MAIN CONSTRUCTION COST SUMMARY
Envelope & MEP Upgrades
Construction
Start
GSF
Cost/GSF
Estimated Cost
TRADE COSTS
Envelope & MEP Upgrades
Sep-24
3,351
$160.01
$536,181
$536,181
Design and Estimating Contingency
5.0%
$26,809
Escalation
2.0%
$10,724
$573,714
General Conditions
$120,000
General Requirements
4.0%
$22,949
Insurances
2.00%
$11,474
Bond
1.00%
$5,737
Overhead + Profit
12.00%
$68,846
Building Permit
Waived
TOTAL ESTIMATED CONSTRUCTION COST
Sep-24
$3,351
$240
$802,720
ITEMS NOT INCLUDED IN THIS ESTIMATE
Items not included in this estimate are:
All professional fees and insurance
Project phasing
Site or existing conditions surveys investigations costs, including to determine subsoil conditions
Items identified in the design as Not In Contract (NIC)
Items identified in the design as by others
Work to City streets and sidewalks, (except as noted in this estimate)
Lead paint removal/ Haz Mat
This cost estimate was produced from drawings prepared by SOCOTEC AE Consulting, LLC and their design team dated 3/13/24 . Design and
engineering changes occurring subsequent to the issue of these documents have not been incorporated in this estimate.
SUBTOTAL TRADE COSTS
SUBTOTAL
Bidding conditions are expected to be public bidding to pre-qualified (DCAMM certified) general contractors, open bidding for sub-contractors, open
specifications for materials and manufacturers.
The estimate is based on prevailing wage rates for construction in this market and represents a reasonable opinion of cost. It is not a prediction of the
successful bid from a contractor as bids will vary due to fluctuating market conditions, errors and omissions, proprietary specifications, lack or surplus
of bidders, perception of risk, etc. Consequently the estimate is expected to fall within the range of bids from a number of competitive contractors or
subcontractors, however we do not warrant that bids or negotiated prices will not vary from the final construction cost estimate.
This estimate includes all direct construction costs, contractor's overhead and profit and design contingency. Cost escalation is included until start date
indicated.
Executive Summary
Page 2
PMC - Project Management Cost
42 Cross Street
Envelope & MEP Upgrades
Somerville, MA
20-Mar-24
Funding Request Estimate
DIVISION
Subtotal
Total
CONSTRUCTION COST SUMMARY IN CSI FORMAT
DIV. 2 EXISTING CONDITIONS
$23,790
024119
Selective Demolition
$23,790
025000
Hazardous Abatement
Excluded
DIV. 4 MASONRY
040001
Masonry
DIV. 5 METALS
$16,375
055000
Metal Fabrications
$16,375
DIV. 6 WOODS & PLASTICS
$11,873
061000
Rough Carpentry
$10,673
062000
Finish Carpentry
$1,200
DIV. 7 THERMAL & MOISTURE PROTECTION
$187,877
075300
Roofing
$181,955
079200
Joint Sealants
$5,922
DIV. 8 DOORS & WINDOWS
$62,999
082200
FRP Doors
$2,050
085100
Aluminum Windows
$17,640
086200
Skylights
$43,309
DIV. 9 FINISHES
$20,439
092116
Gypsum Board Assemblies
$12,925
099000
Painting
$5,014
DIV. 10 SPECIALTIES
101400
Signage
DIV. 12 FURNISHINGS
$980
124000
Shades
$980
DIV. 21 FIRE PROTECTION
No Scope
210000
Fire Protection
DIV. 22 PLUMBING
$13,200
220000
Plumbing
$13,200
DIV. 23 HVAC
$156,650
230000
HVAC
$156,650
DIV. 26 ELECTRICAL
$31,248
260000
Electrical
$31,248
DIV. 32 EXTERIOR IMPROVEMENTS
$8,500
320000
Site Demolition
$5,000
323000
Site Improvements
$3,500
329000
Landscaping
DIV. 33 SITE UTILITIES
$2,250
334000
Storm Drainage
$2,250
SUBTOTAL DIRECT (TRADE) COST
$536,181
CSI Summary
Page 3
PMC - Project Management Cost
42 Cross Street
20-Mar-24
Envelope & MEP Upgrades
