Section 3.1 District Description
A description of the District which must include its name, proposed duration and a general description of the District.
The intent is to identify and familiarize EACC with the District and provide the background necessary to support a
statement explaining why the Municipality has defined the District boundaries as proposed.
Summary
The Somerville DIF contains approximately 450 acres of contiguous mixed use land between Porter
Square and Sullivan Square in southeastern Somerville. The district encompasses several recognized
neighborhoods including Union Square, Inner Belt, Brickbottom, Twin City Plaza, Boynton Yards,
Ames Campus and Wilson Square. The district contains significant portions of the Somerville’s
border with Boston and Cambridge and is located in close proximity to the commercial centers of
both cities. The near tip of the Somerville boundary in Inner Belt is less than a half-mile from
downtown Boston; the core of the district at Union Square is within two miles of Mass General
Hospital/Beacon Hill. The district is also adjacent or in close proximity to Davis Square, Gilman
Square and Broadway in Somerville and the East Cambridge, Kendall Square and Inman Square
districts in Cambridge.
The district is bookended by rail transit with the MBTA Red Line stop at Porter Square on its
western edge and the Orange Line stop at Sullivan Square on its eastern edge and will contain two
stations within its borders – Union Square and Washington Street/Brickbottom when the Green
Line Extension is complete. It is served by the three major corridors of Somerville Avenue,
Washington Street and McGrath Highway/Route 28 and is adjacent a northbound exit off of
Interstate 93.
Map 3.1.1 Regional
Context DIF Boundary
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
36
The DIF district includes the areas of Somerville, outside of Assembly Square, most recognized as
being opportune for future commercial development aside. Inner Belt, Brickbottom, Boynton
Yards, parts of Union Square and Somerville Avenue were once home to vibrant commercial
operations employing thousands. Over time, these areas have experienced declines as rail access was
eliminated. Today, even though these areas are located near the most economically vibrant
municipalities in New England, they are characterized by predominantly low rise structures with
limited employment opportunities – with some exceptions – that underutilize the urban core land
upon which they are located. As rapid transit service is increased in Somerville, these areas are
prime for more intensive development, provided that the current challenges are addressed.
Specifically, the district faces challenges of inadequate infrastructure, inefficient transportation
networks, inadequate availability of open space, underutilized commercial and industrial property,
outmoded industry mix, limited housing options and unmet service needs. Somerville’s goals (see
Section 3.2) are to address these shortcomings across the entire DIF district. However, it is
important to recognize that within the DIF district boundaries, several sub-districts exist that have
their own existing urban character and planning and infrastructure needs. The six (6) identified sub
districts can be seen in Map 3.1.2 and are described below from west to east.
Somerville Avenue West
Geographic Context
This sub-district contains 37 acres currently valued at $79.3 M. It centers on Wilson Square, a small
cluster of commercial uses (mostly retail and auto services) that line the intersection of Somerville
Avenue and Elm Street. The western tip of the Somerville DIF district includes the lowest intensity
end of the Somerville Avenue corridor that terminates at Porter Square / Massachusetts Avenue.
Map 3.1.2 DIF Sub-Districts
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
37
Beacon Street, with connections to Inman Square and continuing to the East Cambridge waterfront,
and Somerville Avenue are the arterial streets serving this sub-district. The Fitchburg rail right of
way serves as the southern border. Park Street acts as the eastern border and the district includes
one parcel deep of street frontage on the northern side of Somerville Avenue before entering the
residential heart of the City.
History
Historically, Somerville Avenue (formerly known as
Milk Row) was a major route for dairy farmers
bringing products from as far north as Lexington and
Concord into markets in Boston. Later the area was
crucial again as transportation node along the
Fitchburg railroad with the Porter Farm as a central
depot for cattle ranchers (Porter House steak).
Transportation remains a central function with the
Red Line stop at Porter Square, the commuter line
out to Fitchburg, multiple bus routes, substantial
automobile traffic and a major thru-way for trucks
heading to Route 2.
Industry Mix
Wilson Square’s prominence as a destination for industry was always secondary to its use as a
through route. Never large to begin with, as economic trends shifted away from industrial and
manufacturing uses, the mix of businesses came to be almost exclusively focused on serving
residential needs.
Out of the 68 establishments in the sub-district there are only three that employ more than twenty
people. Laronga Bakery is the largest employer with 58 jobs. The only non-retail/restaurant
business in the area is A Audio and Video Productions with 50 jobs. The majority of businesses
consist of retail, restaurant and services firms that have between 1 to 8 employees. The lone
manufacturing use is Tri-Star Printing and Graphics on Park Street.
Figure 3.1.2b
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
38
During the 30 year DIF period, Somerville Ave West is not expected to experience transformative
development, but rather targeted infill development. However, there are urban amenities that this
area lacks. The retail frontage along Somerville Avenue could benefit from physical upgrades and a
larger customer base. Conway Park is
significant amenity, but the sub-district
could benefit from a more comprehensive
plan for open space. The ‘midblock’ area
including 588 to 644 Somerville Avenue has
a more muddled industry mix than the rest
of the corridor, but with relatively deep lots
and willing owners who have already started
developing a collective vision, this area
could receive more substantive
development. Much further in the future,
potential exists for substantial transit
oriented development if the Green Line was
extended up the Fitchburg right of way to
Porter Square.
Built Environment
The Somerville Avenue West district is a commercial corridor with a mostly continuous street wall.
The majority of the buildings fall into three categories: residential structures, single story retail
structures with parking in front or two to three story structures with ground floor retail/office and
residential in the upper floors with sideyard, rear or no parking. With only one exception, the multi-
story structures date from the 1920’s or earlier. In contrast, the more recently constructed buildings
are all single story with high parking/lot area ratios, except for the property at 622 Somerville
Avenue. Residential properties are all multi-unit apartment buildings from late 19th/early 20th
century and are clustered in the west end of the district. There are two single story industrial
warehouse buildings located near the Fitchburg right of way, one each on Kent Street and Park
Street.
Transportation and Infrastructure Needs
The soon to be completed Somerville Avenue reconstruction project has significantly upgraded the
pedestrian environment, lighting and street surface in this area. It has also added a signalized
intersection at Elm Street and Somerville Avenue and will update all pre-existing traffic signals. The
project also very importantly addressed regular flooding issues that impacted residents and
businesses alike through sub-surface storm water improvements. While increased transit service is
not expected, the area already has adequate bus service and even the furthest site is within three
quarters of a mile (15 minute walk) of the Porter Square Red Line stop. Hope exists that the Green
Line spur at Union Square will eventually be extended along the Fitchburg right of way and
connected to the Red Line at Porter Square. The area could benefit from creation of a shared use
path along the Fitchburg rail right of way. This would be a significant infrastructure improvement
and would open the door to new opportunities.
Major Parcels
As most of the sub-district already contains structures, there are few vacant sites ready for
redevelopment. Instead, new economic growth will require site assemblage and demolition
activities.
