Matters ▸ Order
File 22-2115
That the Director of Engineering install a protective guard over the expansion joint on the Medford Street bridge, as it poses a safety risk for bicyclists.
That the Director of Engineering install a protective guard over the expansion joint on the Medford Street bridge, as it poses a safety risk for bicyclists.