Funding Request Estimate
GFA
3,351
UNIT
EST'D
SUB
TOTAL
CSI
CODE
DESCRIPTION
QTY
UNIT
COST
COST
TOTAL
COST
Envelope & MEP Upgrades
1
GROSS FLOOR AREA
2
3
First Floor
3,351
4
5
TOTAL GROSS FLOOR AREA (GFA)
3,351
sf
6
7
8
02
EXISTING CONDITIONS
9
10
024119
Selective Demolition
11
Remove exterior door and frame, SL; prep for new
1
ea
200.00
200
12
Remove and dispose storefront
98
sf
15.00
1,470
13
024100
Remove roofing systems
Incl below in roofing
14
024100
Remove skylights
258
sf
15.00
3,870
15
024100
Remove roof hatch
1
ea
750.00
750
16
Removal of MEP
See MEP trades
17
024100
Temporary edge protection at perimeter (sides and rear)
1
ea
10,000.00
10,000
18
Misc. demolition/ protection
1
ls
7,500.00
7,500
19
SUBTOTAL
23,790
$
20
21
025000
Hazardous Components Abatement
22
Asbestos abatement to roof
Excluded
23
SUBTOTAL
-
$
24
25
TOTAL, DIVISION 3 - CONCRETE
$23,790
26
27
03
CONCRETE
28
29
033000
Concrete
30
No work in this section
31
SUBTOTAL
-
$
32
33
TOTAL, DIVISION 3 - CONCRETE
34
35
04
MASONRY
36
37
040001
Masonry
38
No work in this section
39
SUBTOTAL
-
$
40
41
TOTAL, DIVISION 4 - MASONRY
42
43
05
METALS
44
45
055000
Metal Fabrications
46
Infill deck at removed hatch
9
sf
75.00
675
47
Repairs to existing deck, assumed not required
3,443
sf
NR
48
Roof ladder with locking security gate
1
ea
8,000.00
8,000
49
Safety guardrail on weighted base
22
lf
350.00
7,700
50
SUBTOTAL
16,375
$
51
52
TOTAL, DIVISION 5 - METALS
$16,375
53
54
06
WOOD & PLASTICS
55
56
061000
Misc. Rough Carpentry
57
Misc. blocking and rough carpentry at new roofing
3,452
sf
1.75
6,041
58
Premium for parapets / roof edge
243
lf
16.00
3,888
59
Misc. blocking and rough carpentry at new windows
45
lf
12.00
540
60
Misc. blocking and rough carpentry at new doors
17
lf
12.00
204
61
SUBTOTAL
10,673
$
62
63
062000
Finish Carpentry
64
New window stool, allow
16
lf
75.00
1,200
65
SUBTOTAL
1,200
$
66
67
TOTAL, DIVISION 6 - WOOD & PLASTICS
$11,873
68
Building Backup
Page 4
PMC - Project Management Cost
42 Cross Street
20-Mar-24
Envelope & MEP Upgrades
Funding Request Estimate
GFA
3,351
UNIT
EST'D
SUB
TOTAL
CSI
CODE
DESCRIPTION
QTY
UNIT
COST
COST
TOTAL
COST
Envelope & MEP Upgrades
69
70
07
THERMAL & MOISTURE PROTECTION
71
72
075300
Roofing
73
075430
Roofing Demolition
74
Remove membrane and ballast including insulation and
flashings; no HAZ MAT assumed
3,452
sf
4.00
13,808
75
024100
Premium for removing existing perimeter, flashing/blocking ,
etc
243
lf
10.00
2,430
76
Premium, vacuum gravel from ribs of steel deck
3,452
sf
1.50
5,178
77
075430
Temp protection allowance
3,452
sf
2.00
6,904
78
075430
Prep existing metal deck to receive new finish
3,452
sf
0.25
863
79
New Roof
80
70002
PVC membrane, on 1/2" high density coverboard on 2 layers
rigid insulation, on vapor barrier on 1/2" protection board
3,452
sf
35.00
120,820
81
70002
Premium for tapered insul (at skylights and equip only)
26
sf
7.50
195
82
70002
Perimeter Details & Flashings
83
Perimeter detail 1/A6 high parapet - 21" parapet cap
49
lf
75.00
3,675
84
Perimeter detail 3/A5 low parapet- 12" parapet cap
145
lf
65.00
9,425
85
70002
Perimeter detail 2/A5 - Drip edge
49
lf
25.00
1,225
86
70002
Flashing at wall, incl cut reglet in brick
8
lf
75.00
600
87
70002
Flashing at low parapet
146
lf
35.00
5,110
88
Flashing at rooflight & equip curb
92
lf
35.00
3,220
89
Flashing to top of large skylight, incl cut reglet in brick
40
lf
75.00
3,000
90
Flashing to sleeper
4
lf
45.00
180
91
Abandoned penetration, remove, infill
7
ea
125.00
875
92