Somerville Ave West Employment
Industry
Establishments
Jobs
Retail
15
167
Business Services
16
99
Restaurant
9
76
Other Services
16
42
Auto Services
9
31
Manufacturing
1
6
Construction
2
3
Figure 3.1.2
68
424
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
39
Of particular interest is an “air rights” development opportunity above the MBTA Porter Square
Station on the Fitchburg Commuter Rail Line. The parcel begins in Cambridge at the station head
house and extends into Somerville to the Beacon Street bridge. The Somerville section measures
approximately 600 feet in length and between 50 and 70 feet in width. Recent analysis shows that
with a zoning upgrade this area could support up to 120 hotel rooms, associated parking, and
ground floor retail. The site holds even more potential if the site were to incorporate three adjacent
privately owned parcels fronting Roseland Street.
The Wilson Square Triangle, formed by the intersection Somerville Avenue and Elm Street, is
another interesting assemblage and redevelopment opportunity. The site is roughly 27,000 sqft and
currently is home to a gas station and suburban style strip mall with excessive surface parking.
Additional parcels could include 20 and 24 Elm Street which would expand the site to 43,000 sqft.
East of Wilson Square and adjacent to Conway Park is a series of nine (9) parcels around 588-644
Somerville Avenue. In 2007, the property owners commissioned an architectural study of the site
which showed that with an up zoning, the 200,000 sqft site, currently used for low intensity
industrial and retail uses, could be redeveloped into 42,000 sqft of retail, 120,000 sqft of office, and
186,000 sqft of residential space.
At the eastern end of this sub-district is a 46,000 sqft lot at 515 Somerville Avenue. The City has
been working with the property owner as environmental remediation of the property is completed
prior to redevelopment. The owner is expected to submit a building permit application for a mixed
use, retail/residential development in the fall of 2011.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
40
Somerville Avenue West – Parcel Map 3.1.3
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
41
Somerville Avenue West – Current Zoning & Building Footprint 3.1.4
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
42
Somerville Avenue West – Current Land Use 3.1.5
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
43
Somerville Avenue Central
Geographic Context
This sub-district contains 27 acres of land with a current assessed value of $67.3 M. This includes
properties on both sides of Somerville Avenue with the MBTA Fitchburg Commuter Rail line, Park
Street and Church Street forming the other boundaries. Somerville Avenue was surveyed and laid
out in the 1680’s as a way of connecting the “Road to Newtown” (now Washington Street) to the
Powder House in west Somerville and on to the Medford Turnpike.
History
The area was originally settled by the Ireland and Tufts families in the early 1790’s as large farming
estates. The first of a growing number of industrial activities began in circa 1820 when Osgood
Dane opened a quarry at what is now Granite Street. The opening of the Fitchburg Railroad in 1836
led to larger scale industrialization of the district, with small factories and coal bunkers located along
the rail right of way. The most prominent of these firms was the American Tube Works, which
opened in 1852 and Ames Safety Envelope that moved into the district in circa 1935 as the Tube
Works was closing its doors.
In the winter of 2010, Ames announced that it was selling its business operations and equipment to
a firm from Wisconsin, thus ending an almost 200 year history of heavy manufacturing in the sub-
district. However, as Ames moves out, the campus of buildings is now available to be repositioned
for other opportunities. Current tenants include First Act, a boutique manufacture of custom
guitars and Hemlock Ink, a silk screening and embroidery firm. The Ames complex is a jumble of
interconnected, custom built buildings that will need close attention as they are subdivided and
repurposed. Particular attention will need to be paid to the provision of parking since parking
resources are quite limited relative to total square footage to be leased.
Somerville Avenue, outside of the Tube Works complex, is lined with a series of residential and
mixed use buildings with retail space on the first floor and residential units on the second, third and
often forth floors. Most of these buildings are in less than optimal condition.
Two institutional uses have a large impact of Somerville Avenue. The first, St. Anthony’s Catholic
Church and School at Properzi Way sits adjacent to the Ames complex. The second, the City
owned, Milk Row Cemetery is trucked between the remaining Tube Works buildings and the Market
Basket, a major regional grocery store. The Market Basket, which was constructed in 1970 on part of
the Tube Works complex, sits behind an overcrowded surface parking lot that dramatically breaks
the rhythm of the street. The recent closing of St. Anthony’s school and the underutilization of its
numerous surface parking lots may provide an opportunity for the redevelopment.
The recent reconstruction and streetscape improvements on Somerville Avenue will greatly improve
this sub-district’s economic viability. As part of this project, the combined sanitary/storm sewer
was separated and enlarged which has eliminated flooding and will provide additional capacity for
future redevelopment. Additionally, two new traffic signals were installed at School Street and Dane
Street, which will improve traffic flow and circulation. Dane Street is one of the few roads in this
district that cross the Fitchburg Railroad. Park Street crosses the railroad but is an “at grade”
crossing. Park Street is also the location of a major fiber optic telecommunications line that serves
the metro area including Boston’s financial district, and Harvard University and MIT.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
44
Industry Mix
Until recently, the Somerville Avenue Central sub-district was dominated by the former Ames Safety
Envelope. Vacated in 2010 by the paper manufacturer, the roughly eight acre site is a contiguous set
of warehousing and light industrial buildings. The business mix is characterized by the now largest
employer - Market Basket, the remaining light industrial in the Ames Campus, and the business
services and auto uses establishments fronting Somerville Avenue. Market Basket, a regional food
grocery chain employs hundreds of workers and is the generator of the most trips in
the sub-district. It has a conventional suburban mall urban form with a large one story building
setback behind a 65,000 SF parking
lot.
Built Environment
Most of the industrial buildings in the
sub-district are built from lot line to
lot line leaving very little room for
horizontal growth. Potential rezoning
of the area could allow for more
vertical development or could allow
additional floors to be dropped into
some of the structures with very high
ceilings. However, since most of the
structures were built when Somerville
was served by streetcars and most
employees lived a short walk from work, there are very limited parking options. Provision of
parking will need to be addressed before this sub-district can thrive.
Transportation and Infrastructure Needs
As a result of the significant investment in Somerville Avenue, infrastructure needs in this sub-
district are modest. However, the area could benefit from the creation of a new shared use path
along the MBTA Fitchburg Commuter Rail line and
construction of shared parking facilities to support
the redevelopment of the campus.
Major Parcels
Major opportunity sites include the Ames Safety
Envelop complex and the remaining American Tube
Works buildings. The Tube Works buildings are of
significant historic value and are being considered for
designation as a Local Historic District, which could
attract federal and state rehabilitation tax credits.
The series of independently owned buildings,
constructed between 1890 and 1915 as part of
Somerville’s first major industrial expansion, all suffer from a lack of parking which make optimizing
the usable space extremely difficult. Opportunity also exists to create a campus environment for the
sub-district using streetscape and architectural elements to tie the disparate buildings together,
creating a sense of place that would be attractive to a number of businesses, including start ups and
tech firms.
