Matters ▸ Attachment
Finance - 2022-10-20 FY23 CIP Bond Reqs (with 22-1662, 22-1663, 22-1664, 22-1665) — File 22-1662
Various Capital Investment Plan
Appropriation Requests
City Council Finance Committee
Mayor Katjana Ballantyne
Richard E. Raiche, PE, PMP, MCPPO
Director of Infrastructure & Asset Management
20 October 2022
Outline
• Sewer Enterprise recurring CIP
• Agenda item 20, ID # 22-1664 – Sewer system evaluation
• Agenda item 18, ID # 22-1662 – Sewer system rehabilitation
• Water Enterprise recurring CIP
• Agenda item 19, ID # 22-1663 – Water main rehabilitation
• Agenda item 21, ID # 22-1665 – Lead water service replacement
2
FY2023 Sewer Capital
Investment Plan Bond Requests
City Council Finance Committee
Mayor Katjana Ballantyne
Richard E. Raiche, PE, PMP, MCPPO
Director of Infrastructure & Asset Management
20 October 2022
ID # 22-1664 – Requesting authorization to
borrow $1,730,000 in a bond, and to
appropriate the same amount for the annual
recurring FY23 Sewer System Evaluation
and Infiltration/Inflow Assessment.
Annual SSES & I/I Program
Agenda Item 20
4
FY19 / Greater DSQ condition assessment results
• 6.8 miles inspected (4% of system)
• 2.2 miles require heavy cleaning (33% of inspected)
• 123 cubic yards debris estimated (approx. 10 truck loads)
• 18 locations require dig-and-replace spot repairs
• 7 locations require trenchless spot repairs
• 0.8 miles require full trenchless structural rehabilitation (12% of inspected)
• 1.1 miles require trenchless lining to eliminate I/I (16% of inspected)
5
FY20 / Ward 2 Condition assessment results
• 24.7 miles inspected (14.5% of system)
• 8 miles heavy cleaning (33% of inspected)
• 280 tons of debris removed (24 truckloads)
• 45 pipes require full-length dig replacement / 110 spot repairs
• 4 miles require trenchless rehabilitation / 36 spot repairs (16% of
inspected)
• 5.3 miles could not access
• Percentages similar to Greater DSQ area
6
• Note: Covid-19 skipped FY21
Request (completed FY20 work)
FY22 / Lower Broadway assessment results
Ongoing Project
Complete Through 9/30/22 │At Project’s Completion (Estimated)
• 16.0 miles inspected (44% of project) │36.4 miles (21% of system)
• 58 tons of debris removed│132 tons
• 0.9 miles require full-length dig replacement (6% of inspected) │2.1 miles
• 2.4 miles require trenchless rehab. & 28 spot repairs (15% of inspected) │5.5 miles & 64 spot repairs
• 38,000 gal. per day of infiltration from 2300 observed defects │86,000 gpd / 5200 defects
• Field observations and findings similar to Greater DSQ and Ward 2
7
May 2022 Water & Sewer CIP
8
ID # 22-1662 – Requesting
authorization to borrow $4,390,000 in a
bond, and to appropriate the same
amount for the recurring FY23 Sewer
Improvements program.
Recurring project to repair sewer defects identified by SSES
Agenda Item 18
9
FY22 Update
• Ward 2 Sewer Rehab
• 14 point-repairs completed; 3
point-repairs remaining.
• 182 LF of 10-inch and 215 LF of
8-inch gravity sewer pipe
replaced; 50 LF of gravity sewer
replacement remaining.
• 150 LF of water main relocated
• 6,250 LF of cured-in-place sewer
pipe lining; early November
through January 2023
10
FY23 Intended Use
• Winter Hill and East Somerville Sewer Rehabilitation
• Target infiltration removal and highest severity structural
defects
11
• Planned Scope of Work:
• Trenchless Rehabilitation:
10,000 LF
• Full-Length Dig Replacement:
3,000 LF
• Design complete early 2023
• Bidding Spring 2023
May 2022 Water & Sewer CIP
12
FY2023 Water Capital
Investment Plan Bond Requests
City Council Finance Committee
Mayor Katjana Ballantyne
Richard E. Raiche, PE, PMP, MCPPO
Director of Infrastructure & Asset Management
20 October 2022
ID # 22-1663 – Requesting authorization to
borrow $7,110,000 in a bond, and to
appropriate the same amount for the
recurring FY23 Water Main Rehabilitation
program.
Annual Water System Improvement Program
Agenda Item 19
14
FY21 Work completed
• Holland and Broadway Water Main Rehabilitations
• 1,653 LF cleaned and lined
• 695 LF completed on Holland Street
• 958 LF completed on Broadway
• 64 water gate valves were replaced
• 28 valves replaced on Holland Street water main
• 36 valves replaced on Broadway
• 3 Lead service replacements completed
• Note: FY22 used for Spring Hill Sewer Separation area
15
FY2023 Intended Use
• Central Broadway
• High likelihood and consequence of failure based
on 2020 risk-based plan.
• Connects to primary source of water (MWRA) for
this area of the City.
• Remove debris accumulation (tuberculation) and
install cementitious liner to protect existing pipe.
• Planned Scope:
• 2,800 LF of 14-inch water main,
• 4,050 LF of 12-inch water main and
• 450 LF of 10-inch water main.
16
FY2023 Intended Use
• Central Broadway – Planned Limit of Work
17
March 2019 Water & Sewer CIP
18
ID # 22-1665 – Requesting authorization to
borrow $1,477,738 in a bond, and to
appropriate the same amount for
participation in the FY23 MWRA Lead Line
Replacement Program.
Annual Water System Improvement Program
Agenda Item 21
19
Lead water service
replacement program
• Entering third year of construction
• 194 services replaced to date
• 30 services confirmed non-lead containing
• 100 service replacements planned for
Phase 3
• Brochures mailed and information available
at:
• https://www.somervillema.gov/departments
/programs/lead-service-line-replacement-
program
20
March 2019 Water & Sewer CIP
21
Various Capital Investment Plan
Appropriation Requests
City Council Finance Committee
Mayor Katjana Ballantyne
Richard E. Raiche, PE, PMP, MCPPO
Director of Infrastructure & Asset Management
20 October 2022