Matters ▸ Order
File 202104
That the Director of Traffic and Parking and the Director of Engineering report to this Board on the timeframe for re-striping crosswalks that are erased due to repaving or construction.
That the Director of Traffic and Parking and the Director of Engineering report to this Board on the timeframe for re-striping crosswalks that are erased due to repaving or construction.