Somerville Ave Central Employment
Industry
Establishments
Jobs
Retail
3
403
Business Services
12
83
Auto Services
8
38
Other Services
13
31
Restaurant
2
15
Manufacturing
3
14
Construction
2
13
Figure 3.1.3
43
597
Figure 3.1.5b Transit Access Somerville Ave Central
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
45
The Ames Safety Envelope site is one of the biggest opportunities in Somerville with over seven
acres under single ownership. The site is a series of interconnected industrial buildings constructed
over the past 50 years and incorporates manufacturing, warehouse and distribution, and office space
tucked between Somerville Avenue and the Fitchburg Commuter Rail Line.
The City hopes to work with the owners of Ames and the Tube Works buildings collectively to
develop a comprehensive strategy to unlock their sites’ economic potential.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
46
Somerville Avenue Central – Parcel Map 3.1.6
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
47
Somerville Avenue Central – Current Zoning & Building Footprint 3.1.7
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
48
Somerville Avenue Central – Current Land Use 3.1.8
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
49
Union Square
Geographic Context
The Union Square sub-district includes approximately 70 acres of land currently valued at $201.6 M.
Union Square is at the base of Prospect Hill nestled along the northern bank of the long filled
Millers River. Since the pre-colonial period, this flat plain of relatively dry land has served as a
crossroads. Early in the history of Somerville, Union Square served as a significant juncture,
connecting Charlestown, New Town (Harvard Square), Boston and Medford. The Union Square
sub-district is bound on the south by the Fitchburg Commuter Rail Line and on the north by
Prospect Hill. The eastern edge is formed by the elevated McGrath Highway and the western end
terminates at Church Street.
History
Union Square includes Somerville’s oldest commercial business district at its center and several
surrounding close-knit residential neighborhoods. Nearby are many industrial and warehouse
properties that had historically located near the Fitchburg Branch rail line located immediately south
of the Square. Some of Somerville’s major arterial streets – Washington Street, Somerville Avenue
and Prospect Street – meet on the east side of Union Square. The square includes the Bow Street
Local Historic District, also on the National Register, and the historic Prospect Hill monument
(outside of the DIF boundaries), which commemorates the location where the Revolutionary War’s
first colonial flag was raised. Over the years, Union Square’s fortunes have risen and then declined.
Today, Union Square is stable but has not reached its full potential.
Throughout the past century, Union Square has served multiple roles, often simultaneously – as a
commercial business district, an employment center for blue-collar manufacturing businesses, and as
an entry portal to waves of international immigrants. The Square’s current retail mix, best known
for its many diverse restaurants and food markets, does not fully meet the shopping needs of
surrounding neighborhoods, and the currently attainable rent levels in the Square do not yet
financially support new commercial construction (although new housing development under certain
conditions appears to be financially viable). The Square’s streets are congested with pass through
regional traffic; and although the Square is well-served by buses, it is not served by rapid transit –
which puts the Square at a competitive disadvantage compared with other nearby better-served
squares and commercial centers. Because of the diverse and multiple roles the Square has played in
the past and still plays today, its current identity is not entirely clear.
In 2009, the Board of Aldermen adopted new zoning for Union Square in acknowledgement of the
impending Green Line Station that will be built under the Prospect Street bridge. This zoning
increased the floor area ratios (FARs) throughout the area, thereby allowing substantially more
development opportunity than existed prior. Green building incentives, design guidelines, reduced
parking requirements, and incentives to dedicate land for public infrastructure were all components
of the new zoning.
Industry Mix
Union Square has a strong concentration of restaurant, retail and non-profit establishments.
Including both sides of the street of its major corridors, Union Square contains three linear miles of
active storefront. Along with Davis Square and Broadway it is one of the most vibrant commercial
areas in the city. Within the DIF district, the Union Square sub-district has the greatest number of
establishments.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
50
Other dominant uses in the Square
are services and manufacturing.
These are uses not found in a
typical commercial center at the
scale to which they exist in Union
Square. Some of these uses are
compatible with the district’s retail
theme. However, many others are
inconsistent with maintaining a
viable retail business district. In
particular, the twenty auto and
related establishments have tended
to detract from the quality of the
retail center. These auto uses tend
to occupy single story buildings utilizing a large portion of their lots for garage bays and outdoor
display, thereby negatively impacting the visual quality of the Square. Most of these auto uses are no
longer allowed by zoning and are therefore likely to eventually convert to other uses.
Built Environment
Of the approximately one million square feet of space in Union Square, one third is allocated to
office use (much of which is occupied by government users, non-profits, social service providers,
and charitable organizations), one third to retail, and the balance to services and manufacturing.
This mix of uses serves residents, employees, and customers from the neighborhoods as well as the
region. On the other hand, the mix of businesses unique to Union Square has particular problems
which limit the vitality and growth of commercial activity. Restaurants, for example, are not
sufficiently supported by the patronage that expanded office and service uses could provide and
therefore limit daytime operations. Likewise, some of the convenience and shopping goods sectors
lack breadth and depth or have not adjusted to the changing residential character.
Transportation and Infrastructure Needs
The City is in the middle of a multi-phased Union Square Transportation and Utility plan funded
through a federal earmark with the City
providing the 20% local match. The
project’s goals are to balance the needs and
demands of all modes of transportation
while reclaiming right of way for pedestrian
and bicycle use. The siting of a Green Line
Station at Prospect Street and the Fitchburg
Line creates an opportunity to rethink the
Square and improve the public realm.
The purpose of the Union Square project is
to identify and accommodate existing and
future transportation needs, enhance the
urban landscape, and make Union Square
Union Square Employment
Industry
Establishments
Jobs
Other Services
65
524
Business Services
50
364
Restaurant
30
159
Retail
38
146
Construction
12
70
Auto Services
12
36
Manufacturing
3
4
Figure 3.1.5
210
1303
Fig 3.1.8b Transit Access in Union
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
51
plaza a distinctive destination. Today, the 2 intersections in the heart of Union Square—Somerville
Avenue/Prospect Street and Somerville Avenue/Washington Street/Webster Avenue—operate
with constrained capacity and long delays and queues. The sidewalks around the Square are similarly
constrained, averaging approximately eight (8) feet. Whether in a car or on foot, getting around
Union Square is difficult.
Sub-surface infrastructure is also constrained in this area, as seen by the recent flooding on July 10,
2010 which inundated many properties in the Union Square and East Somerville area. All sanitary
sewers, storm drains and combined sewer systems along Somerville Avenue, Washington Street,
Beacon Street and Elm Street, serving most of southwestern Somerville, including portions of Davis
Square, meet in Union Square into a single combined sewer conduit that was constructed c 1870.
The capacity of this system, as seen on July 10, 2010 is grossly inadequate. Capacity improvements
and the continued separation of storm and sanitary sewer lines will diminish the threat of flooding,
reduce unnecessary processing at Deer Island and cost to the City, and improve environmental
quality. All other utilities are being analyzed to determine the upgrades needed to support the
development anticipated under the new zoning.
Major Parcels
While the northern and western edges of the sub-district contain several historic structures,
opportunity for new development and reuse in these locations. The approximately 27,000 sq. ft.
