SHA4CD Change of Scope Request 10-20-2023 — File 23-1641
Memorandum to Roberta Cameron & City of Somerville
Community PreservaƟon CommiƩee Members Concerning
Proposed ModificaƟons to CPA and ARPA Work Scopes
Prepared by John Hecker, Architect
Spencer PreservaƟon Group, Nahant MA
Architects & Agents for Somerville Hispanic AssociaƟon
for Community Development (SHA4CD)
59 Cross Street
October 20, 2023
This document is intended to be read as a narraƟve that helps to explain the scope of work and costs
provided in the Excel spreadsheet previously submiƩed to Somerville CPA and Somerville ARPA
administrators on October 6, 2023.
All of the work scope items for CPA FY21, FY22, FY23, and ARPA are listed in the far‐leŌ column of the
spreadsheet using CSI categories. Each work scope item is color‐coded to match the color code of the (7)
columns off to the right.
The work scope has not changed for CPA FY21 (light purple in Column ‘A’) and CPA FY22 (light blue in
Column ‘B’). The FY21 work includes the compleƟon of previously started brick masonry cuƫng,
repoinƟng and rebuilding of exisƟng brick masonry at the building cornice and spandrel panels.
The FY22 work scope includes essenƟal preparatory work for the ARPA elevator installaƟon, consisƟng
of foundaƟons and fooƟngs for the new hoistway and elevator pit. The ARPA work cannot begin unƟl
the hoistway foundaƟon and elevator pit have been designed and constructed. The primary General
Contractor for this work would be Cenaxo, LLC, who is also the G.C. for the FY21 work. Cenaxo has
previously completed substanƟal roofing and flashing improvements on the building.
The original work scope for CPA FY23 (green in Column ‘C’) has been moved to the far‐right column (light
warm gray in Column ‘G’) and idenƟfied as a future CPA grant program (perhaps FY25). This is a major
alteraƟon of a previously approved work scope.
The original CPA FY23 work scope focused on restoraƟon of the 2nd floor windows of the Kesher tenant
space, as well as the installaƟon of new storm windows. It also included guƩer and downspout
replacement along the north and south sides of the building, and addiƟonal brick masonry cuƫng,
repoinƟng, and parƟal rebuilding of the brick masonry denƟl cornice and spandrel panels
(supplemenƟng the same, but more limited work scope included in CPA FY21).
Column ‘E’ shows the proposed new work scope for CPA FY23, which now includes the concrete block
elevator hoistway (not the actual elevator), the copper‐clad, rooŌop elevator penthouse, and one of the
two new accessible restrooms. It also includes a $65,000 conƟngency. The elevator hoistway was
originally included in the original ARPA work scope. These adjustments of work scope were required due
to the significantly more expensive elevator and accessible restroom costs that were prepared by the
General Contractor for the proposed ARPA work scope (ZVI ConstrucƟon), which is shown in Column ‘D.’
Column ‘F’ shows the proposed work scope modificaƟons for the ARPA grant (in yellow). The ARPA work
is proposed to include the complete elevator equipment system, but not the CMU elevator hoistway (to
be constructed in the CPA FY22 work scope). It also includes funding for a substanƟal upgrade to the
exisƟng electrical service to the building, to provide adequate power for the new elevator. A conƟngency
of $90,000 is being carried in this column, which may be able to be used to build the second accessible
restroom.
The Somerville ARPA, CPA and HPC administrators have all agreed that the ARPA work scope should be
the primary focus of the work undertaken at the building. The enƟrety of the ARPA grant must be spent
by June 30, 2024. Adjustments to CPA work scope and funding should be reviewed with that goal in
mind.
The first goal of the proposed construcƟon (to successfully complete the ARPA scope of work by June 30,
2024) is to design and construct the elevator hoistway foundaƟon, fooƟngs and elevator pit that are
included in the CPA FY22 funding grant. This work will take place within the basement‐level Social Hall
and will require parƟal demoliƟon of the exisƟng basement slab, and some rock ledge removal to install
the hoistway elevator pit and foundaƟons.
