Matters βΈ Attachment
Amendment Chapter 11 Water and Sewer Department and Title β File 24-0331
CITY OF SOMERVILLE
ORDINANCE NO. 2024-
IN CITY COUNCIL: ________, 2024
Be it ordained by the City Council, in session assembled, that Sections 11-1, 11-3, 11-4, 11-121, 11-124, 11-125,
11-164, 11-176, 11-182, and 11-183, and the title of Chapter 11 Article V of the code of ordinances of the City of
Somerville are amended as follows by deleting the struckthrough text and adding the underlined text.
Sec. 11-1. β Commissioner of public works duties.
(a) The commissioner of public works shall have the direction and control of the construction, alteration, repair,
maintenance and management of ways, streets, sidewalks and bridges; he or she the commissioner shall have
the powers and discharge the duties of surveyors of highways; the construction, alteration, repair and care of
main drains and common sewers; the care, superintendence and management of the public grounds and parks,
including cemeteries; he or she the commissioner shall make and have the custody of all plans, surveys,
measurements and levels appertaining to public ways, drains, sewers, waterworks or lands; he or she the
commissioner shall have charge of the construction, alteration, repair, maintenance and care of public
buildings; he or she the commissioner shall have charge, so far as the rights of the city extend, of fire alarm
and police signal systems and of all electric light, power, telephone, telegraph and trolley wires, of all gas pipes
and street lighting; he or she shall have charge of the construction, extension, alteration, repair, care and
management of the waterworks; and shall perform such other duties as the city council may direct.
Sec. 11-3. - Department of public works divisions.
(a) There shall be established within the department of public works the following divisions:
(1) Division of highways, electric lines and lights;
(2) Division of engineering;
(3) Division of waterworks
(4) (3) Division of buildings
Sec. 11-4. - Superintendents of department of public works divisions.
There shall be a superintendent of the division of highways, electric lines and lights; a city engineer; a
superintendent of the division of waterworks; a superintendent of the division of buildings; and a
supervisor of school facilities and energy conservation. The city engineer and the superintendents of the
various divisions shall have the charge of their respective divisions under the direction of the commissioner
of public works.
Article V. β DIVISION OF WATERWORKS WATER AND SEWER DEPARTMENT
Sec. 11-121. β Interference with water system.
No person shall break or in any manner injure any water main, service pipe, stop-cock valve, hydrant,
waterpost, drinking foundation or other fixture or appurtenance connected with the city waterworks, or shall
obstruct or in any way interfere with the flow of water through the same. No person shall turn on or off the
water in any water main, street service pipe, hydrant, waterpost, drinking foundation or other fixture or
appurtenance connected with said waterworks, or make any opening into or connection therewith, without
authority from the superintendent of waterworks director of water and sewer, except that hydrants may be
used by firemen in the discharge of their duties. No person shall in any manner place obstructions in the way
of readily operating any valve, hydrant, waterpost, stop-cock or other fixture or appurtenance of the
waterworks.
Sec. 11-124. β Rules and regulations of the superintendent of water director of water and sewer
No person shall violate any rule or regulation of the superintendent of waterworks director of water and sewer.
Sec. 11-125. β Water rates and base charges.
(a) Established. Water rates and base charges for water use shall be established by the superintendent of the water
and sewer department director of water and sewer, subject to the approval of the mayor and city council. Prior
to setting the water rates and base charges, the superintendent director shall conduct a public hearing on the
proposed rates and charges no later than May 15 of any given year with notice of any new rates or charges
provided to the city council at least 14 days prior to the public hearing. Any proposed new rates and charges
shall be provided to the city council on or before June 1 for its review and approval. Rates set may be adjusted,
subsequent to initial approval by the superintendent director with the approval of the mayor and city council,
without the necessity of a public hearing, to reflect any changes in any charge assessed to the city by any
governmental body or agency of the commonwealth. If any such adjustment results in a lower rate than
previously set, the new rate shall take effect immediately upon approval by the mayor and city council. If such
adjusted rate is higher than otherwise set, the new rate shall take effect no sooner than 30 days after approval
by the mayor and city council. Except as otherwise approved by the city council, failure to hold a public hearing
on or before May 15, or provide the proposed rates and charges to the city council for its review on or before
June 1 as required above shall prohibit the city from increasing rates and charges.
(b) Method of assessment. Rates shall be established based upon a uniform rate per 100 cubic feet of water
consumed. Said assessments shall be made pursuant to readings obtained from metering devices approved by
the commissioner director. Where water consumption data is not available, bills for water use shall be based
upon estimated consumption, as determined by the commissioner director.
(c) Payment. Bills for water use shall be rendered a minimum of two per year and a maximum of six per year for
commercial and four per year for residential and are due and payable within 45 days. Interest shall accrue on
bills not paid within 45 days of the date of mailing at the rate established by Section 57 of Chapter 59 of the
General Laws.
(d) Appeals. Persons aggrieved of bills rendered pursuant to subsection (c) of this section shall have the following
rights of appeal:
(1) Notification. Within the time frame allowed for payment of said bill, the aggrieved party shall notify the
commissioner director that said bill is contested. The notification shall include an explanation as to why
the bill is contested, and should provide the commissioner director with such information as is necessary
to determine the validity of the claim. The commissioner director may prescribe such forms as are
necessary to expedite this process.