Union Square Post Office at 237 Washington Street is an example of future adaptive reuse. The
Post Office will be transferring their carrier operations to Chelsea and has indicated that the building
is available for sale. The building sits at the terminus of the Prospect Street view corridor and will
be a major landmark for people exiting the Union Square Green Line Station.
Similarly, the historic and City-owned former fire station at 90/92 Union Square holds potential for
commercial reuse. The building is a focal point of the square as is currently the home of Somerville
Community Access Television, the nation’s first cable access channel, and the Massachusetts
Alliance of Portuguese Speakers. Reuse of this site will require extensive historic renovations and
second floor ADA accessibility improvements.
Sites for wholesale redevelopment include the one- and two-story buildings at 241 and 255 on the
north side of Washington Street directly across the street from 90/92 Union Square. This location
currently contains several quality restaurants, but if combined, this 17,000 square foot site could
support 50,000 square feet of new, mixed use space where the restaurants could be supported by
residents or workers above
Another site in this area is 41-55 Union Square, currently the home of Citizens Bank, Reliable
Market and the Union Smoke Shop. With approximately 45,000 square feet, the site is one of the
largest sites on the north side of the square. The site consists of one and two story retail buildings
front Somerville Avenue with excessive surface parking behind them. This has been identified as
the possible location for a future parking structure with ground floor retail.
The southern and eastern edges of Union Square hold the most potential for transformative
development. A 68,000 square foot lot commonly referred to as the “Kawasaki Block” can be
created by combining eight of the parcels on the south side of Somerville Avenue between Webster
Avenue and Prospect Street. Zoning will allow over 200,000 square feet of mixed use development
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
52
on this site. The site contains several one story buildings hosting mostly restaurants and automobile
maintenance shops.
The Kiley Barrel lots and parcels along Prospect Street present the greatest redevelopment
opportunity in Union Square (referred to as Prospect North and Prospect South in Section 4.3 Goal
Attainment). The site spans the distance between new Union Square Green Line Station and Union
Square Plaza, and future development at this location is needed to link the two in a pedestrian-
friendly way. At over 165,000 square feet, the site will support approximately 660,000 square feet of
office and retail space. The City and Somerville Redevelopment Authority currently own the Kiley
Barrel site. The remaining parcels are split between three private owners. It is important to
recognize that this area of Prospect Street has a long history of heavy industrial use and will need to
undergo significant environmental investigation and remediation before it can be redeveloped.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
53
Union Square – Parcel Map 3.1.9
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
54
Union Square – Current Zoning & Building Footprint 3.1.10
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
55
Union Square – Current Land Use 3.1.11
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
56
Boynton Yards
Geographic Context
This sub-district includes approximately 30 acres of land tucked between the MBTA Fitchburg
Commuter Rail line right of way and the Cambridge border with Prospect Street on the west and
Medford Street on the east. The current value is $66.9 M. Often overlooked, Boynton Yards is
strategically located south of Union Square and north of Inman Square. Its proximity to the
proposed Union Square Green Line Station will allow the City to reposition this sub-district for
significant growth.
History
A majority of Boynton Yards was a tidal estuary of the Boston Harbor known as the Millers River
that showed little promise for development. In 1836, the opening of the Fitchburg Railroad saw the
beginning of its industrial character as portions of the river were filled for right of way. As late as
1852, there were only four buildings in this area - four homes along the Medford Road. In the mid
1850’s on the eve of the Civil War, the banks of the river became home to the Union Glass
Company and several meat packing and rendering businesses, most prominent among them was
Boynton Packing.
The meat packing industry used the Millers River as a disposal site and by 1872 the river was such a
significant quality of life and health issue that the City, under order of the Joint Commission for the
Abatement of the Millers River charged by the State Legislature, began filling the waterway. This
filled land quickly became stockyards for the meat packers and railroad depots. As a result of the
mostly un-engineered filling of the river, the area suffers from flooding and a high water table.
The last rendering plant closed in 1992 and was by the Somerville Redevelopment Authority in 1998
as part of an urban renewal project. The Authority controlled over nine acres in the center of the
district, remediated significant soil contamination, and made roadway and sanitary sewer upgrades in
the area. Initially the redevelopment efforts attracted new businesses to the area, namely Royal
Hospitality, DHL Express, and RCN Cable, but ultimately the district failed to catch hold. Today,
only Royal Hospitality remains. Contributing to the lackluster performance of Boynton Yards is its
inaccessibility and unattractiveness.
Given the area’s close proximity to the future Union Square Green Line Station, significant
development opportunity exists in this location. In recognition, in April 2009, the Board of
Aldermen approved a significant rezoning of the eastern three quarters of Boynton Yards. The new
Transit Oriented Development Districts allow for buildings ranging in height from 85 to 135 feet
with Floor Area Ratios of up to 5.5 for a LEED Gold Certified building. The zoning includes
incentives for developers to donate land for much needed right of way and for park space. It is the
City’s goal to see the dedication of a 40,000 square foot park at the center of the district.
Industry Mix
At present, Boynton Yards houses scrap metal recyclers, auto salvage facilities and several industrial
services firms that collectively employ over 760 people. Largest among them are Gentle Giant
Moving Company, Royal Hospitality laundry, and Green Cab Company which recently relocated
into the neighborhood. One of the newest businesses is Green City Growers, which helps residents
plant and harvest vegetables at home. The multi-tenant building at 561 Windsor Place is home to
several small start ups and artisanal manufacturers like Taza Chocolate, Motobidia, and Fiore di
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
57
Nonno . A “new economy” cluster with businesses like XL Hybrids, Scientific Research
Laboratory, and Smart Surfaces is also emerging within the area.
Built Environment
With the exception of a four-story
former warehouse at 561 Windsor
Place, Boynton Yards consists of a
scattering of mostly one story
buildings and open storage yards
for the auto and metal recycling
industries. All are surrounded by
large asphalt parking lots resulting
in a very low floor area ratio for the
existing development. In addition,
a sizeable vacant lot remains at the
corner of South Street and Harding
Street, this lot was never developed
after being sold by the Somerville Redevelopment Authority. On the far eastern edge of the distinct
along Ward and Horace Streets and to the south along the Cambridge border are a series of two and
three family residential structures fronting or outright surrounded by industrial and commercial uses.
New multi-family development, Union Place, now lines Webster Avenue with 131 units that include
a sizeable affordable component.
Transportation and Infrastructure Needs
Unlike other sub-districts, there is no single
road that traverses Boynton Yard, and that
greatly diminishes the redevelopment
potential of the area. The roadway network
is a series of undersized public and private
rights of way that make cross district travel
nearly imposable. The most famous is the
intersection of South Street and Harding
Street where three one-way road segments
converge at a four way stop causing east
bound vehicles on South Street to back up a
full city block before being able to turn
around. The sub-district also suffers from a
lack of underground infrastructure and is
subject to flooding.
