Matters ▸ Attachment
Committee Report - PUPW - 8-22-13 — File 195371
August 22, 2013
Public Utilities and Public Works Committee
Page 1 of 2
Printed 8/22/2013
REPORT OF THE PUBLIC UTILITIES AND PUBLIC WORKS COMMITTEE
Attendee Name
Title
Status
Arrived
Courtney O'Keefe
Chair
Present
Thomas F. Taylor
Vice Chair
Absent
Maureen Bastardi
Ward One Alderman
Present
193754 - That the Commissioner of Public Works and the City Engineer appear at the
September 19, 2012 meeting of the Public Utilities and Works Committee to report on
Cedar Street sewer and drainage issues.:
RESULT:
WORK COMPLETED
193966 - That the City Clerk request that the State Delegation contact the MBTA to
remove all graffiti from the retaining wall between the railroad tracks and the Lowell
Street bridge.:
RESULT:
WORK COMPLETED
194057 - That this Board requests that the Administration, the Director of Traffic and
Parking and the Commissioner of Public Works work with the ESCS contractor to
coordinate the installation of raised crosswalks around the school.:
RESULT:
DISCHARGED W/NO RECOMMENDATION
194351 - That the Commissioner of Public Works place Beacon Terrace on the 2013 re-
paving list.:
Chairman O'Keefe's motion that the City Engineer respond in writing to item #194351 and
report back to the Committee on Public Utilities and Public Works and to the Ward 2 Alderman,
regarding adding Beacon Terrace to the 2013 re-paving list, was approved.
RESULT:
KEPT IN COMMITTEE
Committee Meeting
August 22, 2013
Public Utilities and Public Works Committee
Page 2 of 2
Printed 8/22/2013
194393 - That the Commissioner of Public Works, the City Arborist and the Director of
SPCD (Transportation and Infrastructure) evaluate the tree at 191 Cedar Street for safety
issues.:
RESULT:
KEPT IN COMMITTEE
194792 - That the Commissioner of Public Works address the raised sidewalk panel at 31
Adrian Street.:
RESULT:
WORK COMPLETED
194972 - That the Commissioner of Public Works update the Ward 6 Alderman on the new
street cleaning and trash barrel maintenance for Davis Square, and evaluate whether more
barrels would improve conditions.:
RESULT:
WORK COMPLETED
195032 - That the Commissioner of Public Works update the Ward 2 and 3 Aldermen on
street cleaning and trash barrel maintenance for Union Square, and whether more barrels
would improve conditions.:
RESULT:
WORK COMPLETED
195088 - That the Commissioner of Public Works report to this Board all of the trees taken
down this calendar year that have fallen under the category of imminent risk to public
safety, as well as a list of all the hearings that have occurred in advance of public shade tree
removal.:
RESULT:
KEPT IN COMMITTEE
195148 - DPW Commissioner responding to various Board Orders from this meeting.:
RESULT:
WORK COMPLETED