Pipe penetration, gooseneck & vent pipe flashing
5
ea
150.00
750
93
Rubberized pipe support to HVAC
2
ea
100.00
200
94
Walk pads
51
sf
12.00
612
95
Gutters
49
lf
35.00
1,715
96
Downspouts
39
lf
30.00
1,170
97
SUBTOTAL
181,955
$
98
99
079200
Joint Sealants
100
Allowance for misc. sealants at roof
3,452
sf
1.50
5,178
101
070001
Backer rod & double sealant at doors/hm frames
62
lf
12.00
744
102
SUBTOTAL
5,922
$
103
104
TOTAL, DIVISION 7 - THERMAL AND MOISTURE PROTECTION
$187,877
105
106
08
DOORS & WINDOWS
107
108
085100
Aluminum Windows
109
Storefront
98
sf
180.00
17,640
110
SUBTOTAL
17,640
$
111
112
082200
Hollow Metal Doors
113
82200
New fiberglass single door in pressed metal frame and hardware
1
ea
2,050.00
2,050
114
SUBTOTAL
2,050
$
115
116
086200
Skylights
117
86200
Skylight w/ insulated glazing, 4' 4" x 4' 4"
4
ea
2,812.34
11,249
118
86200
Skylight w/ insulated glazing, 40' 0" x 4' 7"
1
ea
32,060.00
32,060
119
SUBTOTAL
43,309
$
120
121
TOTAL, DIVISION 8 - DOORS AND WINDOWS
$62,999
122
123
09
FINISHES
124
125
929000
Gypsum Board Assemblies
126
Patch/ replace gypsum board @ window & door head and jamb,
14" wide - allow
62
lf
25.00
1,550
127
Patch/ replace gypsum board @ skylight average 30" high -
allow
395
sf
25.00
9,875
128
092900
Patch/replace wall & GWB ceilings due to water damage, allow
1
ls
1,500.00
1,500
129
SUBTOTAL
12,925
$
130
Building Backup
Page 5
PMC - Project Management Cost
42 Cross Street
20-Mar-24
Envelope & MEP Upgrades
Funding Request Estimate
GFA
3,351
UNIT
EST'D
SUB
TOTAL
CSI
CODE
DESCRIPTION
QTY
UNIT
COST
COST
TOTAL
COST
Envelope & MEP Upgrades
131
090007
Painting
132
Paint gypsum board at replacement windows
62
lf
5.00
310
133
Paint gypsum board at replacement skylights
988
sf
3.00
2,964
134
Paint/ Stain new wood sill at replacement windows
16
lf
15.00
240
135
Paint/touch up GWB walls & ceilings, due to water damage,
allow
1
ls
1,500.00
1,500
136
SUBTOTAL
5,014
$
137
138
095000
ACT Ceiling
139
Allowance for replacing water damaged tiles
1
ls
2,500.00
2,500
140
SUBTOTAL
2,500
141
142
TOTAL, DIVISION 9 - FINISHES
$20,439
143
144
10
SPECIALTIES
145
146
101400
Signage
147
Assumed no scope required
Excluded
148
SUBTOTAL
-
$
149
150
TOTAL, DIVISION 10
151
152
153
12
FURNISHINGS
154
155
124000
Shades
156
124000
Shade to new storefront
98
sf
10.00
980
157
SUBTOTAL
980
158
159
TOTAL, DIVISION 12 - FURNISHINGS
980
160
147
148
21
FIRE PROTECTION
149
150
210000
FIRE PROTECTION, GENERALLY
151
No work in this section
152
SUBTOTAL
-
153
154
TOTAL - FIRE PROTECTION
169
156
157
22
PLUMBING
158
173
220000
Plumbing
174
Equipment
161
220000
Point of use domestic water heater, 6 kw
3
ea
900.00
2,700
162
220000
Domestic Water Type L Copper Pipe
163
220000
Domestic water heater piping connections with HW piping to
sink
3
ea
1,250.00
3,750
164
220000
Domestic water pipe insulation
3
ea
250.00
750
165
220000
Valves & Accessories
1
ls
500.00
500
166
220000
Miscellaneous
167
220000
Demolition - remove water heater and all HW piping
1
ls
2,000.00
2,000
168
220000
Coordination & BIM
1
ls
2,000.00
2,000
169
220000
Testing and sterilization
1
ls
1,500.00
1,500
170
220000
Fees & permits
waived
185
SUBTOTAL
13,200
$
186
187
TOTAL, DIVISION 26
$13,200
188
189
190
23
HVAC
191
192
230000
HVAC
179
230000
HVAC Equipment
180
230000
Rooftop unit with curb 5 tons, 2000 cfm
2
ea
47,500.00
95,000
Building Backup
Page 6
PMC - Project Management Cost
42 Cross Street
20-Mar-24
Envelope & MEP Upgrades
Funding Request Estimate
GFA
3,351
UNIT
EST'D
SUB
TOTAL
CSI
CODE
DESCRIPTION
QTY
UNIT