The City recently initiated a major Transportation and Utility Study of the Boynton Yards sub-
district to improve vehicle and pedestrian access and circulation, facilitate a rational development
pattern to maximize development potential, and provide proper municipal utility capacity to support
dense mixed use redevelopment. The study will build upon the Union Square Transportation Study
and the planned reconstruction of Webster Avenue and Prospect Street, on the western edge of the
sub-district. The intent of the study is to create a network of roads, walkways and utilities that
improve circulation and promote redevelopment.
Boynton Yards Employment
Industry
Establishments
Jobs
Retail
4
372
Other Services
18
103
Business Services
17
97
Manufacturing
8
90
Auto Services
12
81
Construction
3
18
Restaurant
0
0
Figure 3.1.7
62
761
Figure 3.1.11b Transit Access in Boynton Yards
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
58
Major Parcels
The 65,000 Sqft Beacon Materials site will be adjacent to the new Union Square Green Line Station
on Prospect Street. The City has already rezoned this parcel in advance of the Green Line
Expansion to TOD 100 which provides for a FAR of 4 (with a green building) and a maximum
height of 100 feet. Redevelopment of this site is the key to linking Boynton Yards to the Green
Line and making the whole sub-district attractive to redevelopment.
Green Cab has recently purchased the 60,000 sqft property at 600 Windsor Place. The City has
entered into a Development Agreement with Green Cab that allows them to operate their taxi
service in the existing building for a period of 10 to 15 years, at the end of which the parcel will be
redeveloped to reflect the zoning of TOD-135. The TOD-135 zone allows a FAR of 5.5 and a
maximum height of 135 feet.
The City has also entered into a Development Agreement with the owners of the Royal Hospitality
commercial laundry facility. The Agreement allows them the temporary expansion of the laundry
use for 10 years before it will be redeveloped to the TOD-100 standard.
The property at 0 Windsor Place is a 70,000 square foot parking lot that was formerly rented by
RCN Cable. The lot is zoned TOD-135.
Gentle Giant owns an 81,000 square foot property that is currently zoned TOD-55 as it buffers a
residential block. The City will be conducting a zoning study for the eastern end of Boynton Yards,
adjacent to the McGrath sub-district and an increase in FAR is possible.
An 86,000 square foot parcel fronting South Street is owned by Nissenbaum Auto Parts. Most of
the site is unimproved. The site is zoned TOD-135.
The largest property in the sub-district is the 150,000 square foot site owned by J.J. Vacarro. This
site has one single story building and one two story buildings on it. The property is zoned TOD-
135.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
59
Boynton Yards – Parcel Map 3.1.12
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
60
Boynton Yards – Current Zoning & Building Footprint 3.1.13
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
61
Boynton Yards – Current Land Use 3.1.14
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
62
McGrath Corridor / Brickbottom
Geographic Context
This sub-district contains 85 acres of land between Union Square and Inner Belt sub-districts and
has an assessed value of $207 M. Massachusetts Route 28 (McGrath Highway) forms a natural spine
for the Corridor. However, due to its elevation, it serves more as barrier to development than an
organizing feature. The eastern boundary of this district is the future right-of-way for the Green
Line Extension which separates the Brickbottom from Inner Belt. Washington Street forms the
northern boundary and provides access to Charlestown and Chelsea to the east and Massachusetts
Avenue (via Somerville Avenue) and Massachusetts Route 2 to the west. The southern boundary of
the sub-district is the Cambridge city line.
History
Located just north of the former Millers River tidal estuary, this flat lowland between Cobble Hill
and Prospect Hill has been an active trade route since shortly after the founding of Charlestown in
1625. The “Road to New Town” (now Washington Street) connected Charlestown to a new
settlement called New Town (just south of Harvard Square in Cambridge). Another route, from the
ferry terminal and later a bridge between Lechmere Point (Cambridge) and Boston to Medford
snaked its way across the city. As the road crossed the Millers River, it split into two, with the Milk
Row branch (now Somerville Avenue, Elm Street, and Collage Avenue) running west before
crossing the other branch at the Old Powder House on its way west to Arlington.
By the 1840’s, the area became home to several of the regions’ brickyards, taking advantage of rich
clay deposits. At the same time, the area was crisscrossed by a series of rail lines that connected
Boston with the north and west and which fed Somerville’s industrialization. Like in Boynton
Yards, the meat packing industry took advantage on the improved rail service and the reclaimed land
from the filling of the Millers River to construct stockyards and slaughterhouses. North of the
Fitchburg Line was Sturtevant and Hadley Beef Company. South of the Grand Junction Line was
John P. Squire and Company. While most of the Squire buildings were raised to construct the Twin
City Shopping Center, a large seven story windowless refrigeration building from 1916 still remains.
As the brick industry relocated out of Somerville, the neighborhood between the Lowell Line and
Medford Street became populated with immigrants from Ireland, Eastern Europe and later Greece,
occupying two and three story residential buildings crammed around older industrial buildings.
These residential buildings were acquired and raised in the 1950’s by the Massachusetts Highway
Department in advance of the Inner Belt Expressway, leaving the industrial buildings intact. When
the highway construction project was finally halted in the 1970’s, the vacant property was sold off to
private owners.
The City is beginning an area planning process for the Brickbottom and Inner Belt Districts to
evaluate development potential, identify needed infrastructure improvements and financing
mechanisms, create an internal street network within the Inner Belt, and determine how to improve
connectivity within the two areas and how to reconnect both to the broader Boston metro region.
The process will also provide the foundation for future rezoning. A consultant will be identified in
September 2010 for the 10-12 month planning process.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
63
Industry Mix
The variety of industries in the McGrath/Brickbottom sub-district can be loosely grouped into two
areas, retail and services. The retail component
including big-box retailers like Target, AJ
Wright and, in Twin City Plaza, Shaw’s, Rite
Aid and Marshalls, all located on the west side
of McGrath.
Service employers are found mostly in the
Brickbottom section of the sub-district east of
McGrath, and in a small triangle of land
between the major retail centers on the west
side of McGrath. Within the Brickbottom,
there are three major anchors, the Brickbottom
Artists Cooperative, Herb Chambers
Mercedes-Benz dealership, and the Waste
Management Waste Transfer Facility. Also in
this area are U-Haul, Cataldo Ambulance
Service and National Grid. In the triangle, between the Fitchburg right of way and Twin City Plaza
can be found a Genzyme storage facility, 1 Beyond, and Thermedical making use of old meat
packing buildings.
Built Environment
Today, the Brickbottom neighborhood of this sub-district is a series of parking lots and one and
two story buildings constructed of brick, concrete block, or steel, with the exception of the
Brickbottom Artist’s Cooperative building which is a five story concrete block former warehouse.
Most of the buildings date to the early 1970’s when the development of the Inner Belt Expressway
was halted and sold the land. A key feature of Brickbottom is the former Municipal Incinerator and
current Waste Transfer Facility at 1 Poplar Street, a City-owned parcel. On the other side of
McGrath Highway is a residential neighborhood of two and three unit buildings built in the
traditional Somerville style. Small commercial building, including reconfigured residential structures
with first floor retail, line Somerville Avenue and Washington Street as they lead into Union Square.