A concurrent goal would be to work with NaƟonal Grid to increase the size of the current electrical
service to the building, which can be a long lead item. The new elevator cab and all related hardware
and equipment would also be ordered immediately, because it may have a lead‐Ɵme of approximately
37‐weeks. These two costs would be included in the ARPA grant amount. The actual installaƟon of the
elevator would be included in the FY23 work scope because the elevator installaƟon will probably be
completed aŌer June 30, 2024.
Overall Summary of the Proposed Work Programs (listed in order of priority)
ARPA Grant:
Provide new elevator cab and all related elevator system components.
Provide new electrical service to building to support new elevator.
Provide (1) new accessible restroom (possibly using ARPA construcƟon conƟngency).
CPA FY23:
Provide new CMU elevator hoistway and copper‐covered rooŌop elevator penthouse.
Provide (1) new accessible restroom (possibly using FY23 construcƟon conƟngency).
CPA FY22:
Provide extensive site and building accessibility improvements along north side of building.
Provide foundaƟon pad, fooƟngs, and elevator pit for FY23 hoistway and ARPA elevator.
Raise floor level of basement Social Hall to match elevaƟon of kitchen and stage areas.
Restore/replace exisƟng windows at 2nd and 3rd floors of southeast tower (east side).
CPA FY21:
Cut and repoint designated areas of brick masonry denƟl cornice.
Cut, repoint, and rebuild designated areas of brick masonry spandrel panels.
Future CPA Grant:
Restore exisƟng windows of 2nd floor tenant space and at south side of southeast tower.
Provide new exterior storm windows to restored wood windows of 2nd floor tenant space.
Raise floor of lower‐level Social Hall to match elevaƟon of kitchen and stage areas.
Restore windows at 2nd and 3rd floors of southeast tower (south side).
Cut and repoint addiƟonal areas of brick masonry denƟl cornice.
Cut, repoint, and rebuild addiƟonal areas of brick masonry spandrel panels.
Provide new copper guƩers and aluminum downspouts along 2‐story secƟon of building.
SHA4CD Work Scope with Proposed Changes for 59 Cross Street, Somerville, MA
OVERVIEW OF CURRENT WORK SCOPE & BUDGETS
(A) $49,500
(B) $494,000
(C) $425,000
(D) $486,000
(E) $425,000
(F) $486,000
(G) $469,800
DIVISION
Somerville CPA
FY21
Somerville CPA
FY22
Somerville CPA FY23
Somerville ARPA
Somerville CPA FY23
Somerville ARPA
Somerville CPA
Future Grant Work
Scope to be
Completed
01 ‐ General Requirements
Work scope
previously begun
Proposed work
scope is
unchanged
Original work scope is
proposed to be
changed; see
Columns 'E' & 'G'
Original work scope
as proposed; see
Column 'F' for
proposed changes
Proposed new work
scopefor CPA FY23
Revised & Proposed
ARPA Scope Based
Upon Updated G.C.
Cost Estimate
02 ‐ Existing Conditions
2.1
Demolish existing concrete sidewalk to existing north basement entry (FY22)
$150,000
2.2
Demolish existing concrete retaining wall at north basement entry (FY22)
included in 2.1
2.3
Demolish existing stone retaining wall along north property line (FY22)
included in 2.1
2.4
Demolish existing roof canopy above existing north basement entry (FY22)
included in 2.1
2.5
Raise lower‐level basement entry door opening at north elevation (FY22)
$10,000
2.6
Cut opening in basement slab for new elevator foundation and elevator pit (FY22)
included in 3.3
2.7
Remove and dispose of existing aluminum storm windows at 2nd floor (FY23)
included in 8.6
included in 8.6
2.8
Cut openings in floor and roof framing for new elevator hoistway (ARPA)
move to revised FY23
included in 4.5
03 ‐ Concrete
3.1
