Matters ▸ Order
File 210207
That the Director of SPCD and the Commissioner of Public Works work with MA DOT to install a temporary protected pedestrian lane on the Rt. 28/Fellsway Mystic River Bridge.
That the Director of SPCD and the Commissioner of Public Works work with MA DOT to install a temporary protected pedestrian lane on the Rt. 28/Fellsway Mystic River Bridge.