Matters ▸ Attachment
Committee Report - PUPW - 1-29-13 — File 194306
January 29, 2013
Public Utilities and Public Works Committee
Page 1 of 4
Printed 2/3/2013
REPORT OF THE PUBLIC UTILITIES AND PUBLIC WORKS COMMITTEE
Attendee Name
Title
Status
Arrived
Sean T. O’Donovan
Chair
Present
Thomas F. Taylor
Vice Chair
Absent
Rebekah Gewirtz
Ward Six Alderman
Absent
John M Connolly
Alderman At Large
Present
Alderman Connolly was appointed to the committee for this meeting only, to effectuate a quorum.
•
UPDATE : Noise at Verizon facility
•
UPDATE : Street light repair contract
190133 - That the Public Utilities and Public Works Committee discuss the damage done to
the roof of 140 Willow Avenue by the utility companies working there.:
RESULT:
WORK COMPLETED
190372 - That the Commissioner of Public Works appear before this Board’s Committee
on Public Utilities and Public Works regarding the lack of handicap ramps at the
intersection of Highland Road and Kidder Avenue.:
RESULT:
WORK COMPLETED
191056 - That the Commissioner of Public Works contact the appropriate utilities to
address the overloaded and low hanging wires at Somerville Avenue at Kent Street,
Somerville Avenue at Linden Street, and along Tyler Street.:
RESULT:
KEPT IN COMMITTEE
191365 - That the ADA Compliance Officer conduct an assessment of ADA accessibility at
the corner of Somerville Avenue and Kent Street and provide the findings to the Ward 2
Alderman.:
Committee Meeting
January 29, 2013
Public Utilities and Public Works Committee
Page 2 of 4
Printed 2/3/2013
RESULT:
KEPT IN COMMITTEE
192598 - That the Director of Communications appear at the next meeting of the Public
Works and Utilities Committee with an update and cost of the cable, internet and telephone
providers in Somerville.:
RESULT:
WORK COMPLETED
192776 - That the Commissioner of Public Works and the City Engineer meet with the
Ward 7 Alderman and concerned citizens to discuss the conditions of the bike path in
Ward 7 and outline plans to make repairs to the retaining wall and prevent flooding.:
RESULT:
KEPT IN COMMITTEE
193750 - That the Commissioner of Public Works add the double poles at College Hill
Avenue, Raymond and North Streets, Conwell Ave (between Curtis and Hillsdale),
Chetwynd Road, Curtis Street and 9 Granite Street to his utility company “double pole”
list, and that the Superintendent of Lines and Lights appear at the September 19, 2012
meeting of the Public Utilities and Works Committee.:
RESULT:
KEPT IN COMMITTEE
193752 - That the Commissioner of Public Works and the City Engineer appear at the
September 19, 2012 meeting of the Public Utilities and Works Committee to report on the
failure of the utility companies to re-surface streets after opening them.:
RESULT:
WORK COMPLETED
193754 - That the Commissioner of Public Works and the City Engineer appear at the
September 19, 2012 meeting of the Public Utilities and Works Committee to report on
Cedar Street sewer and drainage issues.:
RESULT:
KEPT IN COMMITTEE
193965 - That the Commissioner of Public Works remove the graffiti from the Lowell
Street bridge.:
RESULT:
WORK COMPLETED
193966 - That the City Clerk request that the State Delegation contact the MBTA to
remove all graffiti from the retaining wall between the railroad tracks and the Lowell
Street bridge.:
Committee Meeting
January 29, 2013
Public Utilities and Public Works Committee
Page 3 of 4
Printed 2/3/2013
•
Alderman Connolly's motion that the Director of Transportation and Infrastructure
contact the MBTA and Somerville's state delegation regarding the eradication of all
graffiti on the retaining wall between the railroad tracks and the Lowell Street bridge,
was approved.
RESULT:
KEPT IN COMMITTEE
194040 - That the Commissioner of Public Works repair all sidewalk panels at 27
Josephine Avenue.:
RESULT:
WORK COMPLETED
194043 - That the Commissioner of Public Works and the Director of SPCD construct
handicap crosswalks and ramps at Highland Road and Kidder Avenue.:
RESULT:
WORK COMPLETED
194044 - That the Director of SPCD and the City Arborist analyze the safety of the large
tree across from the Kennedy School and report back in writing to the Ward 5 Alderman.:
RESULT:
WORK COMPLETED
194049 - That the Commissioner of Public Works erect a barrier or fence at the bottom of
Nashua Street that can withstand the force of snow plows pushing snow into it.:
•
Alderman Connolly's motion that the Director of Transportation and Infrastructure
contact the MBTA and Somerville's state delegation to remedy the problems regarding
the fence at the end of Nashua Street, was approved.
RESULT:
WORK COMPLETED
194050 - That the Commissioner of Public Works address the storm drain and runoff
issues at the bottom of Nashua Street.:
RESULT:
WORK COMPLETED
194198 - That the Commissioner of Public Works update this Board’s Committee on Public
Utilities and Works on the repair/replacement of street-lamps city-wide.:
RESULT:
WORK COMPLETED
194245 - That the Clerk of Committees notify NStar to appear before this Board’s
Committee on Public Utilities and Works to explain their unresponsiveness to previous
requests to repair or mitigate problems with their utility poles at 44 Vernon Street.:
Committee Meeting
January 29, 2013
Public Utilities and Public Works Committee
Page 4 of 4
Printed 2/3/2013
RESULT:
KEPT IN COMMITTEE