South of Somerville Avenue on a site that was one a stockyard and meat packing plant is a large
1960 style shopping center, now home to Target and AJ Wright, with a sea of surface parking
separating it from the street.
Transportation and Infrastructure Needs
The six lane elevated McGrath Highway and the surface lanes of Medford Street sever different
parts of this sub-district from each other. The south bound lanes of the viaduct are elevated from
north of Washington Street to the far side of the Fitchburg Commuter Line. The north bound lanes
are elevated over the Fitchburg Line, drop to the surface at Poplar Street and then rise back up
midway between Poplar and Washington Street. Under McGrath is a maze of lanes that coral traffic
from Somerville Avenue and Washington Street to various points. This area is confusing, dark,
dingy and unpleasant for motorist, bicyclists and pedestrians alike. The viaduct has been graded as
structurally deficient and the Department of Transportation has initiated a de-elevation study to
evaluate removal of the viaduct and replacement with a at grade urban boulevard rather that
reconstructing the existing structure.
McGrath Employment
Industry
Establishments
Jobs
Retail
35
681
Business Services
36
403
Other Services
35
352
Restaurant
7
124
Auto Services
17
91
Manufacturing
5
65
Construction
6
32
Figure 3.1.9
141
1748
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
64
Under Somerville Avenue, a 103 inch brick combined sewer flows from Union Square to Poplar
Street. Prior to Popular Street, flow is added at Medford Street coming from two additional
combined lines – from the south serving
Boynton Yards and from the north serving the
residential neighborhoods to the north and east
of Prospect Hill. At Poplar Street, the
Somerville Avenue line intersects a major
MWRA Sanitary line coming from Cambridge via
Medford Street and then traverses the sub-district
under Poplar Street, before continuing through
Inner Belt on to Deer Island. The 72 inch brick
combined sewer continues from Poplar Street
under McGrath Highway into Cambridge
increasing in size to 130 inches. Separation of
the combined sewer system is needed to reduce
stormwater flow to Deer Island and eliminate
sewage discharge at the Combined Overflow
Outlets on the Charles and Mystic Rivers.
The planned Washington Street/Brickbottom Green Line Station and extension of the Community
Path will greatly improve access to Brickbottom and the surrounding area. At present, the path is
planned along the Inner Belt side of the Green Line, but Somerville believes potential exists for
another shared use path on the Brickbottom side. In addition, roadways that connect Brickbottom
to Inner Belt are needed through the future Green Line right of way. Somerville has already
discussed this with MassDOT and all are looking at ways to keep the rail line as elevated as feasible
within this area to allow the berm to be punctured by roadways that are not severely depressed, in
contrast to Washington Street which is flooded regularly.
Major Parcels
Ten Poplar Street is a City owned parcel currently leased by Waste Management for a Waste
Transfer Facility. This 91,616 sqft site has significant development potential under the current
zoning and potentially more if rezoned.
With the exception of the Brickbottom Artists Collaborative, which is expected to remain,
significant development opportunity exists throughout the remainder of Brickbottom. The area
planning process will establish the foundation for future development including providing a
foundation for rezoning and determining infrastructure needs.
West of McGrath Highway is the Target/A.J. Wright site at Somerville Avenue and Medford Street.
This 333,000 sqft site was rezoning for TOD-135 allowing for a maximum height of 135 feet and a
Floor Area Ratio of 5.5 for a green building. The Target store is one of the smallest in the chain and
lacks many of the amenities other Target’s provide.
Figure 3.1.14b Transit Access in McGrath/Brickbottom
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
65
McGrath / Brickbottom– Parcel Map 3.1.15
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
66
McGrath / Brickbottom – Current Zoning with Building Footprints 3.1.16
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
67
McGrath / Brickbottom – Current Land Use 3.1.17
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
68
Inner Belt
Geographic Context
This 195 acre sub-district provides the greatest opportunity for wholesale redevelopment and the
greatest obstacles to redevelopment. The total current valuation is $275 M. The Inner Belt is
predominately a manufacturing and warehouse district located in southeast section of the city and
bordering the Charlestown neighborhood of Boston. It is sandwiched between I-93, Route 28 and
Fitchburg Commuter Rail Line. The district is bisected by Lowell Commuter Rail Line and the Pan
Am Yard 10 lead, creating northern and southern sections. Although the sub-district is adjacent to
the McGrath Corridor, North Point in Cambridge and Sullivan Square in Charlestown, it is isolated
from them by highways and rail lines.
The only access to the southern section of Inner Belt is through a 25 year-old underpass, referred to
as the “Tubes”. Although designed to be temporary structures decades ago, MBTA engineers have
classified the tubes as structurally sound and in good condition. This is despite the fact that large
trucks get stuck in the tubes with some regularity.
History
In its early history, the Inner Belt was common range land for the colonists of the Charlestown
glacial drumlin (Somerville was originally part of Charlestown but separated by an isthmus known as
the “Neck”). Following the battles at Lexington and Concord in 1775, the Cobble Hill drumlin was
fortified by colonial troops because of its strategic location overlooking Boston Harbor and
Charlestown to the east and the Millers River to the south. Cobble Hill, and the larger
fortifications on Prospect Hill, is where the colonial troops retreated after the disastrous losses at
Bunker Hill. At the end of the war, the district became the country estate of Joseph Barrell, a
successful Boston merchant who made a fortune as a privateer and smuggler during the war.
Following Barrell’s death the estate was purchased from his heirs by Massachusetts General Hospital
to be the future home of the McLean Asylum for the Insane.
The McLean Asylum operated from 1811 to 1895. The advancement of the railroad north out of
Boston soon cut Cobble Hill off from Millers River and the tidal estuary of Boston harbor and the
Charlestown Mill Pond. Slowly the land between the rail lines was filled to make way for stockyards,
meat packing, rail yards and other noxious industrial uses until the noise and environmental quality
became so bad that the Asylum was forced to relocate to a more pastoral setting. When the Boston
and Maine Railroad purchased the land, they cleared it of buildings and trees, and raised the hill to
fill in the remaining wetlands between Somerville and Charlestown.
By the 1930’s, the whole sub-district, with the exception of the strip of land between Washington
Street and what is now New Washington Street, was completely taken over by the Boston and Maine
Railroad. The remaining portion of land south of Washington Street was heavy industry that was
rail dependent. In the late 1940’s, fright transportation began to shift away from rail to the open
roads and once-valuable rail yards were slowly removed to make way for new industrial uses. A new
industrial park was planned for the Yard 10 in the space between what is now New Washington
Street and the Lowell Line. An access point into the southern district was created when two
corrugated metal tubes were jacked under the Lowell Line and a new road was extended south from
Washington Street.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
69
By the mid 1950’s, a new regional expressway called the Inner Belt was planned that would bisect
the site between the older industrial buildings on Washington Street and the new industrial buildings
on the former Yard 10 land. Called the Inner Belt Expressway, it would have connected I-93 on the
east with Route 2 in the west following the path of the Fitchburg Railroad through Porter Square.
