 Usage is assumed to be 18 CCF tri-annually for the average single family.
June 30, 2025
Gina Cortese, City of Somerville
Page 19 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Figure 5-2 Sewer Fund Projected Expenses by Type for the Baseline & Limited 2050 TY Scenarios
Figure 5-3 presents the total projected sewer fund expenses by type and the projected SFR annual sewer
bills for two scenarios: Baseline (Blue) and Full Sewer Separation (Green).
June 30, 2025
Gina Cortese, City of Somerville
Page 20 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Figure 5-3 Sewer Fund Projected Expenses by Type for the Baseline & Full Sewer Separation
Scenarios
5.2
Projection of Residential Indicator (RI) and Lowest
Quintile Residential Indicator (LQRI)
The City’s 2025 MHI is $138,253. The RI using the 2025 average wastewater bill is calculated to be 0.6%.17
Table 5-3 presents a 30-Year forecast of the RI for both the Baseline and all the CSO Control Plan
17 NOTE: The Residential Indicator (RI) in Alternative 1 Approach Phase 1 uses the Cost Per Household (CPH); whereas, the RI in
Alternative 2 Approach uses average total residential bills.
June 30, 2025
Gina Cortese, City of Somerville
Page 21 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
scenarios. For the projection of MHI, an annual increase of the 30-year average change in CPI (2.5%) is
assumed.18
Table 5-3 Projected Residential Indicator
Over the course of the projection, the Baseline RI is low impact. It peaks in FY 2033 at 0.91% and then
decreases for the remainder of the forecast. This gradual decrease in RI is due to the Median Household
18 Source: US Bureau of Labor Statistics: Consumer Price Index, All Urban Consumers - (CPI-U), U.S. city
average, All items - CUUR0000SA0
June 30, 2025
Gina Cortese, City of Somerville
Page 22 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Income increasing at a faster rate than the projected Baseline sewer bills. Debt service payments are
expected to retire in the outer years and the rate increase required to maintain the revenue requirements of
the wastewater system does not need to be as aggressive as the early in the projection for the Baseline.
For the Limited 2050 TY capital plan, in FY 2032, the capital plan RI reaches the medium impact, peaks in
FY 2034 at 1.03%, and then remains a medium impact until FY 2038 where it drops back down to low
impact for the rest of the forecast.
The 2050 TY capital plan RI follows a similar projection as the Limited 2050 TY, but the RI remains medium
impact for a longer duration from FY 2031 to FY 2047 and it peaks in FY 2034 at 1.13%. This is because
the 2050 TY capital plan has more aggressive rate increases earlier in the projection that allows for lower
rate increases later in the projection. Meaning that the RI higher and reaches medium impact faster than
the 2050 TY capital plan but decreases at a faster rate later in the projection.
The 2050 5-YR alternative RI remains medium impact for the duration of the forecast and it peaks in FY
2040 at 1.29%.
Similarly to the 2050 5-YR, the 2050 25-YR alternative also RI remains medium impact for the duration of
the forecast. However, every year the RI is higher for the 2050 25-YR, and it peaks in FY 2040 at 1.35%.
The Full Sewer Separation capital plan has the highest RI out of all the scenarios. It is medium impact for
FY2030 – 2035 and then is high impact from FY 2036 through the rest of the projection. The RI is always
increasing for the Full Sewer Separation scenario because the sewer bills are increasing at a faster rate
than the MHI. The Full Sewer Separation capital plan adds almost an additional $2.6 billion (in 2025 dollars)
in capital projects over 28 years.
To evaluate the impacts on lower income households, a forecast of the RI was calculated using the Lowest
Quintile Household Income (LQHI), or the 20th percentile household income, instead of the MHI. The
results are presented in Table 5-4. The LQRI projection follows the same logic as the RI projection since
LQHI is assumed to increase at the same rate as the MHI. Additionally, the same rate increases are
assumed. The LQHI is always less than the MHI, so the LQRI is higher than the RI in every year of the
projection for every scenario.
June 30, 2025
Gina Cortese, City of Somerville
Page 23 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
Table 5-4 Projected Lowest Quintile Residential Indicator
6
Summary of FCA
Consistent with the extent of capital improvements needed both to maintain its wastewater system and to
meet regulatory obligations, the results of the City’s FCA Alternative 1 indicate a low financial impact on its
retail households for the Baseline, Limited 2050 TY, 2050 TY, 2050 5-YR, and 2050 25-YR capital plans
and a low financial impact for the Full Sewer Separation capital plan. The FCA evaluated the financial
impacts on the City’s residents for all capital plan scenarios. Both the snapshot of financial impact and the
year-over-year rate increases needed indicate the feasible level of control for LTCP implementation and a
June 30, 2025
Gina Cortese, City of Somerville
Page 24 of 24
Reference:
City of Somerville Financial Capability Assessment (FCA) Update Summary
typical LTCP schedule for the Limited 2050 TY, 2050 TY, 2050 5-YR, and the 2050 25-YR capital plans.
However, the Full Sewer Separation scenario year-over-year rate increases demonstrated significant
impact on ratepayers, suggesting the need for a longer LTCP schedule.
While one alternative of the FCA demonstrates a snapshot of affordability, ratepayer impacts over time in
the second alternative affect affordability year-over-year. Financial impact is affected by the cost of inflation,
which historically has been 2.5% per year for the past 30 years. Costs of borrowing for projects drives the
annual debt service costs.
The implementation of the Amended LTCP depends on the implementation schedule approved by EPA. As
a guide, EPA Guidance indicates the FCA results for the City at Low Financial Impact would follow the
benchmark to maintain a normal implementation schedule.
Table 6-1 EPA Schedule Recommended Implementation Schedule Benchmarks
FCA Results
Implementation Schedule Benchmarks
Low Impact
Normal Schedule
Medium Impact
Generally, up to 10 years
Medium with Financial Alternatives Analysis
Generally, up to 15 years
High Impact
Generally, between 15-20 years
High with Financial Alternatives Analysis
Generally, between 20 – 25 years