REPORT OF THE FLOOD FORUM SPECIAL COMMITTEE
Meeting as a Committee of the Whole
Attendee Name
Title
Status
Arrived
Maryann M. Heuston
Chair
Present
Mark Niedergang
Vice Chair
Present
Robert J. McWatters
Ward Three Alderman
Present
Rebekah L. Gewirtz
Ward Six Alderman
Present
Mary Jo Rossetti
Alderman at Large
Present
Katjana Ballantyne
Ward Seven Alderman
Present
John M. Connolly
Alderman At Large
Present
Matthew McLaughlin
Ward One Alderman
Absent
Tony Lafuente
Ward Four Alderman
Absent
Dennis M. Sullivan
Alderman At Large
Absent
William A. White Jr.
Alderman At Large
Absent
Others present: Water Supt. Ginger Barrett, Michael Glavin - OSPCD, Goran Smiljic - ISD, Matthew
Buckley - Law, Melissa Miguel - City Engineer, Stan Koty – DPW
193933 - That the City Engineer report to this Board the steps that are being taken to
mitigate flooding on streets that are regularly flooded, including Simpson Avenue.:
The committee heard reports of flooding on Newburn Street and Morrison Avenue.
RESULT:
KEPT IN COMMITTEE
195792 - That the City Engineer investigate flooding occurrences in the Hunting and South
Street area and provide his findings and recommendations to the Ward 2 Alderman.:
RESULT:
KEPT IN COMMITTEE
196782 - That the City Engineer and the Water Superintendent prepare a summary of
water and sewer work completed in 2013 near Dane Avenue, Dane Street and Washington
Committee of the Whole
October 7, 2014
Flood Forum Special Committee
Page 2 of 4
Printed 10/9/2014
Street, and include plans for work near Kingman Road and Clark Street, and present this
summary to this Board’s Flood Forum Committee.:
RESULT:
KEPT IN COMMITTEE
196958 - DPW Commissioner responding to various Board Orders submitted April 24,
2014.:
RESULT:
KEPT IN COMMITTEE
197471 - That the City Engineer, the Director of SPCD, and the Superintendent of ISD
advise this Board of their plan to manage and eliminate flooding on streets, in houses and
in businesses throughout the city.:
RESULT:
KEPT IN COMMITTEE
197624 - That the City Solicitor draft an ordinance to require backflow regulators in new
construction.:
RESULT:
KEPT IN COMMITTEE
197636 - That the Administration provide this Board with a detailed explanation of how
future flooding events throughout the city will be mitigated and a plan to upgrade the
dated city piping infrastructure.:
Residents spoke about having to deal with flooding events, some as far back as 1986, and their
experiences in having to deal with sewerage during those events. Alderman Rossetti spoke about
flooding on parts of the bike path and read statements from constituents who were unable to
attend this meeting.
Ms. Miguel spoke about the city’s sewer lines and the planned retention tank in Union Square
and the sewer separation projects in Union Square and on Cedar Street. The sewer system is
being cleaned, which should help to alleviate some of the problems, and a capital improvement
plan is being worked on. Ms. Miguel noted that even if the system was separated, flash flooding
would continue to be a problem. Ms. Miguel told the members that it would take a few years to
remedy the problems and would cost about $5.3 billion to fix problems in the entire system.
RESULT:
KEPT IN COMMITTEE
197637 - That the City Solicitor draft an ordinance requiring developers of new residential
projects to install backflow preventers to prevent combined sewer overflow during heavy
rains.:
There was a discussion about backflow preventers and why they were not required.
Committee of the Whole
October 7, 2014
Flood Forum Special Committee
Page 3 of 4
Printed 10/9/2014
RESULT:
KEPT IN COMMITTEE
197645 - That the Commissioner of Public Works investigate the sewer overflow problems
on Richdale Avenue, especially in front of 12 Richdale Avenue.:
RESULT:
KEPT IN COMMITTEE
197649 - That the Commissioner of Public Works clear sewer drains of leaves and other
debris on Cedar Street between Highland Avenue and Summer Street, and on surrounding
streets.:
RESULT:
KEPT IN COMMITTEE
197657 - That the Commissioner of Public Works prevent storm drain backups on
Richdale Avenue.:
RESULT:
KEPT IN COMMITTEE
197661 - That the Commissioner of Public Works and the City Engineer determine if there
are infrastructure problems on Richdale Avenue that contributed to the severe flooding
during the last two storms.:
RESULT:
KEPT IN COMMITTEE
197684 - DPW Commissioner responding to various Board Orders submitted 8/28/14.:
RESULT:
KEPT IN COMMITTEE
197706 - That the Director of SPCD (ISD) report to the Flood Forum Special Committee on
the enforcement of Ordinances 11-33 and 11-145 regarding increasing pervious surfaces.:
RESULT:
KEPT IN COMMITTEE
197712 - That the Water Superintendent report to this Board on participation in the newly
enacted Water Infrastructure legislation signed by the Governor on August 6, 2014.:
Ms. Barrett discussed eligibility requirements, additional tax revenue to pay for work,
public/private partnerships, loans from the MWRA and identification of additional projects over
the next 6 months. Mr. Buckley discussed the state plumbing code and when backflow
preventers are required, noting that the city cannot supersede state law.
Committee members expressed concern that requests for work have taken so long and discussed
the de-paving of city property, citing the amount of concrete and asphalt throughout the city as a
problem.
Committee of the Whole
October 7, 2014
Flood Forum Special Committee
Page 4 of 4
Printed 10/9/2014
The committee also discussed the “stretch code” used in Cambridge, sub-grade development in
areas with a history of flooding, ways to better inform the public, and having discussions with
both the Planning and Zoning Boards regarding backflow preventer requirements. Mr. Smiljic
will review the plumbing code, and its interpretation, and report back to the committee.