After years of protest and community organizing, plans for the Inner Belt Expressway were
withdrawn and the right of way that is now New Washington Street was transferred to the City. In
1968, the Somerville Redevelopment Authority created an Urban Renewal District for the land
between Washington and New Washington Streets. In 1982, Corcoran and Jennison constructed
the Cobble Hill Apartments, a 224 unit low income senior complex and strip mall on 10 acres, and
a hotel and parking garage were constructed at the corner of Washington Street and Inner Belt
Road.
The last in a series of short sighted infrastructure decisions was the construction of the Boston
Engine Terminal at the southern end of the Inner Belt. Its rail operations further separate
Somerville and Cambridge and took approximately 20 acres of developable land permanently off the
tax rolls
New hope for revitalization came in the form of fiber optic infrastructure. In 2001, installation of
major telecommunications infrastructure along the Inner Belt Road was intended to attract jobs and
investment from the telecommunication industry; however, a drastic downturn in the economy
brought the telecom movement to a halt across the region. Thus, despite the fiber optic
infrastructure in place and the development of new buildings, the area suffers from isolation due to
lack of vehicle and pedestrian access.
City plans call for the continuation of the Community Path from Davis Square to Boston on a right
of way that would run parallel with the Green Line extension. Additional shared use paths could be
built along the Fitchburg Commuter Line through Union Square to Porter Square, and along the
Grand Junction rail line into Cambridge to connect with Kendall Square and MIT.
Industry Mix
The Inner Belt sub-district is zoned Industrial A (IA) and has attracted a number of manufacturing
and warehousing firms in the past. The largest
employer in the sub-district is Angelica Textile
Services, a commercial laundry facility that
provides and cleans linens for local hospitals
and hotels. Angelica occupies half of a former
Sweetheart Cup factory. South of the Lowell
Line are two major internet hotels at 50 and 70
Inner Belt Road, which are located there to
take advantage of the ultra high capacity fiber.
Neither of these firms provides much in the
way employment but are both large
contributors of property tax revenue. Near the
end of Inner Belt Road businesses such as
Partners Health Care (which operates a records
management facility), VDA Events Design
Group, and United Refrigeration.
Inner Belt Employment
Industry
Establishments
Jobs
Other Services
20
3127
Retail
17
523
Business Services
14
212
Restaurant
10
58
Manufacturing
1
22
Construction
2
10
Auto Services
3
5
Figure 3.1.11
67
3957
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
70
Built Environment
The Inner Belt sub-district is predominately comprised of one and two story industrial buildings
built between 1950’s and 1970’s. The properties were constructed by private owners without the aid
of a master development plan promulgating inefficient land use and poor infrastructure investments.
The one exception to this is the relatively new four story structure at 200 Inner Belt Road which was
build for telecom uses just as the tech bubble burst. The building has sat largely vacant until just
recently and is approximately 50% occupied. At 150 Inner Belt, the twin building to 200 Inner Belt
has a zoning permit, but the permit has not yet been exercised.
On the northern edge of the sub-district is the Cobble Hill Apartments, a three and four story
suburban style apartment complex. The tallest building in the sub-district is the Holiday Inn at nine
(9) stories, which was built in 1973.
Opposite the Cobble Hill Apartments and Holiday Inn is a series of residential and commercial
structures that front Washington Street. Among the storefronts and scattered residences are two
historic properties at 113 and 117 Washington Street. The Ireland house at 117 Washington Street
is the oldest building on Washington Street and dates from 1792. Also north of Washington is a
narrow strip of land that runs between the Lowell Line and Tufts Street. At the far end of this strip
is a one store warehouse and former dry cleaning processing facility that is the source of a
contaminated ground water plumb that extends several blocks down gradient.
Transportation and Infrastructure Needs
The Inner Belt is severely impacted by railroad and automobile infrastructure that separates it from
its surroundings. Future redevelopment of the
Inner Belt requires improved access through
these barriers. Specifically, the elevated railroad
berm that will become the right of way for the
Green Line extension separates Inner Belt from
Brickbottom. The Lowell Commuter Line, also
on an elevated berm, divides Inner Belt north
from south and allows connectivity only through
the two tubes. I-93 and the Orange
Line/commuter rail right of way on the east
separates Inner Belt from Charlestown. In
addition, along its southern border, Inner Belt is
separated from Cambridge and the North Point
Development by the Fitchburg Commuter Rail
Line and the Boston Engine Terminal lead tracks.
The City has supported a plan, now associated
with the Urban Ring, of extending Inner Belt
Road by viaduct over the rail lines and
connecting to North Point and Rte. 28 (O’Brian
Highway).
Inner Belt Road forms the spine of the sub-district. The “J” shaped road travels from Washington
Street on the north, through the tubes, to the BET where it turns west, continues an additional 1,000
feet before stopping just shy of the Lowell Line. Branching off of Inner Belt Road are New
Washington Street and 1st Avenue, north of the Lowell Line, and 2nd and 3rd Street, south of Lowell.
Figure 3.1.1b Transit Access in Inner Belt
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
71
Branching off of New Washington is Cobble Hill Road which crosses the Yard 10 lead to service
buildings just north of the Lowell Line. All of these roads, with the exception of New Washington
Street, are undersized and in need of reconstruction.
The Inner Belt sub-district is regularly subject to stormwater flooding. A major storm drain was
constructed in the 1920’s as part of the Boston & Maine’s filling of the estuary. It runs east from
Inner Belt Road on the north to a point under the Yard 10 Lead before turning south to run parallel
with I-93, under the BET to the Millers River Outfall on the Charles River downstream from the
Dam. The lack of maintenance on this line has allowed sentiment to build up to where there is no
capacity to deal with storm events, thereby causing surface flooding on a regular basis.
Major Parcels
The Inner Belt sub-district has been targeted by the City for transformative development. A
wholesale reworking of the sub-district would require a new road network to create buildable blocks
for private development. A recent Scoping Study conducted by CBT/Greenburg estimates up to 5
million square feet of mixed use commercial, residential and, tech/lab space could be developed on
the site.
The vacant land at 150 Inner Belt is over 184,000 sqft and currently has a Special Permit to
construct a 190,000 s.f. structure that mirrors the existing four story building at 200 Inner Belt.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
72
Inner Belt – Parcel Map 3.1.18
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
73
Inner Belt – Current Zoning with Building Footprints 3.1.19
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
74
Inner Belt – Current Land Use 3.1.20
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
75
Section 3.2 Objectives / Goals
A description of the Applicant’s objective or goal in creating the District. This subsection should include information
which the Applicant believes will be helpful to the EACC in arriving at its conclusion that it is reasonably probable
that the Applicant will achieve its goals in creating the District.
Somerville has developed eight (8) goals that will guide activities within the DIF District. These are:
• Ensure the provision of adequate infrastructure (e.g., sewer, drainage, water, communications,
electricity, gas, telecommunications and roadways) to support growth anticipated throughout the
district.