(2) Resolution. Upon receipt of an appeal, the commissioner director shall act upon same as quickly as
possible and shall inform the claimant in writing of the results of the investigations. The determination of
the commissioner director shall also be transmitted to the treasurer who shall take the following action:
a. For first claims and claims found to be valid, the date of billing shall be revised to the date of the
commissioner director's determinations. Revised charges shall then be due and payable as is specified
in subsection (c) of this section.
(f) Residents who own and occupy their homes and qualify for the exemptions contained in G.L. c. 59, Β§ 5, clause
41C, or G.L. c. 59, Β§ 5, clause 17D, are eligible for a 25 percent discount on water/ and sewer bills issued after
July 1, 2016.
Sec. 11-164. β Sewer user rates and base charges.
(a) User Rates and base charges
(1) Established. Charges for s Sewer service rates and base charges for sewer use shall be established by the
superintendent of the water and sewer department director of water and sewer, subject to the approval of
the mayor and city council. Prior to setting the new sewer service charge, the water and sewer
superintendent director shall conduct a public hearing on the proposed charge no later than May 15 of
any given year with notice of any new charges provided to the city council at least 14 days prior to the
public hearing. Any proposed new charges shall be provided to the city council on or before June 1 of any
given year for its review and approval. Charges may be adjusted, subsequent to initial approval by the
superintendent director, with the approval of the mayor and city council, without the necessity of a public
hearing, to reflect any changes in any charge assessed to the city by any governmental body or agency of
the commonwealth. If any such adjustment results in a lower charge than previously set, the new charge
shall take effect immediately upon approval by the mayor and city council. If such adjusted charge is higher
than otherwise set, the new charge shall take effect no sooner than 30 days after approval by the mayor
and city council. Except as otherwise approved by the city council, failure to hold a public hearing on or
before May 15, or provide the proposed charges to the city council for its review on or before June 1 as
required above shall prohibit the city from increasing charges.
(2) Method of assessment. Rates shall be established based upon a uniform rate per 100 cubic feet of water
consumed. At a user's option and expense, assessments may be made on continuously metered sewage
flow, or upon water sales to activities resulting in a discharge to the sewer. Said assessments shall be made
pursuant to readings obtained from metering devices approved by the commissioner director. For users
whose bill is based upon metered sewage, the rate shall be 1.11 times the rate established for those whose
bill is based upon metered water. Where water consumption data is not available, bills for sewer services
shall be based upon estimated consumption, as determined by the commissioner director.
(3) Payment. Bills for sewer service shall be rendered a minimum of two per year and a maximum of six per
year for commercial and four per year for residential and are due and payable within 45 days. Interest shall
accrue on bills not paid within 45 days from the date of mailing at the rate established by Section 57 of
Chapter 93 59 of the General Laws.
(b) Appeals.
(1) Notification. Within the time frame allowed for payment of said bills, the aggrieved party shall notify the
commissioner director that said bill is contested. The notification shall include an explanation as to why
the bill is contested, and should provide the commissioner director with such information as is necessary
to determine the validity of the claim. The director may prescribe such forms as are necessary to expedite
this process.
(2) Resolution. Upon receipt of an appeal, the commissioner director shall act upon same as quickly as
possible and shall inform the claimant in writing of the result of the investigations. The determination of
the commissioner director shall also be transmitted to the treasurer who shall take the following action:
a. For first claims and claims found to be valid, the date of billing shall be revised to the date of the
commissioner director's determinations. Revised charges shall then be due and payable as is specified
in subsection (ba)(3) of this section.
b. For second and subsequent claims found to be invalid, the date of billing shall be as originally issued,
and charges and interest shall be computed as specified in subsection (ba)(3) of this section.
Sec. 11-176. β Illicit discharges to storm drainage system.
(a) Purpose
(3) The objectives of this division are:
a. To prevent pollutants from entering the city's municipal separate storm sewer system (MS4);
b. To prohibit illicit connections and unauthorized discharges to the MS4;
c. To require the removal of all such illicit connections;
bd. To comply with state and federal statutes and regulations relating to stormwater discharges; and
ce. To establish the legal authority to ensure compliance with the provisions of this division through
inspection, monitoring, and enforcement.
Sec. 11-182. β Authority of water superintendent director of water and sewer.
(b) As provided in this Code of Ordinances, section 11-124, violation of the superintendent director's rules is
prohibited.
Sec. 11-183. β Protection of potable water supply.
The water and sewer department or its designated agent shall be responsible for the protection of the public potable
water distribution system from contamination or pollution due to the backflow or backsiphonage of contaminants
or pollutants. If, as a result of a survey of the premises, the department or its designated agent determines that an
approved backflow prevention device is required at the city's water service connection or impact protection on any
customer's premises, the department, or its designated agent, shall issue a cross connection violation form to the
customer to install approved backflow devices. The customer shall, within a time frame determined by the
department, install such approved device or devices at his/her own expense; and failure or refusal or inability on
the part of the customer to install said device or devices within the specified time frame shall constitute a ground
for discontinuing water service to the premises until such device or devices have been properly installed.
Approved:
President
Approved:
Mayor