Provide new "flowable fill" above existing Social Hall slab at basement (FY22)
inluded in 3.2
3.2
Provide new concrete slab on top of waterproofing membrane and insulation (FY22)
$135,000
3.3
Provide new concrete pad foundation and elevator pit for future hoistway (FY22)
$50,000
04 ‐ Masonry
4.1
Cut and repoint existing brick masonry at dentil course (FY 21)
$10,000
4.2
Cut and repoint existing brick masonry at dentil course (FY 23)
$20,000
$20,000
4.3
Cut and repoint existing brick masonry spandrel panels (FY21)
$19,500
4.4
Cut and repoint existing brick masonry spandrel panels (FY23)
$20,000
$20,000
4.5
Provide new 3‐stop CMU elevator hoistway and elevator (ARPA) ‐ est. $300,000
$300,000
$301,245 hoistway only
4.6
Provide new retaining wall along north property line & abutter's driveway (FY22)
included in 2.1
Subtotal
Subtotal
Subtotal
OVERVIEW OF CURRENT WORK SCOPE & BUDGETS
(A) $49,500
(B) $494,000
(C) $425,000
(D) $486,000
(E) $425,000
(F) $486,000
(G) $469,800
DIVISION
Somerville CPA
FY21
Somerville CPA
FY22
Somerville CPA FY23
Somerville ARPA
Somerville CPA FY23
Somerville ARPA
Somerville CPA
Future Grant Work
Scope to be
Completed
05 ‐ Metals
5.1
Provide steel framing and hangers at new CMU elevator hoistway (ARPA)
move to revised FY23
included in 4.5
5.2
Provide new metal fence on top of north property line retaining wall (FY22)
included in 2.1
5.3
Provide new handrails and guardrails at new site stairs & entry door area (FY22)
included in 2.1
5.4
Provide reinforcing for new Social Hall concrete slab and elevator foundation (FY22)
included in 2.1
5.5
Provide steel entry canopy at north basement entry (FY22 ‐ Alt. 1)
$15,000 Alternate
06 ‐ Wood, Plastics, & Composites
6.1
Provide new wood infill flooring and roof framing at new elevator hoistway (ARPA)
move to revised FY23
included in 4.5
6.2
Emergency Work on Roof Truss during FY20
$11,510
07 ‐ Thermal & Moisture Protection
7.1
Provide red copper cladding and roofing for elevator hoistway (ARPA)
move to revised FY23
included in 4.5
7.2
Provide red copper gutters at north and south sides of central building (FY23)
$68,000
$68,000
7.3
Provide "copper penny" downspouts at north/south sides of central building (FY23)
included in 7.2
included in 7.2
7.4
Provide rigid insulation below new basement floor slab of Social Hall (FY22)
included in 3.2
7.5
Provide copper flashing at west and north sides of southeast tower
$15,000
Subtotal
Subtotal
Subtotal
OVERVIEW OF CURRENT WORK SCOPE & BUDGETS
(A) $49,500
(B) $494,000
(C) $425,000
(D) $486,000
(E) $425,000
(F) $486,000
(G) $469,800
DIVISION
Somerville CPA
FY21
Somerville CPA
FY22
Somerville CPA FY23
Somerville ARPA
Somerville CPA FY23
Somerville ARPA
Somerville CPA
Future Grant Work
Scope to be
Completed
08 ‐ Openings
8.1
Restore (3) arched east windows and frames at 2nd floor of SE tower (FY22 ‐ Alt.1)
$20,000
8.2
Restore (3) arched south windows and frames at 2nd floor of SE tower (FY23)
Contingency Alternate
$20,000
8.3
Provide new large arched east window at 3rd floor of SE tower (FY22 ‐ Alt. 2)
$15,000
8.4
Provide new large arched south window at 3rd floor of SE tower (FY23)
Contingency Alternate
$15,000
8.5
Provide new small attic window sash and frame at east attic gable (FY23)
included in 8.7
$5,000
8.6
Provide new aluminum storm windows at 2nd floor of Kesher tenant space (FY23)
$65,000
$65,000
8.7
Restore existing wood windows and frames at 2nd floor Kesher tenant space (FY23)
$135,000
$135,000
8.8
Provide steel door and doorframe at new Elevator Machine Room (ARPA)
move to revised FY23
included in 4.5
8.9
Provide new paneled wood doors and frames in two accessible restrooms (ARPA)
