REPORT OF THE TRAFFIC AND PARKING COMMITTEE
Attendee Name
Title
Status
Arrived
Robert J. McWatters
Chair
Present
Rebekah L. Gewirtz
Vice Chair
Absent
Tony Lafuente
Ward Four Alderman
Present
Approval of the Minutes of June 26, 2012, October 02, 2012, October 13, 2010, December
01, 2010, February 08, 2011, February 23, 2011, July 14, 2011, January 17, 2012, January
17, 2012, February 21, 2012, December 06, 2012
RESULT:
APPROVED
192634 - That the Director of Traffic and Parking explain the increase of large truck traffic
entering Magoun Square from the Medford and Route 93 areas.:
RESULT:
KEPT IN COMMITTEE
192685 - Director of Traffic and Parking responding to various Board Orders.:
RESULT:
WORK COMPLETED
193978 - That the Director of Traffic and Parking investigate the cause of the recent
critical injury at the intersection of Packard Avenue and Powderhouse Boulevard and
report back to this Board on any necessary action.:
RESULT:
WORK COMPLETED
193987 - That the Director of Traffic and Parking investigate the legality of the crosswalks
at Willow Avenue, Elm Street and Beech Street.:
RESULT:
WORK COMPLETED
Committee Meeting
February 12, 2014
Traffic and Parking Committee
Page 2 of 7
Printed 2/12/2014
194042 - That the Director of Traffic and Parking place a NO TURN 4 – 6 PM sign at
Glenwood Road from Medford Street.:
RESULT:
WORK COMPLETED
194045 - That the Director of Traffic and Parking place two speed limit signs on Mossland
Street.:
RESULT:
WORK COMPLETED
194103 - Director of Traffic and Parking responding to various Board Orders.:
RESULT:
WORK COMPLETED
194216 - Director of Traffic and Parking responding to various Board Orders.:
RESULT:
WORK COMPLETED
194333 - That this Board requests that the Traffic Commission review existing GO SLOW
SCHOOL signals and other signage around schools, and add additional signals and signage
as needed, to ensure that there is appropriate traffic signage and signals to protect students
from speeding vehicles.:
RESULT:
WORK COMPLETED
194349 - That the Commissioner of Public Works or the Director of Traffic and Parking
install a DEAD END sign at the entrance to Vinal Street.:
RESULT:
WORK COMPLETED
194350 - That the Commissioner of Public Works or the Director of Traffic and Parking
install a DEAD END sign at the entrance to Beacon Terrace.:
RESULT:
WORK COMPLETED
194429 - Director of Traffic and Parking responding to #194349 re: Vinal St., and #194350
re: Beacon Terrace.:
RESULT:
WORK COMPLETED
194457 - That the Director of Traffic and Parking report to this Board the feasibility of
extending the 48 hour parking rule beyond 48 hours to accommodate those going out of
Committee Meeting
February 12, 2014
Traffic and Parking Committee
Page 3 of 7
Printed 2/12/2014
town, and other circumstances, as determined appropriate by this Board in coordination
with the Traffic Commission.:
RESULT:
WORK COMPLETED
194660 - That the Director of Traffic and Parking provide this Board with the feasibility of
a change to the City's parking regulations along major streets to improve parking for
residents and businesses.:
RESULT:
WORK COMPLETED
194680 - That the Director of Traffic and Parking install stronger NO PARKING signage
between the driveways at 2 Wheeler Street.:
RESULT:
WORK COMPLETED
194794 - That the Commissioner of Public Works and/or the Director of Traffic and
Parking ensure that the road striping of Shore Drive be done with the consideration that
parking is only allowed on one side of the street, and that crosswalks also be installed.:
RESULT:
WORK COMPLETED
194821 - That the Director of SPCD and the Director of Traffic and Parking include a full
analysis of the traffic problem on College Avenue, from Davis Square to the Powderhouse
Rotary, in the upcoming Somerville by Design Davis Square project, and that concrete
solutions be vetted and implemented.:
RESULT:
WORK COMPLETED
194823 - That the Director of Traffic and Parking install a sign at the entrance of Marshall
Street, on the Broadway end, limiting traffic to residents only between 7 and 9 AM.:
RESULT:
WORK COMPLETED
194841 - That the Director of Traffic and Parking present the attached recommendations
for Kidder Avenue to the Traffic Commission for consideration.:
RESULT:
WORK COMPLETED
194919 - Director of Traffic and Parking responding to various Board Orders.:
RESULT:
WORK COMPLETED
Committee Meeting
February 12, 2014
Traffic and Parking Committee
Page 4 of 7
Printed 2/12/2014
194958 - That the Director of Traffic and Parking and the Traffic Engineer investigate the
parking situation on Cedar Street, near Trum Field, that is causing accessibility issues for
neighbors getting in and out of their driveways during the spring to fall months.:
RESULT:
WORK COMPLETED
195028 - Director of Traffic and Parking responding to various Board Orders.:
RESULT:
WORK COMPLETED
195109 - Director of Traffic and Parking responding to various Board Orders.:
RESULT:
WORK COMPLETED
195172 - That the Director of Traffic and Parking and the Traffic Engineer determine if a
