CITY OF SOMERVILLE, MASSACHUSETTS
DEPARTMENT OF PUBLIC WORKS
KATJANA BALLANTYNE
MAYOR
JILL LATHAN
ERIC WEISMAN
DPW COMMISSIONER
DIRECTOR OF OPERATIONS
1
Date: October 11, 2022
RE: PUPW Meeting Agenda Items
22-1572 That the Commissioner of Public Works take the necessary steps to remove the cable
tied around the telephone pole at Lexington Avenue and Cedar Street.
This was completed by DPW on 10/7/22.
22-1213: An order that the Commissioner of Public Works immediately replace the three outdoor
picnic tables on the plaza outside the Somerville Media Center due to their unsafe condition.
These have been repaired by the DPW Grounds Division.
22-1118: An order that the Commissioner of Public Works add stone or concrete landscape
features to prevent vehicles from driving over the planted bump-out features on Beacon Street.
Stone or landscape features are vulnerable to getting hit/damaged from vehicular traffic. DPW,
in consultation with Mobility & Engineering may be able to look into alternative solutions, but
this work would need to be looked into further. DPW cannot commit to a timeline on such a
project at this time.
22-1117: That the Commissioner of Public Works provide this Council with the plan for
maintaining new tree wells along Somerville Avenue and other locations.
The tree wells along Somerville Avenue are subject to warranty replacement claims through the
Engineering Department. These plantings are scheduled to be weeded and replanted where
necessary. In the meantime, Grounds has added these facilities to their debris schedule and has
been removing litter. Long-term, the Engineering department is developing a scope for a contract
to maintain the City’s Green Infrastructure, including these locations. The DPW will continue to
maintain other new tree wells as they are created.
22-1374: An order that the Commissioner of Public Works expedite the fixing of the elevator in
the Armory.
Our current vendor (3 Phase elevator) provided repair and prep to the elevator car and
mechanical system before the state inspection on the evening of July 27th. The leveler needed to
be adjusted, which is what tells the car to allow the door to open when it is in proper alignment
CITY OF SOMERVILLE, MASSACHUSETTS
DEPARTMENT OF PUBLIC WORKS
KATJANA BALLANTYNE
MAYOR
2
with the floor. The elevator did pass the mechanical and safety inspection and has been
operational since with no reported issues.
22-0934: That the Commissioner of Public Works make rain barrels available, at no cost, to any
properties within the city’s flood zones.
DPW is continuing to work with the Office of Sustainability and Environment on a solution for
providing rain barrels -at a cost- to all residents. Unfortunately, the vendor we previously
worked with no longer provides municipal rain barrel services. Providing rain barrels to some
residents for free would require future assessment by the Law and Finance departments, among
possibly others as well. This may be revisited as this work moves forward.