move to revised FY23
included in 4.5
8.1
Remove and reinstall interior double doors in Social Hall at higher location (FY22)
included in 3.2
09 ‐ Finishes
9.1
Provide wood‐framed partitions for new accessible restrooms on main floor (ARPA)
$60,000 for (2) restrooms $52,217 for 2nd restroom $65,915 for 1st restroom
(contingency item)
(contingency item)
9.2
Provide gypsum wallboard on walls of new restrooms and elevator hoistway (ARPA)
move to revised FY23
included in 9.1
9.3
Paint new gypsum wallboard walls & ceilings of restrooms and elevator hoistway (ARPA)
move to revised FY23
included in 9.1
9.4
Paint all new restroom & elevator doors, doorframes and trim (ARPA)
move to revised FY23
included in 9.1
9.5
Prime and paint all 2nd floor Kesher tenant space exterior windows (ARPA)
included in 8.7
included in 8.7
9.6
Paint rehabilitated basement entry door and frame at north side (FY22)
included in 2.5
9.7
Paint new concrete floor slab in Social Hall
included in 3.2
9.8
Provide ceramic tile walls and floor surfaces in (2) accessible restrooms (ARPA)
included in 9.1
included in 9.1
included in 9.1
Subtotal
Subtotal
OVERVIEW OF CURRENT WORK SCOPE & BUDGETS
(A) $49,500
(B) $494,000
(C) $425,000
(D) $486,000
(E) $425,000
(F) $486,000
(G) $469,800
DIVISION
Somerville CPA
FY21
Somerville CPA
FY22
Somerville CPA FY23
Somerville ARPA
Somerville CPA FY23
Somerville ARPA
Somerville CPA
Future Grant Work
Scope to be
Completed
14 ‐ Vertical Transportation
14
Provide (1) holeless 3‐stop elevator & EMR; no hoistway (revised ARPA cost est.)
$245,875
14
Provide (1) holeless 3‐stop elevator, EMR and hoistway structure (original ARPA cost est.)
$300,000
16 ‐ VElectrical and Lighting
16
Provide new electrical service to building for new elevator (revised ARPA cost est.)
$97,756
16
Provide electrical circuits and outlets for (2) accessible restrooms (ARPA)
included in 9.1
included in 9.1
included in 9.1
16
Provide electrical service and outlets for future elevator (ARPA)
not in contract work scope
16
Provide light fixtures, exhaust fan and fire alarms in (2) new restrooms (ARPA)
included in 9.1
included in 9.1
included in 9.1
22 ‐ Plumbing
22
Provide new plumbing services to (2) new accessible restrooms on main floor (ARPA)
included in 9.1
included in 9.1
included in 9.1
22
Provide new toilets, sink and fixtures in (2) accessible restrooms (ARPA)
included in 9.1
included in 9.1
included in 9.1
32 ‐ Exterior Improvements
32
Provide new concrete sidewalk to new accessible basement entry (FY22)
included in 2.1
32
Provide new concrete site stairs along north property area (FY22)
included in 2.1
32
Provide concrete retaining wall at new accessible basement entry (FY22)
included in 2.1
32
Provide new retaining wall at abutting north property line and driveway (FY22)
included in 2.1
33
Provide seeded lawn, trees and other landscape elements (FY22)
included in 2.1
SCOPE OF WORK COST
$44,500.00
$391,510.50
$308,000.00
$360,000.00
$301,245.00
$343,631.00
$348,000.00
General Requirements (included in above line items)
Overhead and Profit (included in above line items)
Payment and Performance Bonds (included in above line items)
CONSTRUCTION TOTAL
$44,500.00
$391,510.50
$308,000.00
$360,000.00
$301,245.00
$343,631.00
$348,000.00
20% Contingency
$57,000.00
$61,600.00
$72,000.00
$65,355.00
$90,824.00
$69,600.00
12‐15% Architectural & Enguneering Fees
$5,000.00
$45,600.00
$46,200.00
$54,000.00
$49,400.00
$51,545.00
$41,760.00
3% Project Management Fee
$9,200.00
$9,000.00
$10,309.00
$10,440.00
PROJECT COST TOTAL
$49,500.00
$494,110.50
$425,000.00
$486,000.00
$425,000.00
$486,000.00
$469,800.00
Subtotal
Subtotal
Subtotal
Subtotal