crosswalk can be installed at the bus stop in front of the Somerville Hospital.:
RESULT:
WORK COMPLETED
195238 - That the Director of Traffic and Parking and the City Traffic Engineer meet with
the Ward 2 Alderman concerning pedestrian and cyclist safety issues at the intersections of
Oxford and Beacon Streets and Somerville Avenue and Beacon Street.:
RESULT:
WORK COMPLETED
195240 - That the Traffic Commission consider eliminating parking spots alongside Trum
Field, on Cedar Street towards Franey Road, to allow residents to access their driveways.:
RESULT:
WORK COMPLETED
195241 - That the Director of Traffic and Parking and the Traffic Engineer work with the
Ward 5 Alderman to make exiting side streets onto Medford Street safer.:
RESULT:
WORK COMPLETED
195294 - That the Director of Traffic and Parking reverse the one way direction of traffic
on Village Street to mitigate the effects of increased traffic due to the addition of residential
units.:
RESULT:
WORK COMPLETED
195300 - Director of Traffic and Parking responding to various Board Orders.:
Committee Meeting
February 12, 2014
Traffic and Parking Committee
Page 5 of 7
Printed 2/12/2014
RESULT:
WORK COMPLETED
195308 - That the Director of Traffic and Parking survey the Cedar Street residents
abutting Trum Field regarding the proposed request to eliminate parking spots there so
residents can access their driveways.:
RESULT:
WORK COMPLETED
195397 - Director of Traffic and Parking responding to various Board Orders.:
RESULT:
WORK COMPLETED
195516 - That the Director of Traffic and Parking observe and re-calibrate the light at
Lowell and Medford Streets.:
RESULT:
WORK COMPLETED
195592 - That the Director of Traffic and Parking conduct all necessary studies required to
place a legal truck ban on Powderhouse Boulevard.:
RESULT:
WORK COMPLETED
195724 - That the Director of Traffic and Parking work with the Department of
Transportation to create a bike lane from Cutter Avenue onto Highland Avenue, to
prevent injury to cyclists, pedestrians and drivers.:
RESULT:
WORK COMPLETED
195778 - Traffic and Parking Interim Director submitting responses to various Board
Orders from the 9/26/13 BOA meeting.:
RESULT:
WORK COMPLETED
195815 - That the Director of Traffic and Parking improve the signage at the corner of
Lowell and Richardson Streets to make it less confusing.:
RESULT:
WORK COMPLETED
195821 - That the Director of Traffic and Parking and the Traffic Engineer provide
suggestions on how to improve traffic safety and visibility at the corner of Central and
Forster Streets.:
Committee Meeting
February 12, 2014
Traffic and Parking Committee
Page 6 of 7
Printed 2/12/2014
RESULT:
WORK COMPLETED
195827 - That the Director of Traffic and Parking inform this Board on the legality of the
NO TRUCKS signs on Powderhouse Blvd.:
RESULT:
WORK COMPLETED
195836 - That the Director of Traffic and Parking and the Traffic Engineer evaluate the
intersection of Hunting and South Streets and the intersection of Warren and Medford
Streets and make recommendations regarding traffic regulations to alleviate problems of
cut through and speeding traffic.:
RESULT:
WORK COMPLETED
195947 - Traffic and Parking Interim Director submitting responses to various Board
Orders.:
RESULT:
WORK COMPLETED
195971 - Traffic and Parking Interim Director submitting responses to various Board
Orders.:
RESULT:
WORK COMPLETED
196076 - That the Director of Traffic and Parking provide this Board with a report on the
number of tickets issued, and the resulting revenue, during a typical snow storm and its
impact, i.e., the effectiveness of those penalties during the next storm.:
RESULT:
WORK COMPLETED
196079 - That the Director of Traffic and Parking install a NO PARKING sign at the
garage entrance between the two driveways of 240 Pearl Street.:
RESULT:
WORK COMPLETED
196080 - That the Director of Traffic and Parking contact Mass Highway to install the
proper traffic signals at the intersection of Route 28 and Mystic Avenue.:
RESULT:
WORK COMPLETED
196153 - That the Director of Traffic and Parking enforce the time frame of the special
daytime parking permits on the streets surrounding Davis Square.:
Committee Meeting
February 12, 2014
Traffic and Parking Committee
Page 7 of 7
Printed 2/12/2014
RESULT:
WORK COMPLETED
196155 - That the Director of Traffic and Parking consider installing an appropriate traffic
signal at the intersection of Cameron Avenue and Holland Street until a study is performed
relative to the future use of the Powderhouse Community School.:
RESULT:
KEPT IN COMMITTEE
196158 - That the Director of Traffic and Parking consider putting a crosswalk across
Broadway connecting the ramps from Belknap Street to Garrison Avenue and towards the
bus stop.:
RESULT:
WORK COMPLETED
196171 - Traffic and Parking Interim Director submitting a response to various Board
Orders.:
RESULT:
WORK COMPLETED
196185 - That the Commissioner of Public Works provide a timeline to replace the traffic
signal at the intersection of Washington and Beacon Streets.:
RESULT:
KEPT IN COMMITTEE