• Strengthen the multi-modal transportation network so that it accommodates anticipated traffic
demand while being accessible, inviting and safe for pedestrians, bicyclists, and transit riders.
• Create an inviting urban streetscape and public realm that improves connectivity and promotes a
strong sense of community through physical improvements, events and programming.
• Catalyze development and promote land transformation of underutilized parcels through site
preparation and development activities such as brownfield remediation, property acquisition,
new construction, and thoughtful restoration of existing buildings, as appropriate, in a manner
respectful of the area’s historic character.
• Focus on business development activities that produce a vibrant urban environment with an
emphasis on daytime foot traffic and a complimentary mix of industries and job types.
• Maintain a diversity of housing options while increasing the overall supply of affordable units.
• Provide a range of services to residents that will improve health, offer educational opportunities
and training for low and moderate income persons, increase ADA accessibility, and benefit the
young and old.
• Develop processes and regulations that promote active community engagement, ensure
transparency in government, and encourage private interests to be stewards of the public good.
Somerville’s DIF goals are building blocks designed to stimulate the local economy and capitalize on
the impending transit investment that will bring six new stations to Somerville. By breaking down
the tasks needed to prepare for transit into manageable components – e.g., infrastructure, catalyst
projects, affordable housing, etc. – they can each be planned for, managed, and tracked in a
systematic manner. A plan such as the DIF plan and the citywide comprehensive plan, which is
presently being drafted, will help the DIF Administrators make thoughtful decisions about how to
deploy resources to make the goals into reality.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
76
Section 3.3 Public Notice
Documentation of the public notice procedures used during the District approval process. Include a copy of the notice
and a copy of the mailing or distribution list. In addition to the general notice, notice must be given to taxpayers
located in the District, the chief elected officers and the chairpersons of the legislative bodies of abutting cities and / or
towns, and the EACC. The public may also include underlying and overlapping governmental entities, the
Applicant’s own planning department and conservation commission, and any other parties the Applicant considers
important to the reasonably probable success of the DIF program. A transparent and all inclusive process is the end
goal.
A copy of the Public Meeting Notice, legal ad, and mailing/distribution list can be found at
Appendix 2.
Section 3.4 Written Record of Public Hearing
A copy of the written record of the public hearings relating to the District and any written comments that have been
provided to the Applicant by members of the public concerning the District. The Applicant may provide a summary to
facilitate the EACC’s review but is not required to do so.
A copy of the written record of the public hearing can be found at Appendix 3.
Section 3.5 Certification of Compliance with the Local
Approval Requirements
A certificate from the Municipality stating that it has fully complied with the local approval requirements specified in
402 CMR 3.00, Section 3.04 with regard to the proposed District. These include:
a)
Designation or creation of an entity that will be responsible for the District
b)
A public hearing prior to adoption of the District and a written record of such hearing
c)
Notice to the public of the public hearing and the opportunity to comment in writing on the proposed District
d)
Evidence that all information required in 402 CMR 3.06(a-j) {and, if the Program was approved
concurrently, Section 3.08(3) regarding the Program} have been provided to the municipal governing body prior to its
approval of the District {and Program}.
Certification from the City of Somerville stating that it has fully complied with the local approval
requirements can be found at Appendix 4.
Section 3.6 Approving Order
A certified copy of a formal, duly enacted order of the city or town council of the Applicant (with evidence of approval
by the mayor or city manager where such approval is required by law) or vote of the town meeting of the Municipality,
whichever is applicable, identifying and approving the proposed District. In addition, include the following:
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
77
a)
The entities and / or individuals (including their titles, qualifications and contact information, if not already
identified on the contact sheet) who may act on behalf of the Municipality in implementing the Program within such
District
b)
Describe where policy control rests, whether staff is dedicated or shared and their respective powers
c)
Itemize administrative costs and provision for payment of administrative expenses
d)
Any other information which is necessary to understand the administration and operations of the District.
A certified copy of the Board action identifying and approving the proposed District can be found
at Appendix 5.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
78
Section 3.7 Maps
Maps and / or plans of the proposed District and the surrounding area showing:
a)
District boundaries
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
79
b)
Any significant District features that help define the nature and scope of the District which may include
topographical, natural or hazardous environmental features
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
80
c)
Property lines, building foot prints and parking areas
Parcel maps are also available in greater spatial detail in section 3.1. These maps include building
footprints and parking areas.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
81
d)
Existing uses and ownership of each parcel (Identify land in mixed use and public land)
The ownership list is available in Appendix 6. Land use maps are also available in greater spatial
detail in section 3.1.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
82
e)
Current zoning
Current zoning maps are broken up into sub-districts to show detail of zones.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
83
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
84
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
85
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
86
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
87
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
88
f)
Areas for future zoning study
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
89
g)
Existing Land Use
Land use maps are also available in greater spatial detail in section 3.1.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
90
h)
Future Land Use
Future land use maps are broken up into sub-districts to show detail of zones.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
91
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
92
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
93
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
94
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
95
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
96
i)
All thoroughfares, public rights of way and easements.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
97
Section 3.8 Assessed Value Information
AV information including, but not limited to:
a)
A copy of the Assessor’s certification of the original, base AV of the taxable real and personal property
within the District
Total Assessment in the Somerville DIF District: $933,534,500 as of January 1, 2010. A copy of the
Assessor’s Certification can be found in Appendix 6.
b)
The AV of each parcel of real estate within the District
The Assessed Value of Each Parcel can be found in Appendix 6.
c)
The most recent annual property tax levy on each parcel within the District
A copy of the Most Recent Annual Property Tax Levy can be found in Appendix 6.
d)
Past due taxes as well as any significant* historic delinquencies for each parcel
A copy of Past Due Taxes and Significant Historic Delinquencies can be found in Appendix 6.
e)
Any pending appeals or significant* historic appeals for each parcel
A copy of the Pending Appeals and Significant Historic Appeals can be found in Appendix 6.
f)
Any significant* personal property or concentrations in personal property
A copy of the Significant Personal Property or Concentrations in Personal Property can be found in
Appendix 6.
g)
Any District major taxpayers and their percent of the District’s AV
A copy of the Major Taxpayers and Percent of District’s AV can be found in Appendix 6.
*Note: “Significant” should be defined in the context of current character of the District as well as in its improved,
future nature. In any event, a delinquency or concentration equal to or over 5% should be reported. Consideration of
the previous 5 years is sufficient for historic reporting.
Application for the Massachusetts District Improvement Financing Program
Draft as of 9/23/2010
98
Section 3.9 IRD Information
a) A statement identifying parcels, if any, within the IRD that are subject to a Tax Increment Financing (TIF –
EDIP Program) agreement, an Urban Center Housing Tax Increment Financing (UCH-TIF) agreement or a
special tax assessment pursuant to M.G.L. c. 23A, § 3E(3)
None.
b) A copy of the TIF or UCH-TIF agreements impacting parcels in the IRD
None.
c) A statement describing the impact of this IRD on existing and future economic development agreements including
the Economic Development Incentive Program.
N/A