42 Cross St Somerville Envelope + MEP Upgrade DD Estimate 3.20.24 — File 24-0412

File 24-0412·8 pages·📄 Original PDF (city portal)·sha256 6ce1ffbbb015…
Funding Request Estimate 42 Cross Street Envelope & MEP Upgrades Somerville, MA PM&C LLC 20 Downer Ave, Suite 5 Prepared for: Hingham, MA 02043 (T) [phone removed] The City of Somerville March 20, 2024
42 Cross Street Envelope & MEP Upgrades 20-Mar-24 Funding Request Estimate MAIN CONSTRUCTION COST SUMMARY Envelope & MEP Upgrades Construction Start GSF Cost/GSF Estimated Cost TRADE COSTS Envelope & MEP Upgrades Sep-24 3,351 $160.01 $536,181 $536,181 Design and Estimating Contingency 5.0% $26,809 Escalation 2.0% $10,724 $573,714 General Conditions $120,000 General Requirements 4.0% $22,949 Insurances 2.00% $11,474 Bond 1.00% $5,737 Overhead + Profit 12.00% $68,846 Building Permit Waived TOTAL ESTIMATED CONSTRUCTION COST Sep-24 $3,351 $240 $802,720 ITEMS NOT INCLUDED IN THIS ESTIMATE Items not included in this estimate are: All professional fees and insurance Project phasing Site or existing conditions surveys investigations costs, including to determine subsoil conditions Items identified in the design as Not In Contract (NIC) Items identified in the design as by others Work to City streets and sidewalks, (except as noted in this estimate) Lead paint removal/ Haz Mat This cost estimate was produced from drawings prepared by SOCOTEC AE Consulting, LLC and their design team dated 3/13/24 . Design and engineering changes occurring subsequent to the issue of these documents have not been incorporated in this estimate. SUBTOTAL TRADE COSTS SUBTOTAL Bidding conditions are expected to be public bidding to pre-qualified (DCAMM certified) general contractors, open bidding for sub-contractors, open specifications for materials and manufacturers. The estimate is based on prevailing wage rates for construction in this market and represents a reasonable opinion of cost. It is not a prediction of the successful bid from a contractor as bids will vary due to fluctuating market conditions, errors and omissions, proprietary specifications, lack or surplus of bidders, perception of risk, etc. Consequently the estimate is expected to fall within the range of bids from a number of competitive contractors or subcontractors, however we do not warrant that bids or negotiated prices will not vary from the final construction cost estimate. This estimate includes all direct construction costs, contractor's overhead and profit and design contingency. Cost escalation is included until start date indicated. Executive Summary Page 2 PMC - Project Management Cost
42 Cross Street Envelope & MEP Upgrades Somerville, MA 20-Mar-24 Funding Request Estimate DIVISION Subtotal Total CONSTRUCTION COST SUMMARY IN CSI FORMAT DIV. 2 EXISTING CONDITIONS $23,790 024119 Selective Demolition $23,790 025000 Hazardous Abatement Excluded DIV. 4 MASONRY 040001 Masonry DIV. 5 METALS $16,375 055000 Metal Fabrications $16,375 DIV. 6 WOODS & PLASTICS $11,873 061000 Rough Carpentry $10,673 062000 Finish Carpentry $1,200 DIV. 7 THERMAL & MOISTURE PROTECTION $187,877 075300 Roofing $181,955 079200 Joint Sealants $5,922 DIV. 8 DOORS & WINDOWS $62,999 082200 FRP Doors $2,050 085100 Aluminum Windows $17,640 086200 Skylights $43,309 DIV. 9 FINISHES $20,439 092116 Gypsum Board Assemblies $12,925 099000 Painting $5,014 DIV. 10 SPECIALTIES 101400 Signage DIV. 12 FURNISHINGS $980 124000 Shades $980 DIV. 21 FIRE PROTECTION No Scope 210000 Fire Protection DIV. 22 PLUMBING $13,200 220000 Plumbing $13,200 DIV. 23 HVAC $156,650 230000 HVAC $156,650 DIV. 26 ELECTRICAL $31,248 260000 Electrical $31,248 DIV. 32 EXTERIOR IMPROVEMENTS $8,500 320000 Site Demolition $5,000 323000 Site Improvements $3,500 329000 Landscaping DIV. 33 SITE UTILITIES $2,250 334000 Storm Drainage $2,250 SUBTOTAL DIRECT (TRADE) COST $536,181 CSI Summary Page 3 PMC - Project Management Cost
