Committee Report - Flood - 10-30-14 — File 197991
October 30, 2014
Flood Forum Special Committee
Page 1 of 4
Printed 11/11/2014
REPORT OF THE FLOOD FORUM SPECIAL COMMITTEE
Attendee Name
Title
Status
Arrived
Maryann M. Heuston
Chair
Present
Mark Niedergang
Vice Chair
Present
Robert J. McWatters
Ward Three Alderman
Absent
Others present: Alderman Mary Jo Rossetti, Alderman Katjana Ballantyne, Alderman Matt McLaughlin,
Frank Wright, Omar Boukili, Michael Glavin, Melissa Miguel, Stan Koty
Approval of the Minutes of October 07, 2014
RESULT:
APPROVED
193933 - That the City Engineer report to this Board the steps that are being taken to
mitigate flooding on streets that are regularly flooded, including Simpson Avenue.:
This item was discussed with 197471 & 197636
Ms. Miguel gave a brief and said that upgrades, while sometimes not visible, are being done.
The Cedar Street sewer separation project work has been going on behind the scenes for the past
year and will cost about $7 million to construct. Somerville's system is a combined system with
storm water & sewer on the same line. The estimated cost to upgrade the entire city's system
would be $5.3 billion.
400 catch basin are being cleaned each week cleaned. In a recent 2 week period, 225 tons of
debris have been removed from catch basins in Ward 2, alone. The city is working to develop a
15-year capital improvement plan for its aging sewer system. 85% of sewer water from
Somerville, goes to Deer Island for processing. 40% of the water treated at the MWRA is I/I
(Inflow and Infiltration).
Ms. Miquel requested that a project in Union Sq. Be halted and redesigned, since it wasn’t
headed toward a sewer separation system.
Ms. Miguel explained that sump pumps not allowed to be discharged into Somerville's sewer
system, since the MWRA does not allow groundwater to be treated. Her recommendations to
Committee Meeting
October 30, 2014
Flood Forum Special Committee
Page 2 of 4
Printed 11/11/2014
property owners is to install an underslab groundwater drainage system & to waterproof
foundations.
Mr. Koty noted that a lot of work was previously done in West Somerville in the past 4-5 years.
Chairman Heuston requested a list of any projects performed between 4 and 10 years ago.
Several residents were allow to comment on their experiences and Ms. Miguel offered to speak
with residents about specific concerns.
RESULT:
WORK COMPLETED
195792 - That the City Engineer investigate flooding occurrences in the Hunting and South
Street area and provide his findings and recommendations to the Ward 2 Alderman.:
RESULT:
WORK COMPLETED
196782 - That the City Engineer and the Water Superintendent prepare a summary of
water and sewer work completed in 2013 near Dane Avenue, Dane Street and Washington
Street, and include plans for work near Kingman Road and Clark Street, and present this
summary to this Board’s Flood Forum Committee.:
RESULT:
WORK COMPLETED
196958 - DPW Commissioner responding to various Board Orders submitted April 24,
2014.:
RESULT:
PLACED ON FILE
197471 - That the City Engineer, the Director of SPCD, and the Superintendent of ISD
advise this Board of their plan to manage and eliminate flooding on streets, in houses and
in businesses throughout the city.:
RESULT:
WORK COMPLETED
197624 - That the City Solicitor draft an ordinance to require backflow regulators in new
construction.:
This item discussed with # 197637
Mr. Boukili stated that regulations addressing this matter are already on the books in Somerville.
Chairman Heuston stated that the process of getting the city where it wants to be on this issue is
more important than the route taken to get there.
Committee Meeting
October 30, 2014
Flood Forum Special Committee
Page 3 of 4
Printed 11/11/2014
After some discussion, the committee determined that it needs additional information:
•
Is a permit is needed to install a backflow preventer?
•
Are backflow preventer installations inspected?
•
Can the installation of backflow preventers be made a condition of building
permits?
RESULT:
KEPT IN COMMITTEE
197636 - That the Administration provide this Board with a detailed explanation of how
future flooding events throughout the city will be mitigated and a plan to upgrade the
dated city piping infrastructure.:
RESULT:
WORK COMPLETED
197637 - That the City Solicitor draft an ordinance requiring developers of new residential
projects to install backflow preventers to prevent combined sewer overflow during heavy
rains.:
RESULT:
KEPT IN COMMITTEE
197645 - That the Commissioner of Public Works investigate the sewer overflow problems
on Richdale Avenue, especially in front of 12 Richdale Avenue.:
RESULT:
WORK COMPLETED
197649 - That the Commissioner of Public Works clear sewer drains of leaves and other
debris on Cedar Street between Highland Avenue and Summer Street, and on surrounding
streets.:
RESULT:
WORK COMPLETED
197657 - That the Commissioner of Public Works prevent storm drain backups on
Richdale Avenue.:
RESULT:
WORK COMPLETED
197661 - That the Commissioner of Public Works and the City Engineer determine if there
are infrastructure problems on Richdale Avenue that contributed to the severe flooding
during the last two storms.:
RESULT:
WORK COMPLETED
Committee Meeting
October 30, 2014
Flood Forum Special Committee
Page 4 of 4
Printed 11/11/2014
197684 - DPW Commissioner responding to various Board Orders submitted 8/28/14.:
RESULT:
PLACED ON FILE
197706 - That the Director of SPCD (ISD) report to the Flood Forum Special Committee on
the enforcement of Ordinances 11-33 and 11-145 regarding increasing pervious surfaces.:
This is a concern throughout the city and has been discussed by several of the BOA's
committees.
The item will be referred to the Legislative Matters Committee to be discussed as a Committee
of the Whole.
RESULT:
REFERRED FOR RECOMMENDATION
197712 - That the Water Superintendent report to this Board on participation in the newly
enacted Water Infrastructure legislation signed by the Governor on August 6, 2014.:
RESULT:
WORK COMPLETED
197836 - DPW Commissioner responding to various Board Orders submitted 9/11/14.:
RESULT:
PLACED ON FILE
197858 - DPW Commissioner responding to various Board Orders submitted 9/23/14.:
RESULT:
PLACED ON FILE