COST
COST
TOTAL
COST
Envelope & MEP Upgrades
181
230000
Reinstall ACCU
1
ea
3,600.00
3,600
182
230000
Sheet metal & Accessories
183
230000
Ductwork transitions from RTU to existing main duct
4
ea
2,500.00
10,000
184
230000
Duct insulation
1
ls
2,500.00
2,500
185
230000
Piping
186
230000
Refrigerant Piping
187
230000
Reconnect refrigerant piping to ACCU
1
ls
3,000.00
3,000
188
230000
Condensate Drain Piping
189
230000
Condensate drain piping with fittings & hangers
1
ls
750.00
750
190
230000
Piping Insulation
191
230000
Piping insulation, refrigerant piping connection
1
ls
1,000.00
1,000
192
230000
Automatic Temperature Controls
193
230000
RTU reconnect to existing thermostat
2
ea
3,500.00
7,000
194
230000
Balancing
195
230000
System testing & balancing
1
ls
5,000.00
5,000
196
230000
Miscellaneous
197
230000
Demolition - remove (2) RTU's, ACCU
1
ls
5,000.00
5,000
198
230000
Refrigerant purge and charge
1
ls
2,500.00
2,500
199
230000
Coordination & BIM
1
ls
10,000.00
10,000
200
230000
Coring, sleeves & fire stopping
1
ls
800.00
800
201
230000
Equipment start-up and inspection
1
ls
1,000.00
1,000
202
230000
Rigging & equipment rental
1
ls
9,000.00
9,000
203
230000
Vibration & seismic restraints
1
ls
500.00
500
204
230000
Fees & permits
waived
219
SUBTOTAL
156,650
$
220
221
TOTAL, DIVISION 26
$156,650
222
223
224
26
ELECTRICAL
225
212
261000
SERVICE & DISTRIBUTION
213
Gear & Distribution
214
Normal Power
215
Modify and make connections at existing panelboards
1
ls
2,500.00
2,500
216
Equipment Wiring feeds and connections
217
RTU connections (25A)
2
ea
1,000.00
2,000
218
25A feed to RTU's (30A)
160
lf
20.00
3,200
219
Water heater connection
3
ea
500.00
1,500
220
40A feed to WH
140
lf
22.00
3,080
221
ACCU (Relocated)
1
ea
3,000.00
3,000
222
Heat trace
ETR
223
Motorized damper feed and connection
1
ea
1,000.00
1,000
224
SUBTOTAL
16,280
225
226
262000
LIGHTING & POWER
227
Lighting fixtures
228
Remove and reinstall light fixtures for ceiling removal
(minimal)
1
ls
2,000.00
2,000
229
SUBTOTAL
2,000
230
231
263000
COMMUNICATION & SECURITY SYSTEMS
232
Fire Alarm
233
Modify, test, program and make connections at existing control
panel
1
ls
3,000.00
3,000
234
Duct smoke detector with remote indicator and remote test
switch
2
ea
1,200.00
2,400
235
Modules
2
ea
350.00
700
236
Device box
4
ea
42.00
168
237
Circuitry
150
lf
18.00
2,700
238
SUBTOTAL
8,968
239
240
264000 OTHER ELECTRICAL SYSTEMS
241
Common Work Result for Electrical
242
Job conditions, coordination…..
1
ls
1,000.00
1,000
Building Backup
Page 7
PMC - Project Management Cost
42 Cross Street
20-Mar-24
Envelope & MEP Upgrades
Funding Request Estimate
GFA
3,351
UNIT
EST'D
SUB
TOTAL
CSI
CODE
DESCRIPTION
QTY
UNIT
COST
COST
TOTAL
COST
Envelope & MEP Upgrades
243
Demolition work
1
ls
2,500.00
2,500
244
Temporary power
1
ls
500.00
500
245
260000
Fees & permits
waived
246
SUBTOTAL
4,000
261
262
TOTAL, DIVISION 26
$31,248
263
264
265
32
EXTERIOR IMPROVEMENTS
266
267
320000
Site Demolition
268
320000
Temp fence/gates at roof access point
1
ls
5,000.00
5,000
269
SUBTOTAL
5,000
$
270
271
323000
Site Improvements
272
Concrete Sidewalks
273
312000
Protect / repair existing
1
ls
3,500.00
3,500
274
SUBTOTAL
3,500
$
275
276
TOTAL, DIVISION 32 - EXTERIOR IMPROVEMENTS
$8,500
277
278
33
SITE UTILITIES
279
280
334000
Storm Drain
281
334000
Connect new downspouts to existing storm drain, allow
3
ea
750.00
2,250
282
SUBTOTAL
2,250
$
283
284
TOTAL, DIVISION 33 - SITE UTILITIES
$2,250
285
Building Backup
Page 8
PMC - Project Management Cost