42 Cross Street 20-Mar-24 Envelope & MEP Upgrades Funding Request Estimate GFA 3,351 UNIT EST'D SUB TOTAL CSI CODE DESCRIPTION QTY UNIT COST COST TOTAL COST Envelope & MEP Upgrades 1 GROSS FLOOR AREA 2 3 First Floor 3,351 4 5 TOTAL GROSS FLOOR AREA (GFA) 3,351 sf 6 7 8 02 EXISTING CONDITIONS 9 10 024119 Selective Demolition 11 Remove exterior door and frame, SL; prep for new 1 ea 200.00 200 12 Remove and dispose storefront 98 sf 15.00 1,470 13 024100 Remove roofing systems Incl below in roofing 14 024100 Remove skylights 258 sf 15.00 3,870 15 024100 Remove roof hatch 1 ea 750.00 750 16 Removal of MEP See MEP trades 17 024100 Temporary edge protection at perimeter (sides and rear) 1 ea 10,000.00 10,000 18 Misc. demolition/ protection 1 ls 7,500.00 7,500 19 SUBTOTAL 23,790 $ 20 21 025000 Hazardous Components Abatement 22 Asbestos abatement to roof Excluded 23 SUBTOTAL - $ 24 25 TOTAL, DIVISION 3 - CONCRETE $23,790 26 27 03 CONCRETE 28 29 033000 Concrete 30 No work in this section 31 SUBTOTAL - $ 32 33 TOTAL, DIVISION 3 - CONCRETE 34 35 04 MASONRY 36 37 040001 Masonry 38 No work in this section 39 SUBTOTAL - $ 40 41 TOTAL, DIVISION 4 - MASONRY 42 43 05 METALS 44 45 055000 Metal Fabrications 46 Infill deck at removed hatch 9 sf 75.00 675 47 Repairs to existing deck, assumed not required 3,443 sf NR 48 Roof ladder with locking security gate 1 ea 8,000.00 8,000 49 Safety guardrail on weighted base 22 lf 350.00 7,700 50 SUBTOTAL 16,375 $ 51 52 TOTAL, DIVISION 5 - METALS $16,375 53 54 06 WOOD & PLASTICS 55 56 061000 Misc. Rough Carpentry 57 Misc. blocking and rough carpentry at new roofing 3,452 sf 1.75 6,041 58 Premium for parapets / roof edge 243 lf 16.00 3,888 59 Misc. blocking and rough carpentry at new windows 45 lf 12.00 540 60 Misc. blocking and rough carpentry at new doors 17 lf 12.00 204 61 SUBTOTAL 10,673 $ 62 63 062000 Finish Carpentry 64 New window stool, allow 16 lf 75.00 1,200 65 SUBTOTAL 1,200 $ 66 67 TOTAL, DIVISION 6 - WOOD & PLASTICS $11,873 68 Building Backup Page 4 PMC - Project Management Cost
42 Cross Street 20-Mar-24 Envelope & MEP Upgrades Funding Request Estimate GFA 3,351 UNIT EST'D SUB TOTAL CSI CODE DESCRIPTION QTY UNIT COST COST TOTAL COST Envelope & MEP Upgrades 69 70 07 THERMAL & MOISTURE PROTECTION 71 72 075300 Roofing 73 075430 Roofing Demolition 74 Remove membrane and ballast including insulation and flashings; no HAZ MAT assumed 3,452 sf 4.00 13,808 75 024100 Premium for removing existing perimeter, flashing/blocking , etc 243 lf 10.00 2,430 76 Premium, vacuum gravel from ribs of steel deck 3,452 sf 1.50 5,178 77 075430 Temp protection allowance 3,452 sf 2.00 6,904 78 075430 Prep existing metal deck to receive new finish 3,452 sf 0.25 863 79 New Roof 80 70002 PVC membrane, on 1/2" high density coverboard on 2 layers rigid insulation, on vapor barrier on 1/2" protection board 3,452 sf 35.00 120,820 81 70002 Premium for tapered insul (at skylights and equip only) 26 sf 7.50 195 82 70002 Perimeter Details & Flashings 83 Perimeter detail 1/A6 high parapet - 21" parapet cap 49 lf 75.00 3,675 84 Perimeter detail 3/A5 low parapet- 12" parapet cap 145 lf 65.00 9,425 85 70002 Perimeter detail 2/A5 - Drip edge 49 lf 25.00 1,225 86 70002 Flashing at wall, incl cut reglet in brick 8 lf 75.00 600 87 70002 Flashing at low parapet 146 lf 35.00 5,110 88 Flashing at rooflight & equip curb 92 lf 35.00 3,220 89 Flashing to top of large skylight, incl cut reglet in brick 40 lf 75.00 3,000 90 Flashing to sleeper 4 lf 45.00 180 91 Abandoned penetration, remove, infill 7 ea 125.00 875 92 Pipe penetration, gooseneck & vent pipe flashing 5 ea 150.00 750 93 Rubberized pipe support to HVAC 2 ea 100.00 200 94 Walk pads 51 sf 12.00 612 95 Gutters 49 lf 35.00 1,715 96 Downspouts 39 lf 30.00 1,170 97 SUBTOTAL 181,955 $ 98 99 079200 Joint Sealants 100 Allowance for misc. sealants at roof 3,452 sf 1.50 5,178 101 070001 Backer rod & double sealant at doors/hm frames 62 lf 12.00 744 102 SUBTOTAL 5,922 $ 103 104 TOTAL, DIVISION 7 - THERMAL AND MOISTURE PROTECTION $187,877 105 106 08 DOORS & WINDOWS 107 108 085100 Aluminum Windows 109 Storefront 98 sf 180.00 17,640 110 SUBTOTAL 17,640 $ 111 112 082200 Hollow Metal Doors 113 82200 New fiberglass single door in pressed metal frame and hardware 1 ea 2,050.00 2,050 114 SUBTOTAL 2,050 $ 115 116 086200 Skylights 117 86200 Skylight w/ insulated glazing, 4' 4" x 4' 4" 4 ea 2,812.34 11,249 118 86200 Skylight w/ insulated glazing, 40' 0" x 4' 7" 1 ea 32,060.00 32,060 119 SUBTOTAL 43,309 $ 120 121 TOTAL, DIVISION 8 - DOORS AND WINDOWS $62,999 122 123 09 FINISHES 124 125 929000 Gypsum Board Assemblies 126 Patch/ replace gypsum board @ window & door head and jamb, 14" wide - allow 62 lf 25.00 1,550 127 Patch/ replace gypsum board @ skylight average 30" high - allow 395 sf 25.00 9,875 128 092900 Patch/replace wall & GWB ceilings due to water damage, allow 1 ls 1,500.00 1,500 129 SUBTOTAL 12,925 $ 130 Building Backup Page 5 PMC - Project Management Cost
42 Cross Street 20-Mar-24 Envelope & MEP Upgrades Funding Request Estimate GFA 3,351 UNIT EST'D SUB TOTAL CSI CODE DESCRIPTION QTY UNIT COST COST TOTAL COST Envelope & MEP Upgrades 131 090007 Painting 132 Paint gypsum board at replacement windows 62 lf 5.00 310 133 Paint gypsum board at replacement skylights 988 sf 3.00 2,964 134 Paint/ Stain new wood sill at replacement windows 16 lf 15.00 240 135 Paint/touch up GWB walls & ceilings, due to water damage, allow 1 ls 1,500.00 1,500 136 SUBTOTAL 5,014 $ 137 138 095000 ACT Ceiling 139 Allowance for replacing water damaged tiles 1 ls 2,500.00 2,500 140 SUBTOTAL 2,500 141 142 TOTAL, DIVISION 9 - FINISHES $20,439 143 144 10 SPECIALTIES 145 146 101400 Signage 147 Assumed no scope required Excluded 148 SUBTOTAL - $ 149 150 TOTAL, DIVISION 10 151 152 153 12 FURNISHINGS 154 155 124000 Shades 156 124000 Shade to new storefront 98 sf 10.00 980 157 SUBTOTAL 980 158 159 TOTAL, DIVISION 12 - FURNISHINGS 980 160 147 148 21 FIRE PROTECTION 149 150 210000 FIRE PROTECTION, GENERALLY 151 No work in this section 152 SUBTOTAL - 153 154 TOTAL - FIRE PROTECTION 169 156 157 22 PLUMBING 158 173 220000 Plumbing 174 Equipment 161 220000 Point of use domestic water heater, 6 kw 3 ea 900.00 2,700 162 220000 Domestic Water Type L Copper Pipe 163 220000 Domestic water heater piping connections with HW piping to sink 3 ea 1,250.00 3,750 164 220000 Domestic water pipe insulation 3 ea 250.00 750 165 220000 Valves & Accessories 1 ls 500.00 500 166 220000 Miscellaneous 167 220000 Demolition - remove water heater and all HW piping 1 ls 2,000.00 2,000 168 220000 Coordination & BIM 1 ls 2,000.00 2,000 169 220000 Testing and sterilization 1 ls 1,500.00 1,500 170 220000 Fees & permits waived 185 SUBTOTAL 13,200 $ 186 187 TOTAL, DIVISION 26 $13,200 188 189 190 23 HVAC 191 192 230000 HVAC 179 230000 HVAC Equipment 180 230000 Rooftop unit with curb 5 tons, 2000 cfm 2 ea 47,500.00 95,000 Building Backup Page 6 PMC - Project Management Cost
42 Cross Street 20-Mar-24 Envelope & MEP Upgrades Funding Request Estimate GFA 3,351 UNIT EST'D SUB TOTAL CSI CODE DESCRIPTION QTY UNIT COST COST TOTAL COST Envelope & MEP Upgrades 181 230000 Reinstall ACCU 1 ea 3,600.00 3,600 182 230000 Sheet metal & Accessories 183 230000 Ductwork transitions from RTU to existing main duct 4 ea 2,500.00 10,000 184 230000 Duct insulation 1 ls 2,500.00 2,500 185 230000 Piping 186 230000 Refrigerant Piping 187 230000 Reconnect refrigerant piping to ACCU 1 ls 3,000.00 3,000 188 230000 Condensate Drain Piping 189 230000 Condensate drain piping with fittings & hangers 1 ls 750.00 750 190 230000 Piping Insulation 191 230000 Piping insulation, refrigerant piping connection 1 ls 1,000.00 1,000 192 230000 Automatic Temperature Controls 193 230000 RTU reconnect to existing thermostat 2 ea 3,500.00 7,000 194 230000 Balancing 195 230000 System testing & balancing 1 ls 5,000.00 5,000 196 230000 Miscellaneous 197 230000 Demolition - remove (2) RTU's, ACCU 1 ls 5,000.00 5,000 198 230000 Refrigerant purge and charge 1 ls 2,500.00 2,500 199 230000 Coordination & BIM 1 ls 10,000.00 10,000 200 230000 Coring, sleeves & fire stopping 1 ls 800.00 800 201 230000 Equipment start-up and inspection 1 ls 1,000.00 1,000 202 230000 Rigging & equipment rental 1 ls 9,000.00 9,000 203 230000 Vibration & seismic restraints 1 ls 500.00 500 204 230000 Fees & permits waived 219 SUBTOTAL 156,650 $ 220 221 TOTAL, DIVISION 26 $156,650 222 223 224 26 ELECTRICAL 225 212 261000 SERVICE & DISTRIBUTION 213 Gear & Distribution 214 Normal Power 215 Modify and make connections at existing panelboards 1 ls 2,500.00 2,500 216 Equipment Wiring feeds and connections 217 RTU connections (25A) 2 ea 1,000.00 2,000 218 25A feed to RTU's (30A) 160 lf 20.00 3,200 219 Water heater connection 3 ea 500.00 1,500 220 40A feed to WH 140 lf 22.00 3,080 221 ACCU (Relocated) 1 ea 3,000.00 3,000 222 Heat trace ETR 223 Motorized damper feed and connection 1 ea 1,000.00 1,000 224 SUBTOTAL 16,280 225 226 262000 LIGHTING & POWER 227 Lighting fixtures 228 Remove and reinstall light fixtures for ceiling removal (minimal) 1 ls 2,000.00 2,000 229 SUBTOTAL 2,000 230 231 263000 COMMUNICATION & SECURITY SYSTEMS 232 Fire Alarm 233 Modify, test, program and make connections at existing control panel 1 ls 3,000.00 3,000 234 Duct smoke detector with remote indicator and remote test switch 2 ea 1,200.00 2,400 235 Modules 2 ea 350.00 700 236 Device box 4 ea 42.00 168 237 Circuitry 150 lf 18.00 2,700 238 SUBTOTAL 8,968 239 240 264000 OTHER ELECTRICAL SYSTEMS 241 Common Work Result for Electrical 242 Job conditions, coordination….. 1 ls 1,000.00 1,000 Building Backup Page 7 PMC - Project Management Cost
42 Cross Street 20-Mar-24 Envelope & MEP Upgrades Funding Request Estimate GFA 3,351 UNIT EST'D SUB TOTAL CSI CODE DESCRIPTION QTY UNIT COST COST TOTAL COST Envelope & MEP Upgrades 243 Demolition work 1 ls 2,500.00 2,500 244 Temporary power 1 ls 500.00 500 245 260000 Fees & permits waived 246 SUBTOTAL 4,000 261 262 TOTAL, DIVISION 26 $31,248 263 264 265 32 EXTERIOR IMPROVEMENTS 266 267 320000 Site Demolition 268 320000 Temp fence/gates at roof access point 1 ls 5,000.00 5,000 269 SUBTOTAL 5,000 $ 270 271 323000 Site Improvements 272 Concrete Sidewalks 273 312000 Protect / repair existing 1 ls 3,500.00 3,500 274 SUBTOTAL 3,500 $ 275 276 TOTAL, DIVISION 32 - EXTERIOR IMPROVEMENTS $8,500 277 278 33 SITE UTILITIES 279 280 334000 Storm Drain 281 334000 Connect new downspouts to existing storm drain, allow 3 ea 750.00 2,250 282 SUBTOTAL 2,250 $ 283 284 TOTAL, DIVISION 33 - SITE UTILITIES $2,250 285 Building Backup Page 8 PMC - Project Management Cost