Matters ▸ Order
File 201797
That the Director of Engineering add Porter Street, between Summer and Elm Streets, to the 5-year paving plan, and include the streets off the west side of Porter Street, especially Carver Street.
That the Director of Engineering add Porter Street, between Summer and Elm Streets, to the 5-year paving plan, and include the streets off the west side of Porter